Critical Temporary Retaining Wall Design Sample Clauses

Critical Temporary Retaining Wall Design. A critical temporary retaining wall is defined as a wall required during the construction stage only to protect existing facilities during excavation operations, when other construction methods such as benching or sloping are not practical. These walls may be removed and reused after completion of the work. Such systems as steel sheet pilings, soldier beams and lagging, or other similar systems are commonly used. In such cases, the Consultant is responsible for designing and detailing the wall in the set of contract plans. Critical temporary retaining walls are anticipated to be required at the following locations: [Add locations here]
AutoNDA by SimpleDocs

Related to Critical Temporary Retaining Wall Design

  • Performance Improvement Plan timely and accurate completion of key actions due within the reporting period 100 percent The Supplier will design and develop an improvement plan and agree milestones and deliverables with the Authority

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Pavement Design If applicable, the Engineer shall incorporate the pavement design developed by the State for this project. If the pavement design is not available, the State may request the Engineer to perform pavement design and submit to State for review and approval.

  • Annual Plan On or before November 1 of each calendar year during the Term, Manager shall prepare and submit to Owner for its approval a proposed annual plan for the promotion, operation, leasing, repair and maintenance of the Project for each calendar year (the "Proposed Annual Plan"). For purposes of this Agreement, a "Fiscal Year" shall mean a calendar year beginning on the first day of January and ending on the last day of December. The Annual Plan for the remaining portion of Fiscal Year 2003 is attached hereto as Exhibit "A".

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

Time is Money Join Law Insider Premium to draft better contracts faster.