Monitoring Locations Sample Clauses

Monitoring Locations. 2.3.1 Monitoring locations AMS2 and AMS7 were set up at the proposed locations in accordance with Project Specific EM&A Manual. For AMS6 (Dragonair/CNAC (Group) Building), permission on setting up and carrying out impact monitoring works was sought, however, access to the premise has not been granted yet on this report issuing date. For monitoring location AMS3 (Ho Yu College), as proposed in the Project Specific EM&A Manual, approval for carrying out impact monitoring could not be obtained from the principal of the school. Permission on setting up and carrying out impact monitoring works at nearby sensitive receivers, like Caribbean Coast and Coastal Skyline, was also sought. However, approvals for carrying out impact monitoring works within their premises were not obtained. Impact air quality monitoring was conducted at site boundary of the site office area in Works Area WA2 (AMS3B) respectively. Same baseline and Action Level for air quality, as derived from the baseline monitoring data recorded at Ho Yu College, was adopted for this alternative air quality location.
AutoNDA by SimpleDocs
Monitoring Locations. 3.3.1 Monitoring locations NMS2 was set up at the proposed locations in accordance with Project Specific EM&A Manual. However, for monitoring location NMS3 (Ho Yu College), as proposed in the Project Specific EM&A Manual, approval for carrying out impact monitoring could not be obtained from the principal of the school. Permission on setting up and carrying out impact monitoring works at nearby sensitive receivers, like Caribbean Coast and Coastal Skyline, was also sought. However, approvals for carrying out impact monitoring works within their premises were not obtained. Impact noise monitoring was conducted at site boundary of the site office area in Works Area WA2 (NMS3B) respectively. Same baseline noise level (as derived from the baseline monitoring data recorded at Ho Yu College) and Limit Level were adopted for this alternative noise monitoring location.
Monitoring Locations. 4.4.1 In accordance with the Project Specific EM&A Manual, twenty-one stations (9 Impact Stations, 7 Sensitive Receiver Stations and 5 Control/Far Field Stations) were designated for impact water quality monitoring. The nine Impact Stations (IS) were chosen on the basis of their proximity to the reclamation and thus the greatest potential for water quality impacts, the seven Sensitive Receiver Stations (SR) were chosen as they are close to the key sensitive receives and the five Control/ Far Field Stations (CS) were chosen to facilitate comparison of the water quality of the IS stations with less influence by the Project/ ambient water quality conditions.
Monitoring Locations. Locations of Monitoring Station are shown in Figure 1.5, the same locations as set up for the Baseline Monitoring. These are as follows : - NSR-3 Pine Court NSR-9 Magnolia Villa
Monitoring Locations. 3.1.1. The noise monitoring works for the Contract are covered by Contract Xx. XX/0000/00 Xxxx Xxxx- Xxxxxx-Xxxxx Xxxxxx XXXXX – Passenger Clearance Building. The ET of the Contract or another ET of the HZMB project is required to conduct noise monitoring at NMS2 and NMS3B as part of EM&A programme if these monitoring stations are no longer covered under Contract No. HY/2013/01. Table
Monitoring Locations. The water monitoring works for the Contract are covered by Contract Xx. XX/0000/00 Xxxx Xxxx- Xxxxxx-Xxxxx Xxxxxx XXXXX – Passenger Clearance Building. The ET of the Contract or another ET of the HZMB project is required to conduct water quality monitoring at twenty one stations (9 Impact Stations, 7 Sensitive Receiver Stations and 5 Control/Far Field Stations). Due to topographical conditions of XX0, XX00X and SR10B(N), the water quality monitoring (WQM) stations was proposed to be monitored at alternative WQM stations named as SR3(N), SR10A (N) and SR10B(N2). The proposal for alternation of water quality monitoring stations for HZMB HKBCF was justified by the ET Leader for Contract No. HY/2013/01 on 08 November 2017 and verified by the IEC on 13 November 2017; and submitted to EPD on 29 November 2017, and it was approved by EPD on 22 December 2017. Table 4.1 and Figure 2 shows the locations of water quality monitoring stations.
Monitoring Locations. The dolphin monitoring works for the Contract are covered by Contract Xx. XX/0000/00 Xxxx Xxxx- Xxxxxx-Xxxxx Xxxxxx XXXXX – Passenger Clearance Building. The ET of the Contract or another ET of the HZMB project is required to conduct dolphin monitoring at 24 transects as part of EM&A programme if these transects are no longer covered under Contract No. HY/2013/01. The dolphin monitoring should adopt line-transect vessel survey method. The survey follows pre-set and fixed transect lines in the two areas defined by AFCD as: Northeast Lantau survey area; and Northwest Lantau survey area. Figure 3 shows the co-ordinates for the transect lines and layout map.
AutoNDA by SimpleDocs
Monitoring Locations. 2.1.1. The air quality monitoring works for the Contract are covered by Contract Xx. XX/0000/00 Xxxx Xxxx- Xxxxxx-Xxxxx Xxxxxx XXXXX – Passenger Clearance Building and Xxxxxxxx Xx. XX/0000/00 Xxxx Xxxx-Xxxxxx-Xxxxx Xxxxxx Xxxx Xxxx Link Road – Section between Scenic Hill and HKBCF. The ET of the Contract or another ET of the HZMB project is required to conduct impact air quality monitoring at AMS6 and AMS7 as part of EM&A programme if these air quality monitoring stations are no longer covered under Contract No. HY/2013/01 and HY/2011/03. Table 2.1 and Figure 1 shows the locations of air monitoring stations.
Monitoring Locations. 3.1.5 Noise Monitoring Result
Monitoring Locations. Temperature and DO were measured from April 1st through October 1st, 2019 at 22 locations on the Shasta River and several tributaries and springs (Table 1). The study area spans approximately 40 river miles from Xxxxxxxx Reservoir to the mouth of the Shasta River at its confluence with the Klamath River (Figure 1). Reach 3 of the Shasta River includes upstream and downstream locations in the Project area. TABLE 1: REACH, SITE ID, RIVER MILE, EQUIPMENT DEPLOYED AND MEASURED METRICS DURING THE 2017 IRRIGATION SEASON (LISTED IN ORDER FROM UPSTREAM AT THE OUTLET OF XXXXXXXX RESERVOIR TO DOWNSTREAM AT THE MOUTH OF THE SHASTA RIVER). REACH 3 IN BOLD INCLUDES UPSTREAM AND DOWNSTREAM LOCATIONS IN THE PROJECT AREA. Reach Reach Description Site ID River Mile Equipment Measurement 6 Dwinnel Reservoir to Parks Creek 105SRHVRPOD 39.1 TidbiTs® Temperature 105SRHVSPL 38.1 TidbiTs® Temperature 105SRHVRALC 37.9 TidbiTs® Temperature 105SRU1DO 37.9 D-Opto DO/Temperature 105SRHVDSSPG 37.8 TidbiTs® Temperature 105SRU0IT 37.7 TidbiTs® Temperature 105SR7163DS 36.9 TidbiTs® Temperature 105SRHIGF 36.6 TidbiTs® Temperature Parks Creek Parks Creek (105SRP1DO) SR 33.9 (PC 0.04) D-Opto DO/Temperature Parks Creek (105PCFP) SR 33.9 (PC 7.3) TidbiTs® Temperature 5 Parks Creek to Big Springs Creek (105SRPCO) SR 33.1 (PCO 0.04) TidbiTs® Temperature 4 Big Springs Creek to Willow Creek 105SRN1DO 30.9 D-Opto DO/Temperature 105SRV1DO 26.0 D-Opto DO/Temperature 105SRV4AT 25.2 TidbiTs® Temperature 105SRV4BT 24.3 TidbiTs® Temperature 3 Willow Creek to Little Shasta River 105SRT1DO 23.0 D-Opto DO/Temperature 105SRM1DO 14.6 D-Opto DO/Temperature 105SR400T 12.3 TidbiTs® Temperature 105SRA1DO 11.8 D-Opto DO/Temperature 105SRA01T 10.2 TidbiTs® Temperature Yreka Creek Yreka Creek (105YCA01T) SR 7.3 (YC 0.6) TidbiTs® Temperature 1 Yreka Creek to Shasta River Mouth 105SRL1DO 0.6 D-Opto DO/Temperature * Sites in parentheses indicate monitoring location is on a tributary of the Shasta River
Time is Money Join Law Insider Premium to draft better contracts faster.