Overhead Sign Structures Sample Clauses

Overhead Sign Structures. The Consultant shall provide the design of sign structures for overhead cantilever and overhead truss sign assemblies and the associated foundation design. Applicable FDOT Overhead Sign Structure standards shall be evaluated and incorporated to the extent possible. Overhead Sign Structures are anticipated at the following locations: [Add locations here]
AutoNDA by SimpleDocs
Overhead Sign Structures. 4 Minimum sign clearance for overhead signs must be in accordance with TP Attachment 440-1 5 over the entire width of the pavement, including shoulders and gutters. The minimum sign 6 clearance for signs mounted on bridge structures must not be less than the bridge clearance 7 requirements specified in the Contract Documents. The bottom of signs mounted on bridge 8 structures must be 6 inches above the soffit of the structure. Developer shall locate overhead 9 sign structures required in areas other than the mainline and ramps in such as manner as to 10 provide a minimum of 2 feet of horizontal clearance from the face of vertical curb.

Related to Overhead Sign Structures

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Project Name Register ASIC

  • SCOPE OF ARCHITECT’S BASIC SERVICES 3.1 The Architect’s Basic Services consist of those described in this Article 3 and include usual and customary structural, mechanical, and electrical engineering services. Services not set forth in this Article 3 are Supplemental or Additional Services.

  • Utility Infrastructure During the term of this Agreement, Company will have the right to receive water, sanitary sewer, electric, storm drainage, telecommunication and data services at the Premises.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

Time is Money Join Law Insider Premium to draft better contracts faster.