Common use of Telephone Communication Clause in Contracts

Telephone Communication. Test to confirm Company has a direct line to the Facility control room at all times and that it is programmed correctly. Test to confirm that the Facility operators can sufficiently reach Company System Operator. Verification of dial-up telephone connection for 69 kV metering cabinet. Drawings, Documentation and Equipment Warranties. The items below are required components of the Acceptance Test and must be satisfied for successful completion of this Test. Electronic and three (3) hard copies of all Switchyard construction drawings, specifications, calibrations, and settings including as-built drawings. Equipment operating and maintenance manuals, spare parts lists, commissioning notes, as-built equipment settings, and other information related to the switchyard equipment. Contractor construction warranties and equipment warranties. Phase rotation testing to verify proper phase connections. Switching Station inspections – The Switching Station may be inspected to test and ensure that the equipment that Seller has installed is installed and operating correctly based upon agreed‑to design. Wiring may be field verified on a sample basis against the wiring diagrams to ensure that the installed equipment is wired properly. The grounding mat at the Switching Station may be tested to make sure there is adequate grounding of equipment. If agreed by the Parties in writing, some requirements may be postponed to the Control Systems Acceptance Test. ATTACHMENT O

Appears in 4 contracts

Samples: Energy Storage Power Purchase Agreement, Energy Storage Power Purchase Agreement, Energy Storage Power Purchase Agreement

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.