TRAFFIC CONTROL PATTERNS Sample Clauses

TRAFFIC CONTROL PATTERNS. Traffic control patterns shall be used when a work operation requires that all or part of any vehicle or work area protrudes onto any part of a travel lane or shoulder. For each situation, the installation of traffic control devices shall be based on the following: Speed and volume of traffic Duration of operation Exposure to hazards Traffic control patterns shall be uniform, neat and orderly so as to command respect from the motorist. In the case of a horizontal or vertical sight restriction in advance of the work area, the traffic control pattern shall be extended to provide adequate sight distance for approaching traffic. If a lane reduction taper is required to shift traffic, the entire length of the taper should be installed on a tangent section of roadway so that the entire taper area can be seen by the motorist. Any existing signs that are in conflict with the traffic control patterns shall be removed, covered, or turned so that they are not readable by oncoming traffic. When installing a traffic control pattern, a Buffer Area should be provided and this area shall be free of equipment, workers, materials and parked vehicles. Typical traffic control plans 19 through 25 may be used for moving operations such as line striping, pot hole patching, mowing, or sweeping when it is necessary for equipment to occupy a travel lane. Traffic control patterns will not be required when vehicles are on an emergency patrol type activity or when a short duration stop is made and the equipment can be contained within the shoulder. Flashing lights and appropriate trafficperson shall be used when required. Although each situation must be dealt with individually, conformity with the typical traffic control plans contained herein is required. In a situation not adequately covered by the typical traffic control plans, the Contractor must contact the Engineer for assistance prior to setting up a traffic control pattern. Rev. Date 5/18/2018 PLACEMENT OF SIGNS Signs must be placed in such a position to allow motorists the opportunity to reduce their speed prior to the work area. Signs shall be installed on the same side of the roadway as the work area. On multi-lane divided highways, advance warning signs shall be installed on both sides of the highway. On directional roadways (on-ramps, off-ramps, one-way roads), where the sight distance to signs is restricted, these signs should be installed on both sides of the roadway.
AutoNDA by SimpleDocs
TRAFFIC CONTROL PATTERNS. Traffic control patterns must be used when a work operation requires that all or part of any vehicle protrudes onto any part of a travel lane or shoulder. For each situation, the installation of traffic control devices must be based on the following:

Related to TRAFFIC CONTROL PATTERNS

  • Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Quality Control Program The Contractor shall describe the Quality Control Program in a written document which shall be reviewed by the Engineer prior to the start of any production, construction, or off-site fabrication. The written Quality Control Program shall be submitted to the Engineer for review at least ten (10) calendar days before the start of construction. The Quality Control Program shall be organized to address, as a minimum, the following items:

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Programming Phase 2.2.1.2. Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Transit Traffic The following rates will apply:

  • Erosion Prevention and Control Purchaser’s Operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. Purchaser shall adjust the kinds and intensity of erosion control work done to ground and weather condi- tions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding ex- pected seasonal periods of precipitation or runoff. If Purchaser fails to do seasonal erosion control work prior to any seasonal period of precipitation or runoff, Forest Service may temporarily assume responsibility for the work and any unencumbered deposits hereunder may be used by Forest Service to do the work. If needed for such work, Purchaser shall make additional deposits on request by Forest Service. Any money deposited or used for this purpose shall be treated as cooperative deposits under B4.218.

  • Contract Database Metadata Elements Title: Whitesville Central School District and Whitesville Central School Educational Support Staff Association (2003) Employer Name: Whitesville Central School District Union: Whitesville Central School Educational Support Staff Association Local: Effective Date: 07/01/2003 Expiration Date: 06/30/2006 PERB ID Number: 10699 Unit Size: Number of Pages: 23 For additional research information and assistance, please visit the Research page of the Catherwood website - xxxx://xxx.xxx.xxxxxxx.xxx/library/research/ For additional information on the ILR School - xxxx://xxx.xxx.xxxxxxx.xxx/ AGREEMENT BETWEEN WHITESVILLE CENTRAL SCHOOL EDUCATIONAL SUPPORT STAFF ASSOCIATION AND THE WHITESVILLE CENTRAL SCHOOL DISTRICT JULY 1, 2003 THROUGH JUNE 30, 2006 TABLE OF CONTENTS ARTICLE TITLE PAGE Preamble 1 I Recognition 1 II Collective Bargaining U n i t 1 III Dues/Agency Fee Ckoffand Payroll Deduction 1 IV Rights of Employees 2 V Rights of Employer ------------- 2 VI Personnel F i l e 2 VII Employee Definitions 3 VIII Permanent Status/Seniority 4 IX Wages 5 X Overtime 7 XI Vacation 7 XII Holidays 8 XIII Sick Leave and Leavesof A b s e n c e 8 XIV Conference, Workshops,Required Courses 10 XV Meal Allowance and M i l e a g e 11 XVI Retirement 11 XVII Insurance 12 XVIII Cafeteria P l a n 14 .XIX Uniform Allowance------------------ 14 XX Hours of W o r k 14 XXI Transfers/Promotions 15 XXII Job Descriptions 15 XXIII Grievance Procedure 15 XIV Copies of the Contract 18 XV Zipper C x x x x x 18 XXVI Legislative Clause 18 XXVII Duration 19 SIGNATURES 19 APPENDIX A Grievance F o r m 20 APPENDIX B Dues Authorization F o r m 21

  • Safety, breakdowns and accidents 17.5.1 The Concessionaire shall ensure safe conditions for the Users and passengers, and in the event of unsafe conditions, it shall follow the relevant operating procedures and undertake removal of obstruction and debris without delay. Such procedures shall conform to the provisions of this Agreement, Applicable Laws, Applicable Permits and Good Industry Practice.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

Time is Money Join Law Insider Premium to draft better contracts faster.