Costs of interconnection definition

Costs of interconnection means the reasonable costs of connection, switching, dispatching, metering, transmission, distribution, equipment necessary for system protection, safety provisions, and administrative costs incurred by an electric utility directly related to installing and maintaining the physical facilities necessary to permit purchases from a qualifying facility.
Costs of interconnection means the reasonable costs of connection, switching, dispatching, metering, transmission, distribution, equipment necessary for system protection, safety provisions, and administrative costs incurred by an electric utility directly related to
Costs of interconnection means the reasonable costs of connection, switching, dispatching, metering, transmission, distribution, equipment necessary for System protection, safety provisions, and

Examples of Costs of interconnection in a sentence

  • Costs of interconnection include the costs of furnishing and constructing required Interconnection Facilities, including Upgrades.

  • Costs of interconnection include the costs of furnishing and constructing required Upgrades, which will be determined pursuant to Rule H.

  • Costs of interconnection infrastructure Perhaps the most obvious direct cost of an international grid interconnection is the cost of the power line joining the grid systems.

  • Table 12 – Costs of interconnection linksDoes the incumbent bear the cost of the interconnection links for traffic directed toOAOs networks?# ofCountries**Yes7Split between incumbent and OAO on a traffic basis7Split between incumbent and OAO on another basis (infrastructure, ½ costs, distance)4No5Missing5*Total28* Czech Republic, Luxembourg, Poland, Slovakia, United Kingdom.** See Appendix 2, Table A2.7 for details.

  • Costs of interconnection include the costs of furnishing and constructing required Interconnection Facilities, including Upgrades.I.P.U.C. No. 29, Tariff No. 101OriginalFirst Revised Sheet No. 72-64 SCHEDULE 72 INTERCONNECTIONS TO NON-UTILITY GENERATION(Continued) PAYMENT FOR INTERCONNECTION FACILITIES (Continued) Each request for interconnection will go through the Generator Interconnection Process.

  • Item C: Costs of interconnection and technological plants Technology Fee for Community Health House € 272,592 of which: 192,000.00 €: technological component equal to 15% (Section C.4 of the document entitled "Methods and procedures for the activation of investment programs in health care through the program agreements, referred to in Article 5 bis of Legislative Decree.

  • Costs of interconnection charges paid to the other licensed operators for outgoing calls to these operators’ networks are recoginsed on an accrual basis at the rates stipulate in the agreements.Revenue from sales of telephone sets and starter kits Sales of goods are recognized when the significant risks and rewards of ownership of the goods have passed to the buyer.

  • Cost itemUnit Cost (Euro)NrTotalItem A – Operational support--261,504 €Item B - Structural costs1,280,0001,2881,648,640,000 €Item C - Costs of interconnection and technologicalplants272,5921,288351,098,496 €Total 2,000,000,000 € Methodology Community Health Houses to be activated: 1,288 (60,244,639 Italian population ISTAT 01/01/2020 /46.774 inhab.

  • Costs of interconnection charges paid to the other licensed operators for outgoing calls to these operators’ networks are recognised on an accrual basis at the rates stipulated in the agreements.

Related to Costs of interconnection

  • Interconnection is As Defined in the Act.

  • Interconnection Facilities means the Transmission Owner Interconnection Facilities and the Customer Interconnection Facilities.

  • Point of Interconnection means the point or points where the Customer Interconnection Facilities interconnect with the Transmission Owner Interconnection Facilities or the Transmission System.

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Train Loading Infrastructure means conveyors, stockpile areas, blending and screening facilities, stackers, re‑claimers and other infrastructure reasonably required for the loading of iron ore, freight goods or other products onto the relevant Railway for transport (directly or indirectly) to a loading port; and

  • Train Unloading Infrastructure means train unloading infrastructure reasonably required for the unloading of iron ore from the Railway to be processed, or blended with other iron ore, at processing or blending facilities in the vicinity of that train unloading infrastructure and with the resulting iron ore products then loaded on to the Railway for transport (directly or indirectly) to a loading port. Company to obtain prior Ministerial in-principle approval

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Green infrastructure means a stormwater management measure that manages stormwater close to its source by: