Examples of Expected Production in a sentence
To the extent that the Solar Array Design and / or the SEF Expected Production are adjusted after the Effective Date of this Agreement, such adjustments shall be approved by the Client and if they are different to the details specified in Schedule #2, the Contract Sum will be adjusted to ensure the Client’s expected economic benefit as at the Effective Date of this Agreement remains unaffected by the changes to the Solar Array Design and / or the SEF Expected Production.
In such event, the Parties agree that Solar System Size, Estimated Year 1 Production and Expected Production set forth in Schedule 2 and the Purchase Option Fee set forth for each year in Schedule 4 shall automatically be reduced by a percentage equal to the percentage reduction in the size of the System.
Submit samples of design engineering systems (or samples of previous projects) either in AutoCAD, or other equivalent engineering programs, to determine engineering capability.2.5 Expected Production Capacity:a.
To the extent that the Solar PV System Design and/or the Solar PV System Expected Production are adjusted after the Effective Date of this Agreement, such adjustments shall be approved by Client and, if they are different from the details specified in Schedule #2, the Contract Sum will be adjusted to ensure Client’s Expected Economic Benefit as at the Effective Date of this Agreement remains unaffected by the changes to the Solar PV System Design and/or the Solar PV System Expected Production.
In the event that UNIVERSITY’s activities result in the System being overshadowed in manner that causes the System to produce less than 95 percent of the Expected Production Output on a kWh basis over any twelve (12) month period, UNIVERSITY agrees to pay “in- lieu” fees up to the Expected Performance Output as described in Section 11.1.1 above for the duration of the period for which the shadowing occurs.
Table 4: Expected Production by Permanent and Contingent Resources for a 5-Period Problem aExpected Production with Permanent ResourcesbExpected Production with Contingent Resources As this example points out, it is very difficult to characterize the optimal structure of the capacity levels in problems with setup costs as there are many alternative potential ways of coping with the demand uncertainty with the help of flexibility inherent in the system.
Only two individual indicators related to expectations (Expected Production and Expected Sales) and reflecting confidence were proved as short leading indicators.
Expected Production Levels These levels can be increased by more than one alternative; all the alternatives will be compared and assessed by using the Cost-Benefit Analysis.
Liquid Displacement Cause (NC1) Expected Production (lbs/year) / density (lbs/ft3) x 492F / 520F (correction to standard conditions) = scf / year ii.
Possible total subscription 20 Vinelots Size of each Leased Area 2 hectares Minimum allocation 1 Vinelot Number of Vines established per hectare 1,666 vines per hectare Expected Production 12.5 tonnes per hectare The term of the Project 15 years if land not purchased, otherwise indefinite.