Examples of Materials handling in a sentence
Materials handling shall be conducted in accordance with the Contractor’s Environmental / Waste Management Program (see Section 2.04).
Appropriate Hand Gloves shall be used for Materials handling, Welding, Grinding, Gas cutting, Chemical Handling & Electrical work.
Garage and service equipment.2. General tools, including power operated equipment.3. Laboratory equipment.4. Materials handling equipment.5. Office furniture and equipment.6. Power generation equipment.7. Shop equipment.8. Tools, other than small hand tools.9. Other equipment.
Materials handling and stor- age shall comply with applicable mate- rial-handling and material-storage re- quirements in this part, including those in subpart N of this part.(2) Materials storage near energized lines or equipment.
In addition to the project layout, the following detail must be depicted:• Materials handling and storage; • Waste management areas (collection, storage, transfer, etc.); • Sensitive areas; • Incident and emergency equipment locations; and Location of responsible parties.
DB Contractor’s personnel handling Hazardous Materials shall be appropriately trained in Hazardous Materials handling and disposal.
Materials handling equipment shall be purchased for replacement purposes in accordance with the standards in FPMR 41 CFR 101-25.405 and DOE-PMR 41 CFR 109-25.4. The Heads of Contracting Activities are authorized to replace an item earlier than the date specified in such standards under unusual circumstances.
General: Materials handling and batching shall conform to applicable provisions of ASTM C94.
Contractor shall meet or exceed National Pollutant Discharge Elimination System (NPDES) permit requirements for Hazardous Materials handling, cleanup and reporting.
Materials handling equipment used to transport test samples is taxable.