TOOLS & TACKLES AND SPARES नमुना कलम

TOOLS & TACKLES AND SPARES. After completion of installation & commissioning of the power plant, necessary tools & tackles are to be provided free of cost by the EoI holder for maintenance purpose. List of tools and tackles to be supplied by the EoI holder for approval of specifications and make from MEDA/ owner. • A list of requisite spares in case of PCU/inverter comprising of a set of control logic cards, IGBT driver cards etc. Junction Boxes. Fuses, MOVs / arrestors, MCCBs etc along with spare set of PV modules be indicated, which shall be supplied along with the equipment. A minimum set of spares shall be maintained in the plant itself for the entire period of warranty and Operation & Maintenance which upon its use shall be replenished. _ DANGER BOARDS AND SIGNAGES :- • Danger boards should be provided as and where necessary as per IE Act. /IE rules as amended up to date. Three signage shall be provided one each at battery –cum- control room, solar array area and main entry from administrative block. Text of the signage may be finalized in consultation with MEDA/ owner. _ FIRE EXTINGUISHERS :- • The firefighting system for the proposed power plant for fire protection shall be consisting of: a. Portable fire extinguishers in the control room for fire caused by electrical short circuits. b. Sand buckets in the control room. c. The installation of Fire Extinguishers should confirm to TAC regulation sand BIS standards. The fire extinguishers shall be provided in the control room housing PCUs as well as on the Roof or site where the PV array shave been installed. _ DRAWINGS &MANUALS :- • Two sets of Engineering, electrical drawings and Installation and O&M manuals are to be supplied. EoI holders shall provide complete technical data sheets for each equipment giving details of the specifications along with make/makes in their EoI along with basic design of the power plant and power evacuation, synchronization along with protection equipment. • Approved ISI and reputed makes for equipment be used. • For complete electro-mechanical works, EoI holders shall supply complete design, details and drawings for approval to owners before progressing with the installation work. _ PLANNING AND DESIGNING: • The EoI holder should carry out Shadow Analysis at the site and accordingly design strings & arrays layout considering optimal usage of space, material and labour. The EoI holder should submit the array layout drawings along with Shadow Analysis Report to owner for approval. - SAFTY MEASURES Th...