Cost of Repairs नमूना धाराहरू

Cost of Repairs. 60.1 Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date and the end of the Defects Correction periods shall be remedied by the Contractor at the Contractor‘s cost if the loss or damage arises from the Contractor‘s acts or omissions. F.