Adjustment to Installed Capacity Estimate Permitted reduction
Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.
Fuel Surcharge NO FUEL SURCHARGES allowed during the term of this contract or any of its extensions. The Successful Contract will not xxxx Xxxxxxx County for any fuel surcharges throughout the term of this contract and its extensions.
Access Charges 88.1 CenturyLink retains all revenue due from other carriers for access to CenturyLink’s facilities, including both switched and special access charges. CenturyLink retains all Switched Access Service revenues when providing Switched Access Services for CLEC’s retail End Users served via resale. When CLEC resells special access to its End Users, CenturyLink is not entitled to any special access revenues from CLEC’s End Users.
CAISO Monthly Billed Fuel Cost [for Geysers Main only] The CAISO Monthly Billed Fuel Cost is given by Equation C2-1. CAISO Monthly Billed Fuel Cost Equation C2-1 = Billable MWh ◆ Steam Price ($/MWh) Where: • Steam Price is $16.34/MWh. • For purposes of Equation C2-1, Billable MWh is all Billable MWh Delivered after cumulative Hourly Metered Total Net Generation during the Contract Year from all Units exceeds the Minimum Annual Generation given by Equation C2-2. Equation C2-2 Minimum Annual Generation = (Annual Average Field Capacity ◆ 8760 hours ◆ 0.4) - (A+B+C) Where: • Annual Average Field Capacity is the arithmetic average of the two Field Capacities in MW for each Contract Year, determined as described below. Field Capacity shall be determined for each six-month period from July 1 through December 31 of the preceding calendar year and January 1 through June 30 of the Contract Year. Field Capacity shall be the average of the five highest amounts of net generation (in MWh) simultaneously achieved by all Units during eight-hour periods within the six-month period. The capacity simultaneously achieved by all Units during each eight-hour period shall be the sum of Hourly Metered Total Net Generation for all Units during such eight-hour period, divided by eight hours. Such eight-hour periods shall not overlap or be counted more than once but may be consecutive. Within 30 days after the end of each six-month period, Owner shall provide CAISO and the Responsible Utility with its determination of Field Capacity, including all information necessary to validate that determination. • A is the amount of Energy that cannot be produced (as defined below) due to the curtailment of a Unit during a test of the Facility, a Unit or the steam field agreed to by CAISO and Owner. • B is the amount of Energy that cannot be produced (as defined below) due to the retirement of a Unit or due to a Unit’s Availability remaining at zero after a period of ten Months during which the Unit’s Availability has been zero. • C is the amount of Energy that cannot be produced (as defined below) because a Force Majeure Event reduces a Unit’s Availability to zero for at least thirty (30) days or because a Force Majeure Event reduces a Unit’s Availability for at least one hundred eighty (180) days to a level below the Unit Availability Limit immediately prior to the Force Majeure Event. • The amount of Energy that cannot be produced is the sum, for each Settlement Period during which the condition applicable to A, B or C above exists, of the difference between the Unit Availability Limit immediately prior to the condition and the Unit Availability Limit during the condition.
Monthly Charges Purchaser shall pay Seller monthly for the electric energy generated by the System and delivered to the Delivery Point at the $/kWh rate shown in Exhibit 1 (the “Contract Price”). The monthly payment for such energy will be equal to the applicable $/kWh rate multiplied by the number of kWh of energy generated during the applicable month, as measured by the System meter.
Escalation Cap In a single year of the Contract, the maximum price increase for each individual item on contract shall not exceed the lesser of two (2%) percent of the Contractor’s current NYS pricing as found in the OGS Centralized Contract or the percent increase in the latest available National Consumer Price Index - All Urban Consumers (CPI-U), Not Seasonally Adjusted, U.S. City Average, All Items (Series Id: CUUR0000SA0, CUUS0000SA0); as published by the U.S. Department of Labor, Bureau of Xxxxx Xxxxxxxxxx, Xxxxxxxxxx, X.X. 00000. CPI-U data may be obtained at xxx.xxx.xxx.
Electricity Charges The licensee herein shall pay the electricity bills directly for energy consumed on the licensed premises and should submit original receipts to Licensor indicating that the electricity bills are paid.
Utility Charges Tenant shall pay or cause to be paid all charges for electricity, power, gas, oil, water and other utilities used in connection with the Leased Property.
CAISO ACA Charge The CAISO ACA Charge is the product of the Unit’s Billable MWh for the Billing Month and the applicable annual charge for short-term sales under 18 CFR Section 382.201 of the FERC Regulations. Schedule C Variable Cost Payment for All Conditions Part 5 for Biomass Generation Units For each month and each Unit, the Variable Cost Payment for Billable MWH from the Unit pursuant to Nonmarket Transaction during that Month shall be the amount calculated in accordance with the following formula: Variable Cost Payment = A.