Anodized Sheet Aluminum (7 Sample Clauses

Anodized Sheet Aluminum (7. 2.2.1) Type 1 Controller (3.3 – Type A1) • Memory key jack • Memory key stick to plug into the jack to store all programmable data Detector input test buttons in cabinet door: • 4 Pre-empt • 8 Pedestrian Phase • 16 Vehicle Channel Additional Surge protection The following multiple line wiring shall have surge suppression available: • 16 Vehicle detection • 4 Pre-emption • 1 Coordination interconnect cable • 1 Modem • 1 Data bus (SDLC) • Each line within each multiple line wiring shall have its own unique surge protection. • Each surge suppressor and its connections shall be shown on a Surge Suppression Wiring Diagram provided with the cabinet. Surge suppressors shall meet the following specifications: • Circuit Type: 3 stage • Lines Protected: 4 + shield • Protection Status: LED indicator for each line • Surge Capacity: 10 kA 8 x 20 µs impulse per line • Resettable Fuse: Positive Temperature Coefficient (PTC) • Response Time: <1 ns • Working Voltage 12V • Voltage Clamp: 20V @ 2kA, 8/20us • Wiring Interface: 5 position cage clamp terminal strip • Mounting 35mm DIN rail • Listing UL497B • Testing Param.: ANSI/IEE C62.45 Document Tray • One (1) slide-out document tray shall be mounted below the bottom shelf. • Sufficient size to contain cabinet wiring diagrams and two manuals • Slides out on nylon rollers or ball bearings • Hinged cover to protect documents • The closed cover shall be able to support a laptop computer. • All cables shall be tied away to allow the tray to be opened and closed smoothly without any obstructions. Meter Socket • Standard 4-jawed residential meter socket with no knockout on top • Rated for 125 Amps, 100 Amps continuous, 600 VAC, CU/AL rated • Attached and electrically grounded to the cabinet • Three power service unfused terminal connections (AC-, AC+ and ground) having the ability to connect No. 6 AWG conductor • Manual, single handle bypass switch to remove meter without disrupting service • A close nipple with lock nuts & bushings shall be used to prevent chaffing the wires entering the hole in the cabinet from the meter socket. • Complies with Section 815.21, Equipment. Each cabinet shall have the following: • There shall be a fourth switch added to Section 815.41.A.3.b that switches the controller from Free operation to Coordinated operation and vice versa. • There shall be two switches for the police door: 1) Main power switch and 2) A switch for switching the controller from automatic to flashing operation and vice versa, wi...
AutoNDA by SimpleDocs

Related to Anodized Sheet Aluminum (7

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Mail Order Catalog Warnings In the event that, the Settling Entity prints new catalogs and sells units of the Products via mail order through such catalogs to California consumers or through its customers, the Settling Entity shall provide a warning for each unit of such Product both on the label in accordance with subsection 2.4 above, and in the catalog in a manner that clearly associates the warning with the specific Product being purchased. Any warning provided in a mail order catalog shall be in the same type size or larger than other consumer information conveyed for such Product within the catalog and shall be located on the same display page of the item. The catalog warning may use the Short-Form Warning content described in subsection 2.3(b) if the language provided on the Product label also uses the Short-Form Warning.

  • Copper Subloops Sprint will make available access to copper subloops on an unbundled basis. A copper subloop is a portion of a Copper Loop, or Hybrid Loop, and is comprised entirely of copper wire or copper cable that acts as a transmission facility between any accessible terminal in Sprint’s outside plant, including inside wire owned or controlled by Sprint, and the end-user customer premises. A copper subloop can also include intermediate devices, such as repeaters, used to establish the transmission path. Copper subloops can be used by CLEC to provide voice-grade services as well as digital subscriber line services. Access to copper subloops is subject to the collocation provisions of this Agreement. Copper subloop consists of the distribution portion of the copper loop. Sprint is not obligated to offer feeder loop plant as a stand-alone UNE.

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Bargaining Unit Layoff List/Same Classification If a Bargaining Unit Layoff List/Same Classification is to be used, selection shall be made from among qualified employees whose names appear on the list; or

  • Rubric The rubrics are a scoring tool used for the Educator’s self-assessment, the formative assessment, the formative evaluation and the summative evaluation. The districts may use either the rubrics provided by ESE or comparably rigorous and comprehensive rubrics developed or adopted by the district and reviewed by ESE.

  • General specifications 6.1.1. A vehicle and its electrical/electronic system(s) or ESA(s) shall be so designed, constructed and fitted as to enable the vehicle, in normal conditions of use, to comply with the requirements of this Regulation.

Time is Money Join Law Insider Premium to draft better contracts faster.