Commissioning Activities Sample Clauses

Commissioning Activities. (a) Project Co shall perform all Project Co Commissioning, and shall facilitate the performance of all Hospital Commissioning, pursuant to the Final Commissioning Program.
AutoNDA by SimpleDocs
Commissioning Activities. Procurement, installation and construction of CMR-Procured Equipment
Commissioning Activities. Consultant shall lead a commissioning team to execute commissioning plan. Consultant shall provide operations and/or engineering specialist(s) to work with City operations staff on site throughout the commissioning phase. Commissioning support shall be directed at complex areas of the Project elements and major trains of process equipment, where input from the Consultant will be most beneficial. Consultant shall maintain commissioning verification log. The Task Maximum Payable for this sub- task assumes that the commissioning period will last no longer than eight months, that fifteen meetings will occur during this time, and that two Consultant team members will attend each meeting.
Commissioning Activities. Responsibilities a. Vendor will provide Commissioning teams once (5) or more BTSs in a PCS System are ready for Commissioning or as negotiated on a local basis. b. Vendor owned tools and test equipment will be used by Vendor to Commission the BTS. c. Upon Vendor's receipt and acknowledgment of the BTS Construction Site Ready For Acceptance Check List (Attachment 1 to Exhibit B4), Vendor will execute the Commissioning tests [Minicell Installation 400-000-000], in accordance with (i), the tests as set forth in [Handbook Section 222] Attachment 2 to this Exhibit B4 (BTS Commissioning Form and (ii), Section E Exhibit B4 ("Project Intervals"). Owner shall be notified reasonably in advance of the commencement of Commissioning. d. Vendor will connect all batteries and circuit packs delivered to the BTS System Element Location. e. Vendor will provide, place and terminate all RF cables from (i) the BTS to the ACCA, (ii) ACCA to the antenna cables(s), and (iii) from the BTS to the GPS, including all clamps, connectors, etc. f. For growth cells in existing markets (PCS Systems), Owner will perform Switch database administration and BTS data down loading. Owner will be responsible for all changes to database engineering and Switch translations necessary to integrate a newly Commissioned BTS into an existing "on air"' network.
Commissioning Activities. 107 26.2 Milestone Acceptance Certificate, Substantial Completion Certificate and Revenue Service Availability Certificate ................................................................... 107 26.3 Countdown Notice for Milestones and Substantial Completion................................. 109 26.4 Minor Deficiencies...................................................................................................... 109 26.5 Rectification of Minor Deficiencies............................................................................ 110 26.6 Failure to Rectify Minor Deficiencies ........................................................................ 110 26.7 Revenue Service Availability ..................................................................................... 111 26.8 Final Completion Certificate....................................................................................... 113 26.9 Effect of Certificates/Use ............................................................................................ 114 26.10 [Intentionally deleted] ................................................................................................. 114 26.11 Post-Completion Survey ............................................................................................. 114 Amended and Restated Project Agreement Ottawa Light Rail Transit Project REDACTED Execution Version CONFIDENTIAL AND PROPRIETARY Page v CAN: 26350049.2 BD-#30398459-v2
Commissioning Activities. (a) Project Co shall perform all Project Co Commissioning, and shall support and facilitate the performance of all required commissioning by the City, as set forth in this Section 26 and in Schedule 14 – Commissioning in respect of Milestone Acceptance, Substantial Completion, Revenue Service Availability and Final Completion, as applicable. (b) Project Co shall perform or cause to be performed all matters to ensure that Revenue Service Availability is achieved by the Required Revenue Service Availability Date.
Commissioning Activities. 4 4.2 Documentation............................................. 5
AutoNDA by SimpleDocs
Commissioning Activities. Consultant shall lead a commissioning team to execute commissioning plan. Consultant shall provide operations and/or engineering specialist(s) to work with City O&M staff on site throughout the commissioning phase. Commissioning support shall be directed at complex areas of the Project elements and major trains of process Amended Attachment “A” Form Form Approved by the Office of the City Attorney August 2021 equipment, where input from the Consultant will be most beneficial. Consultant shall maintain commissioning verification log. The Task Maximum Payable for this sub-task assumes that the commissioning period will last the duration of this service order, thirty (30) weekly commissioning meetings will occur, and up to two (2) Consultant team members will attend each meeting.
Commissioning Activities. (a) Project Co shall perform all Commissioning, and shall support and facilitate, as necessary, the performance of all City Commissioning, if any, pursuant to the Testing and Commissioning Plan.
Commissioning Activities. Contractor's commissioning activities and Performance Tests shall include the following: Commissioning procedures, i.e. identification of system turnover, turnover packages, system clearance, etc Equipment initial operation and balancing Equipment alignment / adjustment Equipment lubrication Pipe flushing (or high pressure water cleaning) or steam or air blows Chemical cleaning Disposal of flushing and cleaning chemicals First fill and top off of lube oils and chemicals Systems initial operation and adjustments Electrical insulation verification and continuity checks Verification and calibration of Contractor-supplied circuit breakers Motor rotation verification Checkout and calibration of Contractor-supplied protective relays Phase rotation check of distribution equipment Instrument calibration and set points Instrument loop checks Checkout of motor and pneumatic operated valves and control valves All relief valve calibrations (including boiler relief valves) and adjustments required by ASME Code Installation of Contractor-supplied SCR catalyst following initial combustion turbine firing