{"component": "clause", "props": {"groups": [{"snippet": "All required instrumentation and control equipment will be used during such tests and the contractor will use all such measuring equipment and devices duly calibrated as far as practicable. However, the Contractor, for the requirement of these tests, shall take immeasurable parameters into account in a reasonable manner. The tests will be conducted at the specified load points and as near the specified cycle condition as practicable. The contractor will apply proper corrections in calculation, to take into account conditions, which do not correspond to the specified conditions.\n2.7.1. Any special equipment, tools and tackles required for the successful completion of the Commissioning tests shall be provided by the contractor, free of cost.", "samples": [{"hash": "lL5VQil4SMD", "uri": "/contracts/lL5VQil4SMD#commissioning-tests", "label": "Turnkey Contract", "score": 29.6993541718, "published": true}, {"hash": "gQ1lgYHU0Qr", "uri": "/contracts/gQ1lgYHU0Qr#commissioning-tests", "label": "Full Turnkey Contract", "score": 28.9371051788, "published": true}, {"hash": "kjckQkO4W3s", "uri": "/contracts/kjckQkO4W3s#commissioning-tests", "label": "Turnkey Contract", "score": 28.1089439392, "published": true}], "size": 29, "snippet_links": [{"key": "control-equipment", "type": "clause", "offset": [33, 50]}, {"key": "the-contractor-will", "type": "clause", "offset": [86, 105]}, {"key": "equipment-and-devices", "type": "clause", "offset": [129, 150]}, {"key": "the-requirement", "type": "clause", "offset": [219, 234]}, {"key": "reasonable-manner", "type": "definition", "offset": [304, 321]}, {"key": "specified-load", "type": "definition", "offset": [358, 372]}, {"key": "account-conditions", "type": "definition", "offset": [512, 530]}, {"key": "specified-conditions", "type": "clause", "offset": [563, 583]}, {"key": "special-equipment", "type": "clause", "offset": [596, 613]}, {"key": "the-commissioning", "type": "definition", "offset": [675, 692]}, {"key": "provided-by-the-contractor", "type": "clause", "offset": [708, 734]}], "hash": "f72de17f6beee3cec048136606f38846", "id": 1}, {"snippet": "Contractor shall perform Commissioning Tests in accordance with Attachment S.", "samples": [{"hash": "5bbcng2oT6s", "uri": "/contracts/5bbcng2oT6s#commissioning-tests", "label": "Lump Sum Turnkey Agreement", "score": 31.3408622742, "published": true}, {"hash": "9II58top2kV", "uri": "/contracts/9II58top2kV#commissioning-tests", "label": "Lump Sum Turnkey Agreement (Sabine Pass Liquefaction, LLC)", "score": 29.8542098999, "published": true}, {"hash": "37Tt7UxYYVH", "uri": "/contracts/37Tt7UxYYVH#commissioning-tests", "label": "Fixed Price Separated Turnkey Agreement (Cheniere Corpus Christi Holdings, LLC)", "score": 29.3175907135, "published": true}], "size": 16, "snippet_links": [{"key": "contractor-shall", "type": "clause", "offset": [0, 16]}, {"key": "in-accordance-with", "type": "definition", "offset": [45, 63]}], "hash": "7ff2c4640023878f4963d8b1da68b199", "id": 2}, {"snippet": "Interconnection Customer shall perform: (A) measurements of harmonic voltage and current at commissioning of the Small Generating Facility and (B) tests to evaluate reactive capability and voltage regulation performance both statically and dynamically. Connecting Transmission Owner's representatives shall be permitted to witness such tests and measurements. Interconnection Customer shall submit a written report to the Connecting Transmission Owner documenting the measurement, test results and the corresponding operating conditions, thirty (30) days prior to the In-Service Date of the Small Generating Facility (except with respect to the testing referred to in clause (A) which report shall be provided as soon as practicable after the In-Service Date of the Small Generating Facility). The foregoing provisions shall be in addition to any and all other testing requirements pursuant to this Agreement.", "samples": [{"hash": "gBMCfTJUbBs", "uri": "/contracts/gBMCfTJUbBs#commissioning-tests", "label": "Standard Small Generator Interconnection Agreement", "score": 34.8440170288, "published": true}, {"hash": "5EwSNPA8xyf", "uri": "/contracts/5EwSNPA8xyf#commissioning-tests", "label": "Standard Small Generator Interconnection Agreement", "score": 32.8675880432, "published": true}, {"hash": "jVxrfD46LAh", "uri": "/contracts/jVxrfD46LAh#commissioning-tests", "label": "Service Agreement", "score": 29.9265556335, "published": true}], "size": 7, "snippet_links": [{"key": "customer-shall", "type": "clause", "offset": [16, 30]}, {"key": "small-generating-facility", "type": "definition", "offset": [113, 138]}, {"key": "voltage-regulation", "type": "clause", "offset": [189, 207]}, {"key": "report-to", "type": "clause", "offset": [408, 417]}, {"key": "the-connecting-transmission-owner", "type": "definition", "offset": [418, 451]}, {"key": "test-results", "type": "definition", "offset": [481, 493]}, {"key": "operating-conditions", "type": "clause", "offset": [516, 536]}, {"key": "prior-to-the-in", "type": "clause", "offset": [555, 570]}, {"key": "date-of", "type": "clause", "offset": [579, 586]}, {"key": "with-respect-to", "type": "clause", "offset": [625, 640]}, {"key": "the-testing", "type": "definition", "offset": [641, 652]}, {"key": "in-clause", "type": "clause", "offset": [665, 674]}, {"key": "as-soon-as-practicable", "type": "definition", "offset": [710, 732]}, {"key": "the-foregoing", "type": "definition", "offset": [794, 807]}, {"key": "in-addition-to", "type": "clause", "offset": [828, 842]}, {"key": "testing-requirements", "type": "clause", "offset": [861, 881]}, {"key": "pursuant-to-this-agreement", "type": "clause", "offset": [882, 908]}], "hash": "7749af48e9b62b43cf894fd8262f96bd", "id": 3}, {"snippet": "4.2.1 After a Unit has been successfully Synchronized with the Grid System, the Company shall further give at least seven (7) days notice by fax followed by registered mail to the HPSEBL of the exact date(s) on which Commissioning Test(s) will commence. The HPSEBL shall designate its authorized representative to observe these test(s).\n4.2.2 The Company shall conduct Commissioning Tests within fifteen (15) days from the Synchronization Date, in the presence of an Independent Engineer appointed by both the Parties and the authorized representative of HPSEBL. The Independent Engineer and the authorized representative of the HPSEBL shall submit a certificate of the Tested Capacity and necessary performance tests of the plant to the Chief Engineer (Commercial), HPSEBL, Shimla or to any other authority as may be designated by the HPSEBL. After successful completion of the Commissioning Tests, trial operation of the Unit(s) shall be carried out by the Company for a period of 15 days to establish the reliability and stability of the Generating Unit(s). The Company shall also furnish a copy of the Tests results and the report regarding trial operation to the HPSEBL.", "samples": [{"hash": "h8VTFzLF5C8", "uri": "/contracts/h8VTFzLF5C8#commissioning-tests", "label": "Power Purchase Agreement", "score": 28.722114563, "published": true}, {"hash": "eudt2xNKrv1", "uri": "/contracts/eudt2xNKrv1#commissioning-tests", "label": "Power Purchase Agreement", "score": 24.1225185394, "published": true}, {"hash": "PeUygYuGZJ", "uri": "/contracts/PeUygYuGZJ#commissioning-tests", "label": "Power Purchase Agreement", "score": 24.1225185394, "published": true}], "size": 5, "snippet_links": [{"key": "a-unit", "type": "definition", "offset": [12, 18]}, {"key": "grid-system", "type": "definition", "offset": [63, 74]}, {"key": "the-company-shall", "type": "clause", "offset": [76, 93]}, {"key": "notice-by", "type": "clause", "offset": [131, 140]}, {"key": "mail-to", "type": "definition", "offset": [168, 175]}, {"key": "in-the-presence-of", "type": "definition", "offset": [445, 463]}, {"key": "an-independent", "type": "clause", "offset": [464, 478]}, {"key": "by-both-the-parties", "type": "clause", "offset": [498, 517]}, {"key": "the-authorized-representative", "type": "definition", "offset": [522, 551]}, {"key": "the-independent-engineer", "type": "clause", "offset": [563, 587]}, {"key": "certificate-of", "type": "clause", "offset": [651, 665]}, {"key": "tested-capacity", "type": "clause", "offset": [670, 685]}, {"key": "performance-tests", "type": "definition", "offset": [700, 717]}, {"key": "the-plant", "type": "clause", "offset": [721, 730]}, {"key": "chief-engineer", "type": "clause", "offset": [738, 752]}, {"key": "other-authority", "type": "clause", "offset": [792, 807]}, {"key": "the-commissioning", "type": "definition", "offset": [875, 892]}, {"key": "operation-of-the", "type": "clause", "offset": [906, 922]}, {"key": "by-the-company-for", "type": "clause", "offset": [952, 970]}, {"key": "period-of", "type": "clause", "offset": [973, 982]}, {"key": "to-establish", "type": "definition", "offset": [991, 1003]}, {"key": "a-copy-of-the", "type": "clause", "offset": [1092, 1105]}, {"key": "the-report", "type": "clause", "offset": [1124, 1134]}], "hash": "d7c912f99da515c2c7fe1109975be404", "id": 6}, {"snippet": "Commissioning tests of the Customer\u2019s installed Generation System shall be performed pursuant to applicable codes and standards, including IEEE 1547.\n1. The Department must be given at least five (5) business day\u2019s written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.", "samples": [{"hash": "cGx5mfZsecD", "uri": "/contracts/cGx5mfZsecD#commissioning-tests", "label": "Customer Owned Generation Interconnection Agreement", "score": 35.0822651403, "published": true}, {"hash": "4DhHbQ2VKGk", "uri": "/contracts/4DhHbQ2VKGk#commissioning-tests", "label": "Customer Owned Generation Interconnection Agreement", "score": 31.9111480713, "published": true}, {"hash": "lI2gcuZA6Ts", "uri": "/contracts/lI2gcuZA6Ts#commissioning-tests", "label": "Customer Owned Generation Interconnection Agreement", "score": 23.1601638794, "published": true}], "size": 7, "snippet_links": [{"key": "of-the-customer", "type": "clause", "offset": [20, 35]}, {"key": "generation-system", "type": "definition", "offset": [48, 65]}, {"key": "applicable-codes-and-standards", "type": "definition", "offset": [97, 127]}, {"key": "ieee-1547", "type": "definition", "offset": [139, 148]}, {"key": "the-department", "type": "clause", "offset": [153, 167]}, {"key": "business-day", "type": "clause", "offset": [200, 212]}, {"key": "written-notice", "type": "clause", "offset": [215, 229]}, {"key": "by-the-parties", "type": "clause", "offset": [266, 280]}, {"key": "the-commissioning", "type": "definition", "offset": [325, 342]}], "hash": "1b375c1615545d233f689bedfbe40b23", "id": 4}, {"snippet": "9.1.1. At least 30 (thirty) days prior to the likely date of commissioning of the Facility, Seller shall notify the Independent Engineer and CEB of its intent to subject the Facility to Commissioning Tests. The date and time of each of the tests shall be determined by the Independent Engineer in consultation with Seller and notified to CEB who may designate its representative(s) to witness the Commissioning Tests. Seller shall provide such assistance as the Independent Engineer may reasonably require for witnessing the Tests. In the event that Seller and the Independent Engineer fail to mutually agree on the dates for conducting the tests, Seller shall fix the dates by not less than 10 (ten) days\u2019 written notice to the Independent Engineer and CEB.\n9.1.2. All Commissioning Tests shall be conducted in accordance with the testing procedures specified in Schedule H. The Independent Engineer shall observe, monitor and review the results of the tests to determine compliance of the Facility with this Agreement, and if it is reasonably anticipated or determined by the Independent Engineer during the course of any test that the performance of the Facility or any part thereof does not meet the provisions of this Agreement, it shall have the right to suspend or delay such test and require Seller to remedy and rectify the defects or deficiencies. Upon completion of each test, the Independent Engineer shall provide to Seller and CEB copies of all test data including detailed test results. For the avoidance of doubt, it is expressly agreed that the Independent Engineer may, at the cost of Seller, require Seller to carry out or cause to be carried out additional tests, in accordance with Good Industry Practice, for determining the compliance of the Facility with the Specifications and Standards and the Guaranteed Operating Characteristics.", "samples": [{"hash": "f6QJjZpv5kw", "uri": "/contracts/f6QJjZpv5kw#commissioning-tests", "label": "Power Purchase Agreement", "score": 35.4368782043, "published": true}, {"hash": "2iMjP6FhDvo", "uri": "/contracts/2iMjP6FhDvo#commissioning-tests", "label": "Power Purchase Agreement", "score": 35.4368782043, "published": true}, {"hash": "ja29ltBiKi1", "uri": "/contracts/ja29ltBiKi1#commissioning-tests", "label": "Power Purchase Agreement", "score": 33.2935180664, "published": true}], "size": 6, "snippet_links": [{"key": "prior-to-the", "type": "clause", "offset": [33, 45]}, {"key": "date-of-commissioning", "type": "definition", "offset": [53, 74]}, {"key": "the-facility", "type": "clause", "offset": [78, 90]}, {"key": "seller-shall", "type": "clause", "offset": [92, 104]}, {"key": "the-independent-engineer", "type": "clause", "offset": [112, 136]}, {"key": "date-and-time", "type": "clause", "offset": [211, 224]}, {"key": "in-consultation-with", "type": "definition", "offset": [294, 314]}, {"key": "the-commissioning", "type": "definition", "offset": [393, 410]}, {"key": "in-the-event", "type": "clause", "offset": [532, 544]}, {"key": "seller-and-the", "type": "clause", "offset": [550, 564]}, {"key": "mutually-agree", "type": "definition", "offset": [594, 608]}, {"key": "notice-to-the", "type": "clause", "offset": [715, 728]}, {"key": "in-accordance-with", "type": "definition", "offset": [809, 827]}, {"key": "testing-procedures", "type": "clause", "offset": [832, 850]}, {"key": "monitor-and-review", "type": "clause", "offset": [916, 934]}, {"key": "results-of-the-tests", "type": "clause", "offset": [939, 959]}, {"key": "to-determine", "type": "clause", "offset": [960, 972]}, {"key": "the-performance", "type": "clause", "offset": [1134, 1149]}, {"key": "does-not-meet", "type": "definition", "offset": [1186, 1199]}, {"key": "provisions-of-this-agreement", "type": "clause", "offset": [1204, 1232]}, {"key": "right-to-suspend", "type": "clause", "offset": [1252, 1268]}, {"key": "defects-or-deficiencies", "type": "definition", "offset": [1333, 1356]}, {"key": "completion-of", "type": "clause", "offset": [1363, 1376]}, {"key": "to-seller", "type": "clause", "offset": [1427, 1436]}, {"key": "copies-of-all", "type": "clause", "offset": [1445, 1458]}, {"key": "test-data", "type": "clause", "offset": [1459, 1468]}, {"key": "test-results", "type": "definition", "offset": [1488, 1500]}, {"key": "for-the-avoidance-of-doubt", "type": "clause", "offset": [1502, 1528]}, {"key": "agreed-that", "type": "clause", "offset": [1546, 1557]}, {"key": "of-seller", "type": "clause", "offset": [1600, 1609]}, {"key": "additional-tests", "type": "definition", "offset": [1666, 1682]}, {"key": "good-industry-practice", "type": "clause", "offset": [1703, 1725]}, {"key": "specifications-and-standards", "type": "definition", "offset": [1783, 1811]}, {"key": "guaranteed-operating-characteristics", "type": "definition", "offset": [1820, 1856]}], "hash": "b5df9cf81af0a61537966f08a0d38714", "id": 5}, {"snippet": "Contractor shall perform Commissioning Tests in accordance with Attachment 19 and Attachment 21.", "samples": [{"hash": "lDWm3SE10TP", "uri": "/contracts/lDWm3SE10TP#commissioning-tests", "label": "Lump Sum Turnkey Agreement (Tellurian Inc. /De/)", "score": 28.8658447266, "published": true}, {"hash": "8UPr45adYX3", "uri": "/contracts/8UPr45adYX3#commissioning-tests", "label": "Lump Sum Turnkey Agreement (Tellurian Inc. /De/)", "score": 28.8658447266, "published": true}, {"hash": "7QpvxlM66cf", "uri": "/contracts/7QpvxlM66cf#commissioning-tests", "label": "Lump Sum Turnkey Agreement (Tellurian Inc. /De/)", "score": 28.8658447266, "published": true}], "size": 4, "snippet_links": [{"key": "contractor-shall", "type": "clause", "offset": [0, 16]}, {"key": "in-accordance-with", "type": "definition", "offset": [45, 63]}], "hash": "f0caee875e494771fa72cf1d6cec459a", "id": 7}, {"snippet": "The Connecting Transmission Owner will witness the final commissioning tests. The Interconnection Customer will provide test reports for each relay, test reports for each current transformer, and a completed Checkout Form, stamped and signed by a New York State Professional Engineer. The Connecting Transmission Owner will verify that the proper relay settings are loaded into each relay, determine that the RTU is fully operational, and determine that metering is functional.", "samples": [{"hash": "3G9nmfQTnMO", "uri": "/contracts/3G9nmfQTnMO#commissioning-tests", "label": "Interconnection Agreement", "score": 27.707567215, "published": true}, {"hash": "fhWo2OpF88u", "uri": "/contracts/fhWo2OpF88u#commissioning-tests", "label": "Interconnection Agreement", "score": 26.2239131927, "published": true}, {"hash": "2tGlZvG58ZW", "uri": "/contracts/2tGlZvG58ZW#commissioning-tests", "label": "Interconnection Agreement", "score": 19.9543170929, "published": true}], "size": 4, "snippet_links": [{"key": "owner-will", "type": "clause", "offset": [28, 38]}, {"key": "final-commissioning", "type": "definition", "offset": [51, 70]}, {"key": "will-provide", "type": "clause", "offset": [107, 119]}, {"key": "test-reports", "type": "definition", "offset": [120, 132]}, {"key": "signed-by", "type": "definition", "offset": [235, 244]}, {"key": "new-york-state", "type": "clause", "offset": [247, 261]}, {"key": "professional-engineer", "type": "clause", "offset": [262, 283]}, {"key": "fully-operational", "type": "definition", "offset": [416, 433]}], "hash": "e3a68e4a74966c25bcbb68c075eb5d96", "id": 8}, {"snippet": "(i) Test the transformer oil for dielectric strength, tan-delta, and activity resistivity and dissolved gases.\n(ii) Test bushing oil for dielectric strength.\n(iii) Insulation test of winding (including tertiary winding if available).\n(iv) Capacitance and tan-delta test of condenser type bushings, before assembly.", "samples": [{"hash": "33EGdr3hoxu", "uri": "/contracts/33EGdr3hoxu#commissioning-tests", "label": "Concession Agreement", "score": 24.2511978149, "published": true}, {"hash": "5SsjEiyvHfL", "uri": "/contracts/5SsjEiyvHfL#commissioning-tests", "label": "Concession Agreement", "score": 24.0075283051, "published": true}, {"hash": "efgOdyIDmx2", "uri": "/contracts/efgOdyIDmx2#commissioning-tests", "label": "Concession Agreement", "score": 23.8446273804, "published": true}], "size": 3, "snippet_links": [{"key": "insulation-test", "type": "clause", "offset": [164, 179]}, {"key": "if-available", "type": "definition", "offset": [219, 231]}], "hash": "66cfaa2376d49c8a5ce8a2c48dcf5014", "id": 9}, {"snippet": "Section 7.3.1 Consistent with its obligations with respect to the Construction Schedule, Supplier shall, upon not less than ten (10) Business Days notice to System Owner and the Independent Engineer, in the presence of the Independent Engineer and, at System Owner\u2019s option, a representative of System Owner and the Host Customer, perform the Commissioning Tests in accordance with the test protocols set forth in Exhibit J.\nSection 7.3.2 Supplier shall, upon not less than ten (10) Business Days notice to System Owner and the Independent Engineer, in the presence of the Independent Engineer and, at System Owner\u2019s option, a representative of System Owner and the Host Customer, perform other industry standard tests as part of the Commissioning Tests as reasonably requested by System Owner.", "samples": [{"hash": "jaaEezPgv6p", "uri": "/contracts/jaaEezPgv6p#commissioning-tests", "label": "Solar System Installation Agreement (CBD Energy LTD)", "score": 25.0793972015, "published": true}, {"hash": "33fQUxPNIK3", "uri": "/contracts/33fQUxPNIK3#commissioning-tests", "label": "Solar System Installation Agreement (CBD Energy LTD)", "score": 24.786447525, "published": true}, {"hash": "iJHzxMakvDu", "uri": "/contracts/iJHzxMakvDu#commissioning-tests", "label": "Solar System Installation Agreement (CBD Energy LTD)", "score": 24.603012085, "published": true}], "size": 3, "snippet_links": [{"key": "section-731", "type": "clause", "offset": [0, 13]}, {"key": "consistent-with", "type": "definition", "offset": [14, 29]}, {"key": "with-respect-to", "type": "clause", "offset": [46, 61]}, {"key": "the-construction-schedule", "type": "clause", "offset": [62, 87]}, {"key": "supplier-shall", "type": "clause", "offset": [89, 103]}, {"key": "business-days", "type": "definition", "offset": [133, 146]}, {"key": "notice-to", "type": "definition", "offset": [147, 156]}, {"key": "system-owner", "type": "clause", "offset": [157, 169]}, {"key": "the-independent-engineer", "type": "clause", "offset": [174, 198]}, {"key": "in-the-presence-of", "type": "definition", "offset": [200, 218]}, {"key": "at-system", "type": "definition", "offset": [249, 258]}, {"key": "host-customer", "type": "definition", "offset": [316, 329]}, {"key": "the-commissioning", "type": "definition", "offset": [339, 356]}, {"key": "in-accordance-with", "type": "definition", "offset": [363, 381]}, {"key": "section-732", "type": "clause", "offset": [425, 438]}, {"key": "standard-tests", "type": "definition", "offset": [704, 718]}, {"key": "requested-by", "type": "clause", "offset": [768, 780]}], "hash": "6cd64588d0191ca29fb7138ab4e900bf", "id": 10}], "next_curs": "ClwSVmoVc35sYXdpbnNpZGVyY29udHJhY3RzcjgLEhZDbGF1c2VTbmlwcGV0R3JvdXBfdjU2Ihxjb21taXNzaW9uaW5nLXRlc3RzIzAwMDAwMDBhDKIBAmVuGAAgAA==", "clause": {"title": "Commissioning Tests", "size": 135, "parents": [["quality-assurance-and-evaluation-mechanism", "Quality Assurance and Evaluation Mechanism"], ["survival", "Survival"], ["operating-tests", "Operating Tests"], ["commissioning-and-start-up", "Commissioning and Start Up"], ["miscellaneous-provisions", "Miscellaneous Provisions"]], "children": [["", ""], ["year-2000-compliance", "Year 2000 Compliance"], ["tail-circuit", "TAIL CIRCUIT"], ["alternative-testing", "ALTERNATIVE TESTING"], ["test-beam", "TEST BEAM"]], "id": "commissioning-tests", "related": [["commissioning", "Commissioning", "Commissioning"], ["inspection-testing", "Inspection/Testing", "Inspection/Testing"], ["equipment-testing-and-inspection", "Equipment Testing and Inspection", "Equipment Testing and Inspection"], ["performance-tests", "Performance Tests", "Performance Tests"], ["drug-testing", "Drug Testing", "Drug Testing"]], "related_snippets": [], "updated": "2025-07-23T06:00:56+00:00", "also_ask": ["What minimum standards and acceptance criteria should be specified for commissioning tests?", "How can the clause allocate risk for failed or delayed commissioning tests?", "What negotiation levers exist regarding retesting rights and associated costs?", "How do commissioning test provisions compare across industry-standard contracts?", "What documentation and evidence are essential for enforceability in disputes over test results?"], "drafting_tip": "Specify test procedures and acceptance criteria to ensure clarity; set timelines to prevent delays; assign responsibilities to avoid disputes.", "explanation": "The Commissioning Tests clause defines the procedures and requirements for testing equipment or systems to ensure they meet specified performance standards before being accepted by the client. Typically, this clause outlines the timing, methods, and responsibilities for conducting the tests, as well as the criteria for passing or failing. For example, it may require the contractor to notify the client in advance and provide test results for review. Its core practical function is to verify that the delivered work operates as intended, thereby protecting the client from accepting defective or non-compliant systems."}, "json": true, "cursor": ""}}