{"component": "clause", "props": {"groups": [{"samples": [{"hash": "hFEuuGpbf9g", "uri": "/contracts/hFEuuGpbf9g#conductors", "label": "Call Off Contract", "score": 34.2652832934, "published": true}, {"hash": "dAzr57tbw87", "uri": "/contracts/dAzr57tbw87#conductors", "label": "Call Off Contract", "score": 33.4796587979, "published": true}, {"hash": "8IDHrTNSVN7", "uri": "/contracts/8IDHrTNSVN7#conductors", "label": "Call Off Contract", "score": 33.4276488139, "published": true}], "snippet": "Conductors shall consist of a stranded aluminum wires, as detailed elsewhere in the specification. They shall comply with latest IEC publication 60228. Non circular conductors shall be pre spiraled and compacted.", "snippet_links": [{"key": "consist-of", "type": "clause", "offset": [17, 27]}, {"key": "the-specification", "type": "definition", "offset": [80, 97]}, {"key": "comply-with", "type": "clause", "offset": [110, 121]}], "size": 9, "hash": "3a2c94721bc48c38fed851497b700f37", "id": 1}, {"samples": [{"hash": "iytBblExn", "uri": "/contracts/iytBblExn#conductors", "label": "Furnish and Install Agreement", "score": 26.1704312115, "published": true}, {"hash": "f2hWmOE8ekZ", "uri": "/contracts/f2hWmOE8ekZ#conductors", "label": "Furnish and Install Agreement", "score": 26.1704312115, "published": true}, {"hash": "eCU4CLcBGSQ", "uri": "/contracts/eCU4CLcBGSQ#conductors", "label": "Furnish and Install Agreement", "score": 26.1704312115, "published": true}], "snippet": "Item 44(a) Furnish and install #12 AWG XLP Copper conductor cable (600V). Item 44(b) Furnish and install #6 AWG XLP Copper conductor cable (600V). Item 44(c) Furnish and install #2 AWG XLP Copper conductor cable (600V). Item 44(c)1 Furnish and install #6 AWG XLP Aluminum conductor cable (600V). Item 44(d) Furnish and install #2/0 XLP Copper conductor cable (600V). Item 44(d)1 Furnish and install #4/0 XLP Copper conductor cable (600V). Item 44(e) Furnish and install #2 AWG EPR Copper conductor cable (15KV). Item 44(f) Furnish and install #2/0 AWG EPR Copper conductor cable (15kV). Item 44(g) Furnish and install 500 MCM EPR Copper conductor cable (15KV). Item 44(h) Furnish and install #4/0 AWG EPR Copper conductor cable (15kV).The Contractor shall furnish all labor, material, equipment, necessary to install cross linked polyethylene covered or EPR high voltage cable in conduit. All conductors run shall be continuous from box to box. The cable and method of installation shall be in accordance with these specifications. The work shall include but not be limited to the following:\na. Cleaning out of the conduit by the removal from there of all water, dirt, debris and foreign material.\nb. Making of all splices or connections at lampposts, cutouts, boxes, etc., where the new cables are installed or terminated. High voltage splices to be paid for under appropriate item.\nc. Performing all applicable tests including material, dielectric and high potential proof tests. Installing \u201cCopper Keeper\u201d or equivalent.\nd. Payment for the installation of new conductors shall be on a conductor foot basis and shall include all splices connections and terminations and all applicable tests.", "snippet_links": [{"key": "furnish-and-install", "type": "definition", "offset": [11, 30]}, {"key": "contractor-shall", "type": "clause", "offset": [739, 755]}, {"key": "high-voltage", "type": "clause", "offset": [858, 870]}, {"key": "in-conduit", "type": "clause", "offset": [877, 887]}, {"key": "method-of-installation", "type": "clause", "offset": [959, 981]}, {"key": "in-accordance-with", "type": "definition", "offset": [991, 1009]}, {"key": "these-specifications", "type": "definition", "offset": [1010, 1030]}, {"key": "the-work", "type": "definition", "offset": [1032, 1040]}, {"key": "foreign-material", "type": "definition", "offset": [1180, 1196]}, {"key": "or-equivalent", "type": "definition", "offset": [1509, 1522]}, {"key": "installation-of", "type": "clause", "offset": [1543, 1558]}], "size": 3, "hash": "46c835481d1de56b7217a71dc84d6bd9", "id": 2}, {"samples": [{"hash": "eKnwkBiCV1I", "uri": "/contracts/eKnwkBiCV1I#conductors", "label": "Wireless Fibersm Iru Agreement (Winstar Communications Inc)", "score": 18.0, "published": true}, {"hash": "b954uBLIWnT", "uri": "/contracts/b954uBLIWnT#conductors", "label": "Wireless Fiber Iru Agreement (Winstar Communications Inc)", "score": 18.0, "published": true}, {"hash": "71FGTxysTWg", "uri": "/contracts/71FGTxysTWg#conductors", "label": "Wireless Fiber Iru Agreement (Winstar Communications Inc)", "score": 18.0, "published": true}], "snippet": "WinStar Wireless, Inc. Hub Facility DC Power System conductor requirements must conform to the following parameters: All conductors are to be AWG type THHN insulated copper only. All conductor termination's are to be performed utilizing Compression (15) Ton High-Press, Hex or Circumventual Crimps will only be accepted. All termination's are to utilize (2) Hole NEMA Spaced Long Barrel Lugs only. All fastening hardware to be #316 Grade Stainless Steel only. All termination's are to be insulated utilizing Thick Wall Heat Shrink. All conductors are to secured utilizing #9 Round Wax Lacing Cord only. All conductors are to be permanently identified utilizing Fiber Cable Tags only. All conductors are to be routed complete point to point. Use of Splices is prohibited. Cabling from main distribution board to equipment racks shall be supported below cable ladder using \"J\" hooks.", "snippet_links": [{"key": "hub-facility", "type": "definition", "offset": [23, 35]}, {"key": "power-system", "type": "definition", "offset": [39, 51]}, {"key": "stainless-steel", "type": "definition", "offset": [438, 453]}, {"key": "main-distribution", "type": "clause", "offset": [784, 801]}, {"key": "equipment-racks", "type": "clause", "offset": [811, 826]}], "size": 3, "hash": "c4cb0391dc86e568988df0742058383d", "id": 3}, {"samples": [{"hash": "8wHaojsyT4a", "uri": "/contracts/8wHaojsyT4a#conductors", "label": "Furnish and Install Agreement", "score": 26.1704312115, "published": true}, {"hash": "j69ZxpG4OW1", "uri": "/contracts/j69ZxpG4OW1#conductors", "label": "Furnish and Install Agreement", "score": 25.6735112936, "published": true}, {"hash": "bGChjhy03Ws", "uri": "/contracts/bGChjhy03Ws#conductors", "label": "Furnish and Install Agreement", "score": 24.7344284736, "published": true}], "snippet": "The contractor is required to test cap cable(s) during installation as part of the cable item.", "snippet_links": [{"key": "the-contractor", "type": "clause", "offset": [0, 14]}], "size": 3, "hash": "344c1bad46b643e30bee3ec5ea602c80", "id": 4}, {"samples": [{"hash": "fgghiW6KBH5", "uri": "/contracts/fgghiW6KBH5#conductors", "label": "Furnish and Install Agreement", "score": 22.1567419576, "published": true}, {"hash": "a3OZ3ItMcSE", "uri": "/contracts/a3OZ3ItMcSE#conductors", "label": "Furnish and Install Agreement", "score": 22.1567419576, "published": true}, {"hash": "1N1EFoFpoOZ", "uri": "/contracts/1N1EFoFpoOZ#conductors", "label": "Furnish and Install Agreement", "score": 22.1567419576, "published": true}], "snippet": "Item 44(a) - Furnish and install #12 AWG XLP Copper conductor cable (600V). Item 44(b) - Furnish and install #6 AWG XLP Copper conductor cable (600V). Item 44(c) - Furnish and install #2 AWG XLP Copper conductor cable (600V). Item 44(c)1 - Furnish and install #6 AWG XLP Aluminum conductor cable (600V). Item 44(d) - Furnish and install #2/0 XLP Copper conductor cable (600V). Item 44(d)1- Furnish and install #4/0 XLP Copper conductor cable (600V). Item 44(e) - Furnish and install #2 AWG EPR Copper conductor cable (15KV). Item 44(f) - Furnish and install #2/0 AWG EPR Copper conductor cable (15kV).\n4.77.1 The Contractor shall furnish all labor, material, and equipment, necessary to install cross-linked polyethylene covered or EPR high voltage cable in conduit. All conductors run shall be continuous from box to box. The cable and method of installation shall be in accordance with these Specifications. The Work shall include but not be limited to the following:\n4.77.1.1 Cleaning out of the conduit by removing all water, dirt, debris and foreign material.\n4.77.2 Making of all splices or connections at lampposts, cutouts, boxes, etc., where the new cables are installed or terminated. High voltage splices to be paid for under appropriate item.", "snippet_links": [{"key": "furnish-and-install", "type": "definition", "offset": [13, 32]}, {"key": "the-contractor-shall", "type": "clause", "offset": [609, 629]}, {"key": "and-equipment", "type": "clause", "offset": [659, 672]}, {"key": "high-voltage", "type": "clause", "offset": [736, 748]}, {"key": "in-conduit", "type": "clause", "offset": [755, 765]}, {"key": "method-of-installation", "type": "clause", "offset": [837, 859]}, {"key": "in-accordance-with", "type": "definition", "offset": [869, 887]}, {"key": "these-specifications", "type": "definition", "offset": [888, 908]}, {"key": "the-work", "type": "definition", "offset": [910, 918]}, {"key": "foreign-material", "type": "definition", "offset": [1047, 1063]}], "size": 3, "hash": "5bb2360f9d947043689cb48e1638bfb7", "id": 5}, {"samples": [{"hash": "gyaXXxe15eL", "uri": "/contracts/gyaXXxe15eL#conductors", "label": "Plant Connection Agreement (Ormat Technologies, Inc.)", "score": 19.0, "published": true}, {"hash": "8pFZMyCrCnR", "uri": "/contracts/8pFZMyCrCnR#conductors", "label": "Plant Connection Agreement (Ormat Technologies, Inc.)", "score": 19.0, "published": true}, {"hash": "8nd5b7YZo7u", "uri": "/contracts/8nd5b7YZo7u#conductors", "label": "Plant Connection Agreement (Ormat Technologies, Inc.)", "score": 19.0, "published": true}], "snippet": "Bundled or unbundled, 1033 MCM, Aluminum Conductor, Steel Reinforced (ACSR) cable. Strength requirements shall be in accordance with G.O. 95. Groundwire: One groundwire, approximately 0.5 inch in diameter, attached to the top of tower or pole.", "snippet_links": [{"key": "in-accordance-with", "type": "definition", "offset": [114, 132]}], "size": 3, "hash": "aefba334126a6b2a5b318b7fb6c0c660", "id": 6}, {"samples": [{"hash": "eKnwkBiCV1I", "uri": "/contracts/eKnwkBiCV1I#conductors", "label": "Wireless Fibersm Iru Agreement (Winstar Communications Inc)", "score": 18.0, "published": true}, {"hash": "b954uBLIWnT", "uri": "/contracts/b954uBLIWnT#conductors", "label": "Wireless Fiber Iru Agreement (Winstar Communications Inc)", "score": 18.0, "published": true}, {"hash": "71FGTxysTWg", "uri": "/contracts/71FGTxysTWg#conductors", "label": "Wireless Fiber Iru Agreement (Winstar Communications Inc)", "score": 18.0, "published": true}], "snippet": "WinStar Wireless, Inc. Hub Facility AC Power System conductor requirements must conform to the following parameters: All conductors are to be AWG type THHN insulated copper only. All conductor termination's are to be performed utilizing Compression (15) Ton High-Press, Hex or Circumventual Crimps will only be accepted. All termination's are to utilize (2) Hole NEMA Spaced Long Barrel Lugs only. All fastening hardware to be #316 Grade Stainless Steel only. All termination's are to be insulated utilizing Thick Wall Heat Shrink. All conductors are to be permanently identified utilizing Fiber Cable Tags only.", "snippet_links": [{"key": "hub-facility", "type": "definition", "offset": [23, 35]}, {"key": "power-system", "type": "definition", "offset": [39, 51]}, {"key": "stainless-steel", "type": "definition", "offset": [438, 453]}], "size": 3, "hash": "f41ab58dcf09933f533fee73af316b5a", "id": 7}, {"samples": [{"hash": "gVp9SdXqQdk", "uri": "/contracts/gVp9SdXqQdk#conductors", "label": "Architectural and Engineering Services Agreement", "score": 32.7278984144, "published": true}, {"hash": "bpu4zQe0eee", "uri": "/contracts/bpu4zQe0eee#conductors", "label": "Architectural and Engineering Services Agreement", "score": 32.3668292417, "published": true}], "snippet": "Install solid conductor for No. 8 AWG and smaller, and stranded conductors for No. 6 AWG and larger unless otherwise indicated.", "snippet_links": [{"key": "unless-otherwise-indicated", "type": "clause", "offset": [100, 126]}], "size": 3, "hash": "04e96cfe3d1f7092352a416e8bc93d72", "id": 8}, {"samples": [{"hash": "dzZPzwpcQ2a", "uri": "/contracts/dzZPzwpcQ2a#conductors", "label": "Call Off Contract", "score": 33.824567113, "published": true}], "snippet": "Conductor shall be Stranded copper conductor class 2, according to IEC 60228.", "snippet_links": [{"key": "class-2", "type": "clause", "offset": [45, 52]}, {"key": "according-to", "type": "definition", "offset": [54, 66]}], "size": 3, "hash": "7f9996a133596b9eef8e58362812c882", "id": 9}, {"samples": [{"hash": "xUkyc6nzBR", "uri": "/contracts/xUkyc6nzBR#conductors", "label": "Call Off Contract", "score": 34.2652832934, "published": true}], "snippet": "Conductors shall be copper circular non -compacted Stranded for required items according to IEC 60228.", "snippet_links": [{"key": "required-items", "type": "clause", "offset": [64, 78]}, {"key": "according-to", "type": "definition", "offset": [79, 91]}], "size": 3, "hash": "10eb7394ae487c324cbfe277222ac295", "id": 10}], "next_curs": "ClMSTWoVc35sYXdpbnNpZGVyY29udHJhY3Rzci8LEhZDbGF1c2VTbmlwcGV0R3JvdXBfdjU2IhNjb25kdWN0b3JzIzAwMDAwMDBhDKIBAmVuGAAgAA==", "clause": {"title": "Conductors", "parents": [["correspondences", "Correspondences"], ["meeting", "Meeting"], ["applications", "Applications"], ["break-room-conference-room", "Break Room/Conference Room"], ["introduction", "INTRODUCTION"]], "size": 80, "children": [["design-basis", "Design  Basis"], ["cable-ampacities", "Cable Ampacities"], ["insulation", "Insulation"], ["insulated-conductors", "Insulated Conductors"]], "id": "conductors", "related": [["assembly", "Assembly", "Assembly"], ["insulation", "Insulation", "Insulation"], ["structures", "Structures", "Structures"], ["electrical", "Electrical", "Electrical"], ["generators", "Generators", "Generators"]], "related_snippets": [], "updated": "2025-07-07T12:37:53+00:00", "also_ask": [], "drafting_tip": null, "explanation": "The Conductors clause defines the responsibilities and qualifications of individuals or entities designated to oversee or manage certain activities or operations under the agreement. Typically, this clause outlines who may act as a conductor, what authority they possess, and any requirements or standards they must meet, such as certifications or experience. By clearly specifying these details, the clause ensures that only competent and authorized parties are entrusted with critical tasks, thereby promoting safety, compliance, and effective management."}, "json": true, "cursor": ""}}