CROSSING BY CUTTING PAVEMENT AND TRENCHING Sample Clauses

CROSSING BY CUTTING PAVEMENT AND TRENCHING. When this method is used, the pavement shall be cut back so that the opening is at least twelve (12) inches wider on each side than the width of the trench. In all concrete surfaces or bases, edges of trenches shall be formed by the use of a concrete saw. The pavement shall be broken in such a manner as to allow the reinforcing steel, if any, to protrude a sufficient distance for lapping or tying with similar reinforcement in the pavement patch. Backfill shall be in accordance with Paragraph 3. After the backfill has been thoroughly compacted, the pavement shall be replaced with processed road gravel (MDOT 22A) stabilized with chloride until such time as the pavement can be replaced with new pavement by the permit licensee. Maintenance of the temporary pavement will be assumed by the City if the contractor fails to do so and cost incurred will be deducted from the permit licensee's deposit.
AutoNDA by SimpleDocs

Related to CROSSING BY CUTTING PAVEMENT AND TRENCHING

  • Fences Except for establishment cost incurred by the United States and replacement cost not due to the Landowner’s negligence or malfeasance, all other costs involved in maintenance of fences and similar facilities to exclude livestock are the responsibility of the Landowner. The installation or use of fences which have the effect of preventing wildlife access and use of the Easement Area are prohibited on the Easement Area, easement boundary, or on the Landowner’s land that is immediately adjacent to, and functionally related to, the Easement Area.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

  • Use of Basement and Service Areas The basement(s) and service areas, if any, as located within the (project name), shall be earmarked for purposes such as parking spaces and services including but not limited to electric sub-station, transformer, DG set rooms, underground water tanks, pump rooms, maintenance and service rooms, fire fighting pumps and equipment's etc. and other permitted uses as per sanctioned plans. The Allottee shall not be permitted to use the services areas and the basements in any manner whatsoever, other than those earmarked as parking spaces, and the same shall be reserved for use by the association of allottees formed by the Allottees for rendering maintenance services.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When Southern Telecom or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!