Common use of Final Payment Clause in Contracts

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06.

Appears in 69 contracts

Samples: Agreement, Agreement, Agreement

AutoNDA by SimpleDocs

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.0614.07.

Appears in 26 contracts

Samples: Agreement, Agreement, Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General ConditionsWork, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said accordance with Paragraph 15.0615.06 of the General Conditions.

Appears in 20 contracts

Samples: Agreement Between Owner and Contractor for Construction Contract, Agreement Between Owner and Contractor for Construction Contract, 00 Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 Article 13 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06Article 13.

Appears in 15 contracts

Samples: City of Fishers, City of Fishers, Agreement Between Owner and Contractor

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.07 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.06paragraph 14.07.

Appears in 12 contracts

Samples: Construction Agreement, Agreement, pbsdwi.com

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph paragraph 15.06 of the General Conditions, and settlement of all claims, including liquidated damages, if any, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph paragraph 15.06.

Appears in 5 contracts

Samples: Agreement, Agreement, 00500 Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 Item 109.5.4 of the General ConditionsProvisions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06ENGINEER.

Appears in 5 contracts

Samples: Form of Agreement, Form of Agreement, Form of Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.07 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.06paragraph 14.07.

Appears in 5 contracts

Samples: Agreement, Agreement, Contract Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.07 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.06paragraph 14.08.

Appears in 5 contracts

Samples: Agreement, Agreement, Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General ConditionsWork, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06Engineer.

Appears in 4 contracts

Samples: Construction Agreement for Sidewalk, Form Construction Bid Agreement, Form Construction Bid Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.07 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ARCHITECT as provided in said Paragraph 15.06paragraph 14.07.

Appears in 4 contracts

Samples: Agreement, Agreement, Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 Article 13.13 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer PROJECT MANAGER as provided in said Paragraph 15.06Article 13.13.

Appears in 4 contracts

Samples: www.sariverauthority.org, www.sariverauthority.org, www.sariverauthority.org

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.13 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06paragraph 14.13.

Appears in 4 contracts

Samples: Document 530, Document 530, Document 530 Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 6.09 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.06paragraph 6.09.

Appears in 3 contracts

Samples: Form of Agreement, Form of Agreement, www.pearlandtx.gov

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General ConditionsWork, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06.A/E.

Appears in 3 contracts

Samples: Agreement, Agreement, Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.13 of the General Conditions, including timely submission of an Application for Final Payment, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06paragraph 14.13. Contractor agrees that failure to timely submit a Final Application for Payment pursuant to paragraph 14.13(a) will result in forfeiture of any remaining amounts due.

Appears in 3 contracts

Samples: Document 530 Agreement, Agreement, Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer Price, and any retained funds, as provided in said Paragraph 15.0614.07.

Appears in 3 contracts

Samples: Agreement, Agreement, Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 14.07 of the General Conditions, completion of the Owner’s Final Payment Audit, and settlement of all Claims, Owner shall pay the remainder make payment of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06amounts due Construction Manager.

Appears in 2 contracts

Samples: Construction Manager at Risk Agreement, Construction Manager at Risk Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraphs 14.2 through 14.9 of the General Conditions, Owner and settlement of all claims, OWNER shall pay the remainder of the Contract Price as recommended by Engineer as provided ARCHITECT in accordance with said Paragraph 15.06paragraphs 14.12 through 14.15.

Appears in 2 contracts

Samples: Agreement, Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 Article 14 of the General Conditions, the Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06the Engineer.

Appears in 2 contracts

Samples: Agreement for Construction Services, Agreement for Construction Services

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 14.07 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.0614.07.

Appears in 2 contracts

Samples: Agreement, 52 00 Agreement

Final Payment. A. Upon final completion and acceptance of acceptanceof the Work in accordance with Paragraph 15.06 paragraph 14.13 of the General Conditions, including timely submission of an Application for Final Payment, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06paragraph 14.13. Contractor agrees that failure to timely submit a Final Application for Payment pursuant to paragraph 14.13(a) will result in forfeiture of any remaining amounts due.

Appears in 2 contracts

Samples: Document 530a Days Certain Agreement, Document 530a Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06paragraph 14.07.

Appears in 2 contracts

Samples: Agreement, Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06paragraph 14.07.

Appears in 2 contracts

Samples: Agreement, Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 90-9 of the General ConditionsProvisions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.06paragraph 90-9.

Appears in 2 contracts

Samples: Section 00500 Agreement, Section 00500 Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 14.07 of the General Conditions, the Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.0614.07.

Appears in 2 contracts

Samples: Agreement, Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 13.08 of the Standard General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06Price.

Appears in 2 contracts

Samples: Agreement (Nova Oil Inc), Agreement (Nova Oil Inc)

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06Paragraph.

Appears in 2 contracts

Samples: Agreement, Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General ConditionsGENERAL CONDITIONS, Owner shall pay the remainder of the Contract Price as recommended by Engineer and as provided in said Paragraph 15.06the GENERAL CONDITIONS.

Appears in 1 contract

Samples: Agreement (Onsite Energy Corp)

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer Owner as provided in said Paragraph 15.06.

Appears in 1 contract

Samples: Section 00500

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.8 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer Engineer/Architect as provided in said Paragraph 15.06paragraph 14.8 of the General Conditions.

Appears in 1 contract

Samples: Document 00500 Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General ConditionsWork, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06Engineer.

Appears in 1 contract

Samples: Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph section 15.06 of the Standard General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph section 15.06.

Appears in 1 contract

Samples: Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06.

Appears in 1 contract

Samples: Section 00 52 13 Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.07 of the Standard General ConditionsConditions of the Construction Contract, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.06paragraph 14.07.

Appears in 1 contract

Samples: Construction Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 13.08 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06Price.

Appears in 1 contract

Samples: Nova Oil Inc

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 the General Conditions or Supplemental General Conditions of the General ConditionsProject Manual, as applicable, Owner shall pay the remainder of the Contract Price as recommended by Engineer Engineer/Architect or Project Manager as provided in said Paragraph 15.06General Conditions, as applicable.

Appears in 1 contract

Samples: For Construction Contract

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer Architect as provided in said Paragraph 15.06.

Appears in 1 contract

Samples: www.lakelandgov.net

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General ConditionsWork, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06accordance with Article 15 of the General Conditions.

Appears in 1 contract

Samples: www.hartfordsd.us

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General ConditionsGENERAL CONDITIONS, Owner shall pay the remainder of the Contract Price as recommended by Engineer and as provided in said Paragraph 15.06.the GENERAL CONDITIONS. ARTICLE 6 - NOT USED

Appears in 1 contract

Samples: legistarweb-production.s3.amazonaws.com

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 15.05 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph paragraph 15.06.

Appears in 1 contract

Samples: Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 Section 105 of the General ConditionsSpecifications, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06.

Appears in 1 contract

Samples: Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.07 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER in coordination with the OWNER as provided in said Paragraph 15.06paragraph 14.07 of the General Conditions.

Appears in 1 contract

Samples: Form of Agreement

AutoNDA by SimpleDocs

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 14.07 of the General Conditions, Owner shall pay the remainder theremainder of the Contract Price as recommended by Engineer Price, and any retained funds, as provided in said Paragraph 15.0614.07.

Appears in 1 contract

Samples: Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.13 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.06paragraph 14.13.

Appears in 1 contract

Samples: Document 00500 Agreement (Clyde Companies Inc)

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 14.13 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.06paragraph 14.13.

Appears in 1 contract

Samples: Section 00500 Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.07 of the General Conditions, Owner Conditions and Supplementary Conditions SC-9.03(B)(13). OWNER shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06ENGINEER.

Appears in 1 contract

Samples: 00500 Sample Contract

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.07 of the General Conditions, Owner the OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.06paragraph 14.07.

Appears in 1 contract

Samples: Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the Standard General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06.

Appears in 1 contract

Samples: www.cityofbethel.org

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph paragraph 15.06 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph paragraph 15.06.

Appears in 1 contract

Samples: 005200 Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.0614.07. The Contractor acknowledges his obligation under the Agreement regarding correction of Work for a minimum period of one (1) year and the One Year Correction period as set forth in the General Conditions and any longer guarantee periods as may be set forth in detailed specifications for various individual items of work.

Appears in 1 contract

Samples: Document 00 52 00 Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 GC-54 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06GC-54.

Appears in 1 contract

Samples: City of Lawrence, Kansas Construction Contract

Final Payment. A. Upon final completion Completion and acceptance of the Work in accordance with Paragraph 15.06 14.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.0614.07.

Appears in 1 contract

Samples: Form of Agreement

Final Payment. A. Upon final completion and acceptance of the Work work in accordance with Paragraph 15.06 paragraph 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06paragraph 14.07 of the General Conditions.

Appears in 1 contract

Samples: Contract Documents

Final Payment. A. Upon final completion and acceptance Final Acceptance of the Work in accordance with Paragraph 15.06 paragraph 13.08 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06paragraph 13.08.

Appears in 1 contract

Samples: Design Build Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 15.9 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer Architect as provided in said Paragraph 15.0615.9.

Appears in 1 contract

Samples: Construction Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 14.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06Price.

Appears in 1 contract

Samples: Section I‐1 Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.07 of the General Conditions, Owner shall pay the remainder of the OWNER shallpaytheremainder ofthe Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.06paragraph 14.07.

Appears in 1 contract

Samples: Contract Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.13 of the General Conditions, including timely submission of an Application for Final Payment, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06paragraph 14.13. Contractor agrees that failure to timely submit a Final Application for Payment pursuant to Section 14.13(a) will result in forfeiture of any remaining amounts due.

Appears in 1 contract

Samples: Document 530 Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 Article 14 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.06Article 14.

Appears in 1 contract

Samples: Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.07 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.06paragraph 154.07.

Appears in 1 contract

Samples: E Energy Adams LLC

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 Section 14.07 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.06Section 14.07 of the General Conditions.

Appears in 1 contract

Samples: Section 00500

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 section 9.10 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price Sum as recommended by Engineer ARCHITECT as provided in said Paragraph 15.06section 9.10.

Appears in 1 contract

Samples: Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph paragraph 15.06 of the General Conditions, Owner . OWNER shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06Price.

Appears in 1 contract

Samples: Agreement

Final Payment. A. Upon final completion and acceptance of the Work work in accordance with Paragraph 15.06 paragraph 14.07 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06ENGINEER.

Appears in 1 contract

Samples: Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph paragraph 15.06 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph paragraph 15.06.

Appears in 1 contract

Samples: Town of Westwood

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 13.09 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06Price.

Appears in 1 contract

Samples: Agreement (Western Plains Energy LLC)

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.13 of the General Conditions, Owner OWNER shall pay the remainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.0614.13.

Appears in 1 contract

Samples: Agreement (United Wisconsin Grain Producers LLC)

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 13.09 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06Price.

Appears in 1 contract

Samples: Agreement

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 Section 50 of the General ConditionsProvisions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06paragraph 90-09.

Appears in 1 contract

Samples: Contract

Final Payment. A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 paragraph 14.07 of the General Conditions, Owner OWNER shall pay the remainder paytheremainder of the Contract Price as recommended by Engineer ENGINEER as provided in said Paragraph 15.06paragraph 14.07.

Appears in 1 contract

Samples: Contract Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!