Functional Design Completion Sample Clauses

Functional Design Completion. The ship’s functional design shall be 100% complete. The Functional Design Products that comprise the functional design are listed below. These products and documents that comprise the functional design shall have a documented resolution to all comments related to contract compliance concerns. The associated DIs shall be delivered no later than one (1) month prior to the commencement of PRR. Functional Design Products DRL TITLE DI-014 MASTER EQUIPMENT LIST CHARACTERISTICS DI-025 SPEED AND POWER REPORT DI-026 SEAKEEPING PERFORMANCE REPORT DI-027 MANEUVERING PERFORMANCE REPORT DI-028 DYNAMIC POSITIONING SYSTEM PERFORMANCE REPORT DI-036-02 AIRBORNE NOISE REPORT DI-036-03 SONAR SELF-NOISE REPORT DI-036-04 UNDERWATER RADIATED NOISE REPORT DI-036-05 VIBRATION REPORT DI-039-01 INTACT AND DAMAGE STABILITY REPORT DI-045-04 GENERAL ARRANGEMENT DRAWING DI-045-05 MACHINERY ARRANGEMENTS DRL TITLE DI-045-06 TOPSIDE ARRANGEMENT DRAWING DI-045-07 EQUIPMENT REMOVAL DRAWING DI-045-08 COMPARTMENT LAYOUT DRAWINGS DI-045-09 AREA/VOLUME REPORT DI-045-10 MIDSHIP SECTION DRAWING DI-045-11 SHELL EXPANSION DRAWING DI-045-12 TYPICAL SECTIONS DRAWING DI-045-14 DECK AND PLATFORM DRAWING DI-045-15 SUPERSTRUCTURE DRAWING DI-045-16 PROPELLER DRAWING DI-045-19 PROPULSION SHAFTING ARRANGEMENT DRAWING DI-045-20 ELECTRIC POWER LOAD ANALYSIS DI-045-21 ELECTRICAL POWER ONE-LINE DIAGRAM DI-045-22 VOLTAGE DROP CALCULATIONS DI-045-25 LIGHTING SYSTEM ONE-LINE DIAGRAM DI-045-27 INTERIOR AND EXTERIOR COMMUNICATION SYSTEMS BLOCK WIRING DIAGRAM DI-045-30 SCIENCE WIREWAYS DIAGRAMS DI-045-31 AUXILIARY AND POLLUTION CONTROL SYSTEMS DOCUMENTATION DI-045-33 HVAC DIAGRAMMATIC PLAN AND EQUIPMENT LIST DI-045-34 HVAC CALCULATIONS DI-045-37 APPENDAGE AND CONTROL SURFACE DRAWING DI-045-38 ANCHORING AND MOORING DRAWING DI-045-39 HANDLING SYSTEM AND SCIENTIFIC SYSTEMS DEPLOYMENT DRAWING DI-045-43 IMPRESSED CURRENT CATHODIC PROTECTION SYSTEM BLOCK WIRING DIAGRAM DI-059-01 WEIGHT CONTROL PLAN DI-059-02 ACCEPTED WEIGHT ESTIMATE DI-059-03 QUARTERLY WEIGHT REPORT DI-060 ENDURANCE FUEL CALCULATIONS DI-061-08 ELECTRICAL SYSTEM FAULT CURRENT ANALYSIS DI-062 PROPULSION SHAFT VIBRATION REPORT DI-064-03 SES SSV ARRANGEMENT DRAWING DI-064-04 SES SEACHEST INTEGRATION WITH HULL STRUCTURE DI-064-08 SES SYSTEMS WIRING DIAGRAM
AutoNDA by SimpleDocs

Related to Functional Design Completion

  • ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work:  Drainage installation  Subgrade compaction  Rock compaction SUBSECTION RESTRICTIONS

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall:

  • Construction Sequencing In general, the sequence of the proposed dates of Initial Operation of Interconnection Customers seeking interconnection to the Transmission System will determine the sequence of construction of Network Upgrades.

  • Final Design A.4.1. Provide OWNER with proposed final construction drawings and detailed opinions of probable total Project construction costs in writing for OWNER' s review, prior to completion of the final Contract Documents, so that any changes that may be necessary in accordance with Project' s budgetary schedule can be made prior to bid.

  • Substantial Completion “Substantial Completion” means the stage in the progress of the Work when the Work, or designated portions thereof, may still require minor modifications or adjustments but, in the Owner’s opinion, the Work has progressed to the point such that all parts of the Work under consideration are fully operational and usable for intended purposes, as evidenced by a Certificate of Substantial Completion approved by the Owner. If a Certificate of Occupancy is required by public authorities having jurisdiction over the Work, said certificate shall be issued before the Work or any portion thereof is considered substantially complete. When the Contractor considers that the Work, or a portion thereof which the Owner agrees to accept separately, is substantially complete, the Contractor shall notify Owner’s Designated Representative (sometimes referred to as the “ODR”) and request a determination as to whether the Work or designated portion thereof is substantially complete. If the ODR does not consider the Work substantially complete, the ODR will notify the Contractor giving reasons therefore. Failure on the Owner’s part to list a reason does not alter the responsibility of the Contractor to complete all Work in accordance with the terms of this Agreement. After satisfactorily completing items identified by Owner’s Designated Representative, the Contractor shall then submit another request for the ODR to determine Substantial Completion. If The ODR considers the Work substantially complete, The ODR will prepare and deliver a certificate of Substantial Completion which shall establish the date of Substantial Completion, shall include a punch list of items to be completed or corrected before final completion and final payment, shall establish the time within which the Contractor shall finish the punch list, and shall establish responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work, warranty and insurance. Failure to include an item on the punch list does not alter the responsibility of the Contractor to complete all Work in accordance with the terms and conditions of this Agreement. The certificate of Substantial Completion shall be signed by the Owner and the Contractor to evidence acceptance of the responsibilities assigned to them in such certificate. Substantial Completion (as defined in this agreement) for all stages of the Work shall be achieved on or before the following Substantial Completion date: DATE FOR SUBSTANTIAL COMPLETION: TBD Under no circumstances will the time for Substantial Completion exceed this date without a written amendment to this Agreement. THE TIMES SET FORTH IN THE CONSTRUCTION DOCUMENTS ARE AN ESSENTIAL ELEMENT OF THE AGREEMENT. TIME LIMITS STATED IN THE CONTRACT DOCUMENTS ARE OF THE ESSENCE OF THIS AGREEMENT.

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.