Furnish and Install. For items that require installation, Vendor shall have the complete responsibility for the Products until it is installed and working. Any special installation preparation and requirements must be submitted to OHI in advance. All transportation and coordination arrangement will be the responsibility of the Vendor at Vendor’s expense. Delivery will be coordinated so that Products will be delivered directly to the installation site unless otherwise agreed. Vendor agrees to cooperate with OHI for the installation.
Furnish and Install. 4" Hot Dipped Galvanized Steel Conduit in Unpaved Area (on highways).
Furnish and Install. ANCHOR BOLT FOUNDATION HARDWARE ON A RECONSTRUCTED WALL OR BARRIER. PRICE PER UNIT ITEM. 4 20.02.10 FURNISH AND INSTALL STANDARD TYPE ANCHOR BOLT FOUNDATION AS PER DWG J-5253 FOR INSTALLING TYPE "BC", "M", " 5TH AVE." AND "LYRE" LAMPPOST. PRICE PER UNIT ITEM. 3 20.02.11 MODIFY STANDARD TYPE ANCHOR BOLT FOUNDATION AS PER DWG J-5253 FOR INSTALLING TYPE "BC", "M" , "5TH AVE." AND "LYRE" LAMPPOST. PRICE PER UNIT ITEM. 4 20.02.13 FURNISH AND INSTALL STANDARD TYPE ANCHOR BOLT FOUNDATION WITH GROUND ROD AS PER DWGS E-3788 AND H-5019. PRICE PER UNIT ITEM. 3 20.02.14 FURNISH AND INSTALL STANDARD TYPE ANCHOR BOLT FOUNDATION ON HIGHWAYS AS PER DWG E-3788. PRICE PER UNIT ITEM. 120 20.03.01 FURNISH AND INSTALL PEDESTAL TYPE CONCRETE FOUNDATION AS PER DWG D- 3044A PRICE PER UNIT ITEM. 3 20.03.09 FURNISH AND INSTALL FOUNDATION ON BOARDWALK AS PER DWG J-5113. PRICE PER UNIT ITEM. 3 20.03.10 FURNISH AND INSTALL FOUNDATION FOR 48FT. LAMPPOST WITH TRANSFORMER BASE AS PER DWG J-5246. PRICE PER UNIT ITEM. 4 20.03.11 FURNISH AND INSTALL FOUNDATION ON A CONCRETE BARRIER AS PER DWG H- 5220. PRICE PER UNIT ITEM. 4 20.03.13 FURNISH AND INSTALL ADAPTER PLATE AND VIBRATION PAD ASSEMBLY AS PER DWG J-5248. PRICE PER UNIT ITEM. 4 20.05.11 FURNISH AND INSTALL COMBINATION LAMPPOST FOUNDATION AND TWO FENDER GUARDS AS PER DWG E-2761. PRICE PER UNIT ITEM. 4 20.07.02
Furnish and Install. All-American baked enamel toilet partitions in the rest rooms to meet the layout needs of the attached floor plan. ------ KEYING ------
Furnish and Install. For items that require installation, Vendor shall have the complete responsibility for the Capital until it is installed and operational. Any special installation preparation and requirements must be submitted to OHI in advance. All transportation and coordination arrangement will be the responsibility of the Vendor at Vendor’s expense. Delivery will be coordinated so that Capital will be delivered directly to the installation site unless otherwise agreed. Vendor agrees to cooperate with OHI for the installation.
Furnish and Install gate giving Lessee access to the area West of the building (but Lessee to furnish and install motor or other attachments required by Lessee).
Furnish and Install. Pedestrian Crossing and Signal Upgrades – Cedar Street and Xxxxxxx Drive Intersection FMD Project No. 1658939 / Bid No. 74874170 Furnish and Install: Pedestrian Crossing and Signal Upgrades – Cedar Street and Xxxxxxx Drive Intersection And the Bidding Documents and Addendums No. (s) , as well as the site and conditions affecting the work, the Bidder hereby proposes to furnish all services, labor, materials, and equipment called for by them for the entire work, in accordance with the aforesaid documents, for the sum of:
Furnish and Install. This price is full compensation for furnishing and installing barrier sections and connection hardware.
Furnish and Install. Copper Weld Ground Rod and Clamp, As per Drawing H-5019. Item 28.01.02 Furnish and install copper weld ground rod and clamp in dirt area, buried box, sidewalk or roadway as per DWG H-5019.
Furnish and Install. 12.5.1.9.1. Any temporary wiring of a special nature, other than that specified above, required for project work, and
12.5.1.9.2. Any temporary wiring of construction offices and buildings.