Installation Activities Sample Clauses

Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the refrigeration compressor controller installation to see if they meet the specifications of the DEA in terms of quantity, quality and rating. Verify if they perform in accordance with the specifications in the DEA and meeting all functional tests and provide commissioning report for each unit An annual visual inspection of a sample of units will occur to ensure the equipment is still in place and operational. Option B is for projects where: i) the potential to perform and generate savings needs to be verified, and ii) actual performance during the term of the Agreement needs to be measured (verified). Option B involves procedures for verifying the same items as Option A plus actual achieved energy savings during the term of the Agreement. Performance verification techniques involve engineering calculations with metering and monitoring. Option B:  confirms that the proper equipment/systems were installed and that they have the potential to generate the predicted savings  determines an energy (and cost) savings value using measured data taken as needed throughout the M&V term. Methods employed in this option will involve the use of short or long-term measurement of one or more variables. Reference: NEMVP Version 1.0 ECM 3.1 Energy Management System - Temperature Setback B ECM 3.2 Energy Management System - Exhaust Fan/Relief Damper Control B ECM 3.3 Energy Management System - Demand Controlled Ventilation B ECM 3.4 Energy Management System - Optimal Start B ECM 3.1: Energy Management System - Temperature Setback M&V Option: NEMVP-B (continuous) Measuring Equipment: Energy Management System Measuring Equipment Accuracy: ±3% of measurement range Measuring Equipment Calibration: Not applicable. Measurement Period: 15 minute samples Measurement Frequency: Continuous measurement Measurement and Verification Details: During detail audit on site it was documented that the interior temperature was maintained at occupied levels all day and night. Energy Management system will continuously monitor post-retrofit space temperature, set point temperatures outside air temperature for a sample set of rooms within each of the heating/cooling zones. The date-time stamp will be included to differentiate occupied/unoccupied and summer/winter periods. ECM 3.2: Energy Management System - Exhaust Fan/Relief Damper Control M&V Option: NEMVP-B (continuous) Measuring Equipment: Energy Ma...
AutoNDA by SimpleDocs
Installation Activities. Subject to the timely receipt of NuPathe’s payments as set forth in the payment schedule attached hereto as Annex 4 (the “Payment Schedule”), LTS AG shall use its Commercially Reasonable Efforts to perform the Installation Activities and to perform those in accordance with the Project Plan. (a) In the event that LTS AG becomes aware that the Commercial Equipment will not meet the Requirements or the Installation Activities will not be completed in accordance with the Project Plan, then LTS AG shall immediately notify NuPathe in writing. In such event, LTS AG and NuPathe shall jointly agree in writing to necessary changes, if any, to the Commercial Equipment or Installation Activities or Project Plan. If the amounts in the Payment Schedule for the purchase of the Commercial Equipment or the man-hours set forth therein for the Installation Activities are not sufficient, the Parties shall discuss in good faith coverage of the costs for completion of the purchase of the Commercial Equipment and the Installation Activities. LTS AG shall not spend any amounts or man-hours exceeding the Payment Schedule or Project Plan, as applicable, without the prior written agreement of the Parties. (b) In the event that NuPathe requests a material change to the Commercial Equipment or Project Plan (a “Material Change”), LTS AG shall provide NuPathe with a revised Payment Schedule and Project Plan and shall provide an overview of non-cancellable obligations that LTS AG has in connection with the Commercial Equipment and the costs related thereto. LTS AG shall not change the Commercial Equipment or revise the Project Plan without the prior written agreement of the Parties. In the event that due to a Material Change non-cancellable obligations of LTS AG become obsolete, then NuPathe shall cover those costs. LTS AG shall in any event use its reasonable best efforts to minimize those costs after the Parties reached agreement to actually change the Commercial Equipment or the Project Plan.
Installation Activities. EVCS shall, at its sole cost and expense, be responsible for all installation activities (hereafter "Installation Activities") required to support the operation of the Equipment, and services therewith, including the hiring and coordination of all vendors and contractors; the installation of electrical equipment, utility lines, hardware, and software; site preparation, trenching, repaving, and landscaping. All installation activities will be overseen by Site Host.
Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the compressor installation to see if they meet the specifications of the DEA in terms of quantity. ECM 15: Refrigeration Compressor Controllers M&V Option: NEMVP-A (One Time) A digital camera will be used to document that a controller does not exist.
Installation Activities. Accuracy of the as-built will be verified (sampling will be conducted as detailed in the sampling procedure). A digital camera will be used to document the post-retrofit conditions. A thermal gun or an infrared camera will be used to verify installation. Combustion analyzer will be used to measure combustion efficiency. A digital camera will be used to document the post- retrofit conditions. Verify if it performs in accordance with the functional specifications in the Detailed Energy Audit (DEA) and meeting all functional tests.
Installation Activities a. SJE shall, at its sole cost and expense, be responsible for all installation activities (the “Installation Activities”) required to support the operation of the Charging Stations and services therewith, including furnishing and installing all materials, equipment, and labor required for the installation of the Charging Stations. This includes but is not limited to all work related to the development of plans and documents for supplying power to the Charging Stations per SJE standards and all permitting requirements; the hiring and coordination of all vendors and contractors; the installation of electrical equipment, utility lines, hardware, and software; and site preparation, trenching, repaving, and landscaping. Following the installation, SJE shall activate and commission the Charging Stations. b. SJE may, at any time during the Term and in its discretion modify, including, without limitation, upgrade, replace, and/or remove all or a portion of the Charging Stations (collectively, “Modifications”), whether or not said items are considered fixtures and attachments to the Premises under applicable laws; provided, however, before any such Modifications, SJE shall provide at least sixty (60) days prior notice to the Grantor and, to be included in such notice, supporting documentation of the Charging Stations’ customer utilization justifying the need for any such Modifications. c. Before beginning any Installation Activities, SJE shall provide a copy of the construction schedule, Charging Stations specifications, and installation plans to the Grantor for its approval, which approval shall not be unreasonably delayed or withheld. No work shall begin until plans have been approved by all governmental authorities and all applicable permits and certifications have been obtained from all governmental authorities by SJE. d. With respect to its Installation Activities, SJE shall ensure that it or its designated contractor(s) or service providers perform Installation Activities only during times and days acceptable to the Grantor and in a manner so as not to unreasonably interfere with the Grantor’s business operations. e. Following the Installation Activities and any Modifications, SJE shall ensure that the Premises and any other portion of the Property shall be restored to a clean, safe, and orderly condition, to at least the same standard as other areas at the Property. Should any of the Premises and any other portion of the Property become damaged following th...
Installation Activities. 1. EVI shall retain all ownership rights in and of the Charging Stations.
AutoNDA by SimpleDocs
Installation Activities. Post-kW measurements will be sampled and measured once after retrofit and will be used for rest of the guarantee term. Light level will be quality checked annually throughout the guarantee term. Inspection results and JCI warranty commitments will be communicated to the Customer in writing to maximize warranty benefits. Warranty claim procedure will be the responsibility of the Customer with the assistance of JCI. Formulas, lighting Wattages and run hours in the Detailed Energy Audit (DEA) will be used to calculate the savings True RMS Watt Meter: ±3% of measurement range Light Meter: ±3% of measurement range
Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the unit ventilator refurbishment to see if they meet the specifications of the DEA in terms of quantity. Verify if they perform in accordance with the functional specifications in the contract and meeting all functional tests. ECM 11: Air Conditioning Compressor Controllers M&V Option: NEMVP-A (One Time) A digital camera will be used to document that a controller does not exist.
Installation Activities. A digital camera will primarily be used to document the pre-retrofit conditions. The existing condition of the boilers will be documented with pictures prior to removal. The existing combustion efficiency and existing and proposed losses below will be used in the calculations. Heating System Efficiency Xxxxxx High School Xxxxxx Middle School Primrose Elementary School Existing Heating Seasonal Combustion Efficiency (%) 75% 75% 75% Proposed Boiler Seasonal Combustion Efficiency (%) 85.0% 85.0% 85.5% Current Boiler Radiant Jacket Losses (%) 5.0% 5.0% 5.0% Proposed Boiler Radiant Jacket Losses (%) 3.0% 3.0% 3.0% Current Boiler Distribution Losses (%) 5.0% 5.0% 5.0% Proposed Boiler Distribution Losses (%) 2.0% 2.0% 3.0% Current Boiler Fuel-to-Heat Efficiency (%) 68% 68% 68% Proposed Boiler Fuel-to-Heat Efficiency (%) 81% 81% 80% Combustion analyzer will be used to measure combustion efficiency at low and high fire once each year during M&V services period. The post combustion efficiency will meet or exceed the above-mentioned proposed combustion efficiency as long as the customer maintains the boilers as per manufacturer specifications. A digital camera will be used to document the post-retrofit conditions.