Level Survey. a) The Contractor shall execute a 5 meter grid of levels over the whole Site prior to the commencement of the Works, and again on completion, and shall prepare and submit to the Director of Works two copies of the survey drawing. b) The Contractor shall satisfy himself that the existing ground levels as indicated in the Contract are correct. Should the Contractor wish to dispute any levels he shall submit to the Director of Works a schedule of the position of the levels considered to be in error and a set of revised levels. The existing ground relevant to the disputed levels shall not be disturbed before the Director of Works’ decision as to the correct levels is given. c) The Contractor shall establish a temporary benchmark: 1) On a permanent structure, which is structurally stable, within the vicinity of the Site. 2) With a steel pin set in mass concrete in a position unaffected by the Works. 3) The Contractor shall protect and maintain the temporary bench marks for the duration of the Contract.
Appears in 7 contracts
Samples: Standard Building Contract, Standard Building Contract, Standard Building Contract
Level Survey. a) The Contractor shall execute a 5 5-meter grid of levels over the whole Site prior to the commencement of the Works, and again on completion, and shall prepare and submit to the Director of Works two copies of the survey drawing.
b) The Contractor shall satisfy himself that the existing ground levels as indicated in the Contract are correct. Should the Contractor wish to dispute any levels he shall submit to the Director of Works a schedule of the position of the levels considered to be in error and a set of revised levels. The existing ground relevant to the disputed levels shall not be disturbed before the Director of Works’ decision as to the correct levels is given.
c) The Contractor shall establish a temporary benchmark:
1) On a permanent structure, which is structurally stable, within the vicinity of the Site.
2) With a steel pin set in mass concrete in a position unaffected by the Works.
3) The Contractor shall protect and maintain the temporary bench marks for the duration of the Contract.