Common use of Materials and Construction Methods Clause in Contracts

Materials and Construction Methods. Remove existing concrete aprons as directed by the Engineer. Construct concrete aprons in accordance with Section 840 of the Standard Specifications, the details shown in the Roadway Standard Drawings No. 840.1 8 and 840.27, and as directed by the Engineer.

Appears in 1 contract

Samples: Proposal Item Sheet

AutoNDA by SimpleDocs

Materials and Construction Methods. Remove existing concrete aprons as directed by the Engineer. Construct concrete aprons in accordance with Section 840 of the Standard Specifications, the details shown in the Roadway Standard Drawings No. 840.1 8 840.18 and 840.27, 840.27 and as directed by the Engineer.

Appears in 1 contract

Samples: Proposal Item Sheet

Materials and Construction Methods. Remove existing concrete aprons as directed by the Engineer. Construct concrete aprons in accordance with Section 840 of the Standard Specifications, the details shown in the Roadway Standard Drawings No. 840.1 8 840.18 and 840.27, and as directed by the Engineer.

Appears in 1 contract

Samples: Proposal Item Sheet

AutoNDA by SimpleDocs

Materials and Construction Methods. Remove existing concrete aprons as directed by the Engineer. Construct concrete aprons in accordance with Section 840 of the Standard Specifications, the details shown in the Roadway Standard Drawings No. 840.1 8 and 840.27Drawings, and as directed by the Engineer.

Appears in 1 contract

Samples: connect.ncdot.gov

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!