Mechanical. a. Calculate block heating, ventilation, and cooling loads including skin versus internal loading. b. Select a minimum of two (2) HVAC systems that appear compatible with loading conditions for subsequent life cycle costing. c. Show selected system on drawings as follows: (i) Single line drawing(s) of all mechanical equipment spaces, ductwork and pipe chases. (ii) Location and preliminary sizing of all major equipment and duct work in allocated spaces. (iii) Schematic piping. (iv) Temperature control zoning. d. Provide design criteria to include the intent base of design for the Project. e. Evaluate and confirm the load requirements of all equipment and systems, the impact of those on existing facilities, and the requirements to increase these loads to accommodate the increase.
Appears in 8 contracts
Samples: Architectural Services Agreement, Architectural Services Agreement, Architectural Services Agreement
Mechanical. a. Calculate block heating, ventilation, and cooling loads including skin versus internal loading.
b. Select a minimum of two (2) HVAC systems that appear compatible with loading conditions for subsequent life cycle costing.
c. Show selected system on drawings as follows:
(i) Single line drawing(s) of all mechanical equipment spaces, ductwork and pipe chases.
(ii) Location and preliminary sizing of all major equipment and duct work in allocated spaces.
(iii) Schematic piping.
(iv) Temperature control zoning.
d. Provide design criteria to include the intent base of design for the Projectprojects.
e. Evaluate and confirm the load requirements of all equipment and systems, the impact of those on existing facilities, and the requirements to increase these loads to accommodate the increase.
Appears in 2 contracts
Samples: Architectural Services Agreement, Architectural Services Agreement
Mechanical. a. Calculate block heating, ventilation, and cooling loads including skin versus internal loading.loading.
b. Select a minimum of two (2) HVAC systems that appear compatible with loading conditions for subsequent life cycle costing.costing.
c. Show selected system on drawings as follows:follows:
(i) Single line drawing(s) of all mechanical equipment spaces, ductwork and pipe chases.chases.
(ii) Location and preliminary sizing of all major equipment and duct work in allocated spaces.spaces.
(iii) Schematic piping.
(iv) Temperature control zoning.
d. Provide design criteria to include the intent base of design for the Project.projects.
e. Evaluate and confirm the load requirements of all equipment and systems, the impact of those on existing facilities, and the requirements to increase these loads to accommodate the increase.increase.
Appears in 1 contract
Samples: Architectural Services Agreement
Mechanical. a. Calculate block heating, ventilation, and cooling loads including skin versus internal loading.
b. Select a minimum of two (2) HVAC systems that appear compatible with loading conditions for subsequent life cycle costing.
c. Show selected system systems on drawings as follows:
(i) Single line drawing(s) of all mechanical equipment spaces, ductwork and pipe chases.
(ii) Location and preliminary sizing of all major equipment and duct work in allocated spaces.
(iii) Schematic piping.
(iv) Temperature control zoning.
d. Provide design criteria to include the intent base of design for the each Project.
e. Evaluate and confirm the load requirements of all equipment and systems, the impact of those on existing facilities, and the requirements to increase these loads to accommodate the increase.
Appears in 1 contract