New Receipt Point or Delivery Point Sample Clauses

New Receipt Point or Delivery Point. (a) Subject to clauses 26.1(b) through 26.1(d), User may add a new receipt point or a new delivery point to the existing Receipt Points or existing Delivery Points (each a New Receipt Point or a New Delivery Point as applicable) by making a written request to Service Provider, in which User provides: (i) a description of the New Receipt Point or New Delivery Point; and (ii) the date from which the addition or change is to occur (which must be at least 30 Days after the date on which the request is received by Service Provider),
AutoNDA by SimpleDocs

Related to New Receipt Point or Delivery Point

  • Delivery Point The delivery point is the point of delivery of the Power Product to the CAISO Controlled Grid (the “Delivery Point”). Seller shall provide and convey to Buyer the Power Product from the Generating Facility at the Delivery Point. Title to and risk of loss related to the Power Product transfer from Seller to Buyer at the Delivery Point.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5. 1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Interconnection Customer (1) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: None (2) In the event that, in accordance with the Interconnection Construction Service Agreement, Interconnection Customer has exercised the Option to Build, it is hereby permitted to build in accordance with and subject to the conditions and limitations set forth in that Section, the following portions of the Transmission Owner Interconnection Facilities which constitute or are part of the Customer Facility: None Ownership of the facilities built by Interconnection Customer pursuant to the Option to Build shall be as provided in the Interconnection Construction Service Agreement.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and Ymax, Ymax, at its own expense, shall: 2.4.1.1 provide its own facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA; and/or 2.4.1.2 obtain transport to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA (a) from a third party, or, (b) if Verizon offers such transport pursuant to this Agreement or an applicable Verizon Tariff, from Verizon. 2.4.2 Where the Parties use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and Ymax, Verizon, at its own expense, shall provide its own facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA. 2.4.3 Prior to establishing any Two-Way Interconnection Trunks, Ymax shall meet with Verizon to conduct a joint planning meeting (“Joint Planning Meeting”). At that Joint Planning Meeting, each Party shall provide to the other Party originating Centium Call Seconds (Hundred Call Seconds) information, and the Parties shall mutually agree on the appropriate initial number of End Office and Tandem Two-Way Interconnection Trunks and the interface specifications at the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA at which the Parties interconnect for the exchange of traffic. Where the Parties have agreed to convert existing One-Way Interconnection Trunks to Two-Way Interconnection Trunks, at the Joint Planning Meeting, the Parties shall also mutually agree on the conversion process and project intervals for conversion of such One- Way Interconnection Trunks to Two-Way Interconnection Trunks. 2.4.4 On a semi-annual basis, Ymax shall submit a good faith forecast to Verizon of the number of End Office and Tandem Two-Way Interconnection Trunks that Ymax anticipates Verizon will need to provide during the ensuing two (2) year period for the exchange of traffic between Ymax and Verizon. Ymax’s trunk forecasts shall conform to the Verizon CLEC trunk forecasting guidelines as in effect at that time. 2.4.5 The Parties shall meet (telephonically or in person) from time to time, as needed, to review data on End Office and Tandem Two-Way Interconnection Trunks to determine the need for new trunk groups and to plan any necessary changes in the number of Two-Way Interconnection Trunks. 2.4.6 Two-Way Interconnection Trunks shall have SS7 Common Channel Signaling. The Parties agree to utilize B8ZS and Extended Super Frame (ESF) DS1 facilities, where available. 2.4.7 With respect to End Office Two-Way Interconnection Trunks, both Parties shall use an economic Centium Call Seconds (Hundred Call Seconds) equal to five (5). Either Party may disconnect End Office Two-Way Interconnection Trunks that, based on reasonable engineering criteria and capacity constraints, are not warranted by the actual traffic volume experienced. 2.4.8 Two-Way Interconnection Trunk groups that connect to a Verizon access Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.005 during the average time consistent busy hour. Two-Way Interconnection Trunk groups that connect to a Verizon local Tandem shall be engineered using a design blocking objective of Xxxx- Xxxxxxxxx B.01 during the average time consistent busy hour. Verizon and Xxxx shall engineer Two-Way Interconnection Trunks using BOC Notes on the LEC Networks SR-TSV-002275. 2.4.9 The performance standard for final Two-Way Interconnection Trunk groups shall be that no such Interconnection Trunk group will exceed its design blocking objective (B.005 or B.01, as applicable) for three (3) consecutive calendar traffic study months. 2.4.10 Ymax shall determine and order the number of Two-Way Interconnection Trunks that are required to meet the applicable design blocking objective for all traffic carried on each Two-Way Interconnection Trunk group. Ymax shall order Two-Way Interconnection Trunks by submitting ASRs to Verizon setting forth the number of Two-Way Interconnection Trunks to be installed and the requested installation dates within Verizon’s effective standard intervals or negotiated intervals, as appropriate. Ymax shall complete ASRs in accordance with OBF Guidelines as in effect from time to time. 2.4.11 Verizon may (but shall not be obligated to) monitor Two-Way Interconnection Trunk groups using service results for the applicable design blocking objective. If Verizon observes blocking in excess of the applicable design objective on any Tandem Two-Way Interconnection Trunk group and Ymax has not notified Verizon that it has corrected such blocking, Verizon may submit to Ymax a Trunk Group Service Request directing Ymax to remedy the blocking. Upon receipt of a Trunk Group Service Request, Ymax will complete an ASR to establish or augment the End Office Two-Way Interconnection Trunk group(s), or, if mutually agreed, to augment the Tandem Two-Way Interconnection Trunk group with excessive blocking and submit the ASR to Verizon within five (5) Business Days. 2.4.12 The Parties will review all Tandem Two-Way Interconnection Trunk groups that reach a utilization level of seventy percent (70%), or greater, to determine whether those groups should be augmented. Ymax will promptly augment all Tandem Two-Way Interconnection Trunk groups that reach a utilization level of eighty percent (80%) by submitting ASRs for additional trunks sufficient to attain a utilization level of approximately seventy percent (70%), unless the Parties agree that additional trunking is not required. For each Tandem Two-Way Interconnection Trunk group with a utilization level of less than sixty percent (60%), unless the Parties agree otherwise, Ymax will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for each respective group, unless the Parties agree that the Two-Way Interconnection Trunks should not be disconnected. In the event Ymax fails to submit an ASR for Two-Way Interconnection Trunks in conformance with this Section, Verizon may disconnect the excess Interconnection Trunks or bill (and Ymax shall pay) for the excess Interconnection Trunks at the applicable Verizon rates. 2.4.13 Because Verizon will not be in control of when and how many Two- Way Interconnection Trunks are established between its network and Ymax’s network, Verizon’s performance in connection with these Two- Way Interconnection Trunk groups shall not be subject to any performance measurements and remedies under this Agreement, and, except as otherwise required by Applicable Law, under any FCC or Commission approved carrier-to-carrier performance assurance guidelines or plan. 2.4.14 Ymax will route its traffic to Verizon over the End Office and Tandem Two-Way Interconnection Trunks in accordance with SR-TAP-000191, including but not limited to those standards requiring that a call from Ymax to a Verizon End Office will first be routed to the End Office Interconnection Trunk group between Ymax and the Verizon End Office.

  • DELIVERY: FOB DESTINATION, INSIDE DELIVERY, FREIGHT PAID Whenever possible, contractors should give the ordering entities 3 working days prior notice of any deliveries and/or installations. Furniture contractors will not be responsible for the removal/moving of existing furnishings unless requested by the ordering entity. Contractors should verify site readiness prior to delivery. All deliveries will be made during normal working hours unless otherwise arranged with the ordering entity. Contractor will communicate any scheduling delays and/or changes immediately. Agencies will not be responsible for any freight damage, concealed or otherwise.

  • Contract Quantity The Contract Quantity during each Contract Year is the amount set forth in the applicable Contract Year in Section D of the Cover Sheet (“Delivery Term Contract Quantity Schedule”), which amount is inclusive of outages.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 33.6

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct.