Open Circuit Voltage Test Sample Clauses

Open Circuit Voltage Test. The open circuit voltage test provides a simple method to determine that a string is properly connected and that all strings are producing the appropriate level of voltage. This test should be done under stable sky conditions.
AutoNDA by SimpleDocs
Open Circuit Voltage Test. Purpose: Open Circuit Voltage Testing provides a simple method to determine that all strings are properly connected (module and string polarity) and that all PV modules are producing an appropriate voltage level. Scope: All strings Party: Contractor technical personnel Equipment/ Materials: rubber insulating gloves voltmeter with an accuracy of at least 1 percent of reading fuse puller infrared thermometer or thermocouple PV specification for Voc as a function of temperature jumper wire Conditions: This test should be conducted under full sun (>500 W-­‐m-­‐2) and stable sky conditions, generally between the hours of 10:00am and 2:00pm.
Open Circuit Voltage Test. 9 4.2 Substantial Completion 9 4.2.1 Transformer Commissioning: 9
Open Circuit Voltage Test. Demonstrate that all strings are properly connected and that all PV modules are producing an appropriate voltage level.
Open Circuit Voltage Test. The string Isc should meet the criteria defined below: The measured current should be within 5% of the expected Isc calculated using equation below: I = n ⋅ I ⋅ G ⋅ 0.95 sc,expected sc, REF G REF (1) where n = number of modules in parallel in test segment Isc, expected = expected short-circuit current of the test segment, A Isc, REF = module short-circuit current at some specified reference conditions, A G = measured plane of array irradiance, X-x-2 GREF = irradiance at some specified reference conditions, X-x-2 0.95 = factor to account for soiling, misalignment, and other factors. All I-V curves should be similar in shape (other than differences due to changes in irradiance or temperature). This test will not be required if normal light conditions are not available during the Acceptance Test Period. Comments: If results show anomalies, including fill factor, voltages, or currents outside expected limits or humps on the curve, then investigate for bypass diode conduction, out-of-tolerance module performance, or other possible problems. Rectify any flaws and re-test.

Related to Open Circuit Voltage Test

  • Stability Testing Patheon may be requested to conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C to a Product Agreement. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within one Business Day, after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications, cGMPs, and Applicable Laws. Patheon will give Client ail stability test data and results at Client’s request.

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Equipment Failures In the event of equipment failures beyond the Administrator's control, the Administrator shall take reasonable and prompt steps to minimize service interruptions but shall have no liability with respect thereto. The Administrator shall develop and maintain a plan for recovery from equipment failures which may include contractual arrangements with appropriate parties making reasonable provision for emergency use of electronic data processing equipment to the extent appropriate equipment is available.

  • Remittance Processing Services In order to provide a means of collection of the Receivables which will allow the Trustee to receive the proceeds of the Receivables and related security without AmeriCredit or its Affiliates having access to the funds, the parties hereto agree for the benefit of the Trustee that the processing services (the “Service(s)”) of Processor will be used for the collection and the deposit of remittances related to the Receivables and related security.

  • Product Testing Upon request, Customer shall provide Operator a laboratory report for each Product delivery by Customer or Customer’s supplier. Operator will not be obligated to receive Contaminated Product for throughput across the Berths, nor will Operator be obligated to accept Product that fails to meet the quality specifications set forth in the arrival notice.

  • Monitoring System In each case in which the Custodian has exercised delegated authority to place Assets with a Foreign Custodian, the Custodian shall establish a system, to re-assess or re-evaluate selected Foreign Custodians, at least annually in accordance with Rule 17f-5(c)(3).

  • Supplier Selection If Customer selects a seat or galley supplier that is not on the Boeing recommended list, such seat or galley will become BFE and the provisions of Exhibit A, Buyer Furnished Equipment Provisions Document, of the AGTA will apply.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.