Phase I Designs and Drawings Clause Samples

Phase I Designs and Drawings. (i) The Concessionaire shall prepare the Basic Engineering Designs in accordance with the Technical Specifications, Applicable Laws and Applicable Permits. If the Concessionaire proposes to set up the Power Plant, the Concessionaire shall also submit the Basic Engineering Designs for the Power Plant. The Basic Engineering Designs shall be drawn to scale, with accurate dimensions, to minimize construction delays, disputes and cost overruns and to ensure smooth construction of the Facilities. The Facilities should be designed in a manner such that the Concessionaire can obtain a consent to operate from the Uttarakhand Environment Protection and Pollution Control Board for the operation of the Facilities. The Basic Engineering Designs should also specify the Proposed Technology for the Jagjeetpur STP and the Sarai STP. (ii) Within 30 days from the Appointed Date, the Concessionaire shall submit 4 hard copies and 1 soft copy on a compact disc of the draft Basic Engineering Designs to the Jal ▇▇▇▇▇ for its review and approval. (iii) The Jal ▇▇▇▇▇ shall forward the Basic Engineering Designs to the Project Engineer and the Indian Institute of Technology (IIT) for their review and comments. (iv) The Jal ▇▇▇▇▇ shall provide comments if any, on the draft Basic Engineering Designs (including any comments from IIT and the Project Engineer) to the Concessionaire or notify the Concessionaire of its approval of the draft Basic Engineering Designs within 20 days from the date of receipt of the draft Basic Engineering Designs. The Jal ▇▇▇▇▇ may require the Concessionaire to amend or modify the draft Basic Engineering Designs if the Jal ▇▇▇▇▇, IIT or the Project Engineer identifies any deficiencies, inaccuracies or shortcomings in the draft Basic Engineering Designs. If the Concessionaire receives any comments, suggestions or instructions to modify the draft Basic Engineering Designs from the Jal ▇▇▇▇▇, then the Concessionaire shall modify the draft Basic Engineering Designs to correct any such shortcomings, inaccuracies or deficiencies and/or address, in writing, the Jal Nigam's/IIT's/the Project Engineer's comments on the draft Basic Engineering Designs and submit the revised Basic Engineering Designs to the Jal ▇▇▇▇▇ for its approval within 10 days of receipt of comments. The process set out in this Clause 7.2(a)(iv) shall continue until the Basic Engineering Designs are certified by IIT and are approved by the Jal ▇▇▇▇▇ in accordance with this Clause 7.2(a)(iv). (v) Wit...
Phase I Designs and Drawings