Pipe Insulation Sample Clauses

Pipe Insulation. All insulated lines and their supports will be inspected and their condition documented.
AutoNDA by SimpleDocs
Pipe Insulation. .1 Non-Flammable Hot/Cold Liquids (Domestic Hot/Cold/Recirculation Water Piping, Geothermal Heat Pump System Glycol and Water Piping, Steam, Steam Condensate, Storm, HVAC indoor unit Condensate Piping):
Pipe Insulation. 1 Pipe Insulation Thickness Requirements: Insulation Type Pipe Size Runouts* ≤50 mm (2”) ≤ 25 mm (1”) ≤ 50 mm (2”) ≤ 100 mm (4”) ≥125 mm (5”) Domestic Cold Water 25 mm (1”) 25 mm (1”) 25 mm (1”) 25 mm (1”) 38 mm (1- 1/2”) Domestic Hot & Recirc. Water (Conditioned Space) 25 mm (1”) 25 mm (1”) 25 mm (1”) 38 mm (1-1/2”) 38 mm (1- 1/2”) Domestic Hot & Recirc. Water (Unconditioned Space, Outside) 38 mm (1- 1/2”) 63 mm (2- 1/2”) 63 mm (2- 1/2”) 75 mm (3”) 88 mm (3- 1/2”) Heating Systems (Fluids ≤ 93 °C) 25 mm (1”) 38 mm (1- 1/2”) 50 mm (2”) 50 mm (2”) 50 mm (2”) Heating Systems (District Heat, LP Steam, Condensate, Fluids ≤ 121 °C) 38 mm (1- 1/2”) 63 mm (2- 1/2”) 63 mm (2- 1/2”) 75 mm (3”) 75 mm (3”) Heating Systems (HP Steam, Fluids ≤ 177 °C) 38 mm (1- 1/2”) 75 mm (3”) 100 mm (4”) 113 mm (4-1/2”) 113 mm (4-1/2”) Heating Systems (HP Steam, Fluids ≥ 177 °C) 38 mm (1- 1/2”) 113 mm (4-1/2”) 125 mm (5”) 125 mm (5”) 125 mm (5”) Cooling Systems (Fluids ≥ 4 °C) 25 mm (1”) 25 mm (1”) 25 mm (1”) 25 mm (1”) 25 mm (1”) Storm Drainage, Cooling Systems (Fluids < 4 °C) 25 mm (1”) 25 mm (1”) 38 mm (1- 1/2”) 38 mm (1- 1/2”) 38 mm (1- 1/2”) .2 Insulation shall not be applied until all the required tests have been completed.
Pipe Insulation. D. In general, the system shall be installed complete through the terminus of VAV boxes within the base building, with run-outs to be provided under tenant buildout.

Related to Pipe Insulation

  • GLASS The Tenant shall maintain the glass part of the demised premises, promptly replacing any breakage and fully saving the Landlord harmless from any loss, cost or damage resulting from such breakage or the replacement thereof.

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Asbestos Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration.

  • Electrical Provide drawings for the following systems:

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Sprinklers Subject to any terms, conditions and limitations set forth herein, Landlord shall provide an operative sprinkler system consisting of mains, laterals, and heads “AS IS” on the date of delivery of the Premises to Tenant. Tenant shall pay for piping distribution, drops and relocation of, or additional, sprinkler system heads and Building firehose or firehose valve cabinets, if Tenant’s Plans and/or any applicable Laws necessitate such.

  • Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.

  • Waste Borrower shall not commit or suffer any waste of the Property or make any change in the use of the Property which will in any way materially increase the risk of fire or other hazard arising out of the operation of the Property, or take any action that might invalidate or give cause for cancellation of any Policy, or do or permit to be done thereon anything that may in any way impair the value of the Property or the security of this Security Instrument. Borrower will not, without the prior written consent of Lender, permit any drilling or exploration for or extraction, removal, or production of any minerals from the surface or the subsurface of the Land, regardless of the depth thereof or the method of mining or extraction thereof.

  • HEATING The Hirer shall ensure that no unauthorised heating appliances shall be used on the premises when open to the public without the consent of the management committee. Portable Liquefied Propane Gas (LPG) heating appliances shall not be used.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!