Point of Connection Sample Clauses

Point of Connection. The MHVDC Transmission Line will connect with the Transmission System at the Point of Connection identified in Appendix A. Any additional Point of Connection or any deletion of a Point of Connection shall be added to or removed from this Agreement by written amendment to this Agreement signed by all Parties. The appropriate geographical reference, a description of the facilities and any applicable special terms and conditions shall be stated in the Point of Connection description in the respective amendment.
AutoNDA by SimpleDocs
Point of Connection. Is the point where the Load or Generator is electrically and physically connected to the Transmission Owner’s electricity network.
Point of Connection. The Point of Connection will be at the end of the CITY’s service area, along State Road A-1-A near the most northerly bridge to Island Estates as depicted on Exhibit A attached hereto. This is in the same general vicinity as the existing water service point of connection. CITY will provide wastewater service at the Point of Connection by constructing the first phase of the Beachside Sewer System. Phase 1 of the Beachside Sewer System consists of that portion of the force main system along State Road A-1-A from the most northerly bridge to Island Estates to the proposed Master Pump Station, construction of the Master Pump Station, and construction of the force main from the Master Pump Station to the Palm Coast Wastewater Treatment Plant. This system will be constructed, owned, and operated by CITY. COUNTY will construct the necessary infrastructure to pump wastewater from the Xxxxxxx Beach System to the point of connection with enough Hydraulic Head to pump to the new Palm Coast Master Pump Station. This infrastructure will include pumping facilities in Xxxxxxx Beach and the force main along State Road A-1-A from Xxxxxxx Beach to the Point of Connection. This portion of the system will be constructed, owned, and operated by COUNTY. Hydraulic Head calculations and design of COUNTY’s System as described herein shall consider the impact of future connections including those future connections in the service area between the Master Pump Station and the most northerly bridge to Island Estates (as depicted on Exhibit A).
Point of Connection. 1. The Buyer shall provide connections for the natural gas feedstock and other utilities at a point designated by the Seller on the Seller’s Plant Site.
Point of Connection. 3.1 K’ómoks First Nation must construct at its sole cost, in accordance with Regional District Specifications, any works required for the purpose of connecting the KFN Sewer System to the Comox Valley Sewerage System, whether such works are required to be constructed on or off the K’ómoks South Lands.
Point of Connection. Aggregated capacity service measures for all Connection Assets associated with the Point of Connection Service measure Service level Aggregated overall continuous capacity rating of Connection Assets at the Point of Connection At least [ ] Amps and [ ] MVA Aggregated defined short term capacity rating of all Connection Assets at the Point of Connection At least [ ] Amps and [ ] for [ ] minutes/hours or part thereof Aggregated level of impedance of all Connection Assets at the Point of Connection [ ] Ohms Aggregated current rating of all Connection Assets at the Point of Connection [ ] Amps Aggregated nominal high voltage rating of all Connection Assets at the Point of Connection [ ] Volts Aggregated voltage range that Connection Assets at the Point of Connection can operate over Maximum: [ ] kV Minimum: [ ] kV
Point of Connection. The point of connection between the City’s System and the District’s System shall be at the City’s manhole labeled EQ121 and further depicted in Exhibit “C” and shall not be changed without prior written approval of the Director.
AutoNDA by SimpleDocs
Point of Connection. Subject to Clause 4.2, Electricity North West is responsible for determining the Point of Connection and this determination shall be Non-Contestable Works. In the event that the ICP determines the Point of Connection this determination shall be deemed to be Contestable Works and: it warrants and represents that it has complied, and that it shall comply, with the Self-Determined PoC Guide; it accepts full responsibility for determining the Point of Connection; and it shall determine the Point of Connection in accordance with Good Industry Practice. Design for all Contestable Works The ICP accepts full responsibility for any Contestable Design that it undertakes. The ICP shall act in accordance with Good Industry Practice in the undertaking of the Contestable Design, including by undertaking the Contestable Design in such a manner as is to be expected of a professionally qualified and competent contractor experienced in the design of works of a similar nature, value, complexity and timescale to the Contestable Works. The Contestable Design shall meet the Maximum Power and such other requirements as may be required by the Customer. Unless Clause 4.7 applies: the ICP shall submit its Contestable Design to Electricity North West for approval; Electricity North West shall give either its approval to the Contestable Design or a reasoned rejection of it to the ICP within a reasonable period of time; and the ICP shall not vary the Contestable Design in any way without having first obtained the written approval of Electricity North West, such approval not to be unreasonably withheld or delayed. Save where the need for a variation arises as a direct result of a Distribution System Enhancement requested by Electricity North West pursuant to Clause 5, Electricity North West may make a reasonable charge, and the ICP will pay to Electricity North West, for approval of any variation to the Contestable Design, the amount of any such charge as set out in the relevant Schedule of Work. In the event that the ICP wishes to approve its own Contestable Design, the ICP warrants and represents that it has complied, and that it shall comply, with the Self-Approval Design Guide. No action taken by Electricity North West pursuant to the Self-Approval Design Guide shall relieve the ICP of any liability for the Contestable Works or and Contestable Design that is approved by the ICP pursuant to this Clause 4.7 and the Self-Approval Design Guide. No approval, review or comment, or failur...

Related to Point of Connection

  • Interconnection 2.2.10 Startup Testing and Commissioning

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Maintenance and Repair (a) Except for any Alterations that Tenant is permitted to make pursuant to this Lease, Tenant shall at all times put, keep and maintain the Leased Premises (including, without limitation, the roof, landscaping, walls, footings, foundations and structural components of the Leased Premises) in the same (or better) condition and order of repair as exists as of the Commencement Date, except for ordinary wear and tear, and shall promptly make all repairs and replacements of every kind and nature, whether foreseen or unforeseen, which may be required to be made upon or in connection with the Leased Premises in order to keep and maintain the Leased Premises in the order and condition required by this Paragraph 11(a). Tenant shall do or cause others to do all shoring of the Leased Premises or of foundations and walls of the Improvements and every other act necessary or appropriate for preservation and safety thereof, by reason of or in connection with any excavation or other building operation upon any of the Leased Premises, whether or not Landlord shall, by reason of any Legal Requirements or Insurance Requirements, be required to take such action or be liable for failure to do so. LANDLORD SHALL NOT BE REQUIRED TO MAKE ANY REPAIR, WHETHER FORESEEN OR UNFORESEEN, OR TO MAINTAIN ANY OF THE LEASED PREMISES IN ANY WAY, AND TENANT HEREBY EXPRESSLY WAIVES THE RIGHT TO MAKE REPAIRS AT THE EXPENSE OF THE LANDLORD, WHICH RIGHT MAY BE PROVIDED FOR IN ANY LAW NOW OR HEREAFTER IN EFFECT. Nothing in the preceding sentence shall be deemed to preclude Tenant from being entitled to insurance proceeds or condemnation awards for Restoration pursuant to Paragraphs 13(c) and 14(g). Tenant shall, in all events, make all repairs for which it is responsible hereunder promptly (but in any event shall commence actions to initiate such repairs as quickly as possible after the date Tenant becomes aware that such repairs are necessary, or, in the event of a Restoration pursuant to Paragraph 13(c) or 14(g), within sixty (60) days of the date insurance proceeds or a condemnation award has been paid to the Trustee (it being understood that Tenant shall take such steps as are reasonably necessary to protect and preserve the integrity and safety of the Leased Premises pending such payment) and shall diligently pursue such repairs to completion), and all repairs shall be made in a good, proper and workmanlike manner.

  • Electrical Service Electrical service for new construction or a renovated existing building shall be 480/277-volt, 3-phase, 4-wire or approved equal. Service shall be sized for HVAC and other mechanical system(s) loads, lighting, general building services, and dedicated computer based office equipment loads. 5 xxxxx per square foot shall be provided for lighting and general service receptacles. Size of neutral conductor of 3- phase circuits shall be twice that of phase conductor to accommodate potential harmonic currents associated with computer system electronic power supplies and fluorescent lighting fixtures electronic ballasts. An adequately sized 3 phase “wye” wound step down transformer shall be provided to supply 208/120-volt, 3 phase power, for lighting, general service receptacles and dedicated computer based office equipment. Dedicated, isolated ground circuits shall be supplied from separate isolated ground power distribution panel(s). Lighting circuits shall be supplied from separate lighting panel(s). Panels shall have 20% spare capacity and be complete with 10% spare breakers of each size, but no less than 1 spare. No more than 4 duplex receptacles shall be connected to any single 20-amp dedicated isolated ground circuit or general service circuit.