POWER CABLES PTE Sample Clauses

POWER CABLES PTE. LIMITED 1.1 Part B of Part 1 of Schedule 6 to the Agreement (which sets out those Jurisdictions in respect of which completion is to take place on a Subsequent Completion Date) includes the Jurisdiction of Singapore. There are two Group Companies which are incorporated in Singapore, namely Trans-Power Cables Pte Limited ("Trans-Power") and BICC Cables Asia Pacific Pte Limited ("BCAP"). Part 2 of Schedule 5 to the Agreement provides (inter alia) that completion of the acquisition of Trans-Power and BCAP is conditional upon the receipt by the Purchaser of a waiver in respect of the right of termination under the joint venture agreement in respect of PT BICC Berca Cables Limited.
AutoNDA by SimpleDocs

Related to POWER CABLES PTE

  • Power Supply The source of power for the VAS shall either be the vehicle battery or a rechargeable battery. Where provided, an additional rechargeable or non-rechargeable battery may be used. These batteries shall by no means supply energy to other parts of the vehicle electrical system.

  • Electrical Power Corporation shall provide Contractor with convenient access to electrical power required to perform the work. The electrical outlets used by Contractor shall be those designated or approved by Corporation.

  • Single Point of Contact The Contractor must provide, at the request of the Authorized User, a Single Point of Contact (SPOC) regardless of the breadth of the services being provided. The Contractor is required to provide the name and contact telephone numbers (desk, cell phone etc.) of the SPOC. The Authorized User may retain a percentage of each deliverable payment of no more than twenty-five (25) percent until the acceptance of the complete Implementation. This retainage may be reduced up to 5 percent as described in the SOW, when the Contractor substantially reduces the time required from the timeframes negotiated between the Authorized User and the Contractor. When the right is reserved in the RFQ, unanticipated enhancements to the services procured not exceeding a cumulative twenty (20) percent of the Implementation Service cost may be agreed to by the Authorized User. Such inclusion must be included in the Total Cost Evaluation. Such unanticipated enhancements will require a written Authorized User Agreement revision, which for NYS Agency Authorized Users will include an amended Purchase Order. Any changes that will result in exceeding this twenty (20) percent will require a new competitive RFQ. Contractor shall notify the Authorized User in writing when a requested scope change will exceed the cumulative twenty (20) percent total value of the Implementation Services.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 33.6

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Onvoy to Frontier, Onvoy, at Xxxxx’s own expense, shall: 2.3.1.1 provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA; and/or 2.3.1.2 obtain transport for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA (a) from a third party, or, (b) if Frontier offers such transport pursuant to a Frontier access Tariff, from Frontier. 2.3.2 For each Tandem or End Office One-Way Interconnection Trunk group for delivery of traffic from Onvoy to Frontier with a utilization level of less than sixty percent (60%) for final trunk groups and eighty-five percent (85%) for high usage trunk groups, unless the Parties agree otherwise, Onvoy will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for all final trunk groups and eighty-five percent (85%) for all high usage trunk groups. In the event Onvoy fails to submit an ASR to disconnect One-Way Interconnection Trunks as required by this Section, Frontier may disconnect the excess Interconnection Trunks or bill (and Onvoy shall pay) for the excess Interconnection Trunks at the rates set forth in the Pricing Attachment. 2.3.3 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Frontier to Onvoy, Frontier, at Frontier’s own expense, shall provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA.

  • Network Management 60.1 CLEC and CenturyLink will exchange appropriate information (e.g., network information, maintenance contact numbers, escalation procedures, and information required to comply with requirements of law enforcement and national security agencies) for network management purposes. In addition, the Parties will apply sound network management principles to alleviate or to prevent traffic congestion and to minimize fraud associated with third number billed calls, calling card calls, and other services related to this Agreement. 60.2 The Parties will employ characteristics and methods of operation that will not interfere with or impair the Parties’ networks, or the network of any third parties or Affiliated companies, connected with or involved directly in the network or facilities of CenturyLink. 60.3 CLEC shall not interfere with or impair service over any circuits, facilities or equipment of CenturyLink, its Affiliated companies, or its connecting and concurring carriers. 60.4 If CLEC causes any impairment or interference, CenturyLink shall promptly notify CLEC of the nature and location of the problem and that, unless promptly rectified, a temporary discontinuance of the use of any circuit, facility or equipment may be required. The Parties agree to work together to attempt to promptly resolve the impairment or interference. If CLEC is unable to promptly remedy, then CenturyLink may, at its option, temporarily discontinue the use of the affected circuit, facility or equipment until the impairment is remedied. 60.5 Any violation of Applicable Law or regulation regarding the invasion of privacy of any communications carried over CenturyLink’s facilities, or that creates hazards to the employees of CenturyLink or to the public, is also considered an impairment of service. 60.6 CenturyLink shall give advanced notice to CLEC of all non-scheduled maintenance or other planned network activities to be performed by CenturyLink on any Network Element, including any hardware, equipment, software, or system, providing service functionality of which CLEC has advised CenturyLink may potentially impact CLEC End Users. 60.7 The Parties shall provide notice of network changes and upgrades in accordance with 47 C.F.R. §§51.325 through 51.335. CenturyLink may discontinue any Interconnection arrangement, Telecommunications Service, or Network Element provided or required hereunder due to network changes or upgrades after providing CLEC notice as required by this Section. CenturyLink agrees to cooperate with CLEC and/or the appropriate regulatory body in any transition resulting from such discontinuation of service and to minimize the impact to customers which may result from such discontinuance of service.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and PCS, PCS shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs. 2.4.2 Prior to ordering any Two-Way Interconnection Trunks from Verizon, PCS shall meet with Verizon to conduct a joint planning meeting (“Joint Planning Meeting”). At that Joint Planning Meeting, each Party shall provide to the other Party originating Centium Call Second (Hundred Call Second) information, and the Parties shall mutually agree on the appropriate initial number of Two-Way End Office and Tandem Interconnection Trunks and the interface specifications at the Point of Interconnection (POI). Where the Parties have agreed to convert existing One-Way Interconnection Trunks to Two-Way Interconnection Trunks, at the Joint Planning Meeting, the Parties shall also mutually agree on the conversion process and project intervals for conversion of such One-Way Interconnection Trunks to Two-Way Interconnection Trunks. 2.4.3 Two-Way Interconnection Trunks shall be from a Verizon End Office or Tandem to a mutually agreed upon POI. 2.4.4 On a semi-annual basis, PCS shall submit a good faith forecast to Verizon of the number of End Office and Tandem Two-Way Interconnection Trunks that PCS anticipates Verizon will need to provide during the ensuing two (2) year period to carry traffic from PCS to Verizon and from Verizon to PCS. PCS’s trunk forecasts shall conform to the Verizon CLEC trunk forecasting guidelines as in effect at that time. 2.4.5 The Parties shall meet (telephonically or in person) from time to time, as needed, to review data on End Office and Tandem Two-Way Interconnection Trunks to determine the need for new trunk groups and to plan any necessary changes in the number of Two-Way Interconnection Trunks. 2.4.6 Two-Way Interconnection Trunks shall have SS7 Common Channel Signaling. The Parties agree to utilize B8ZS and Extended Super Frame (ESF) DS1 facilities, where available. 2.4.7 With respect to End Office Two-Way Interconnection Trunks, both Parties shall use an economic Centium Call Second (Hundred Call Second) equal to five (5). 2.4.8 Two-Way Interconnection Trunk groups that connect to a Verizon access Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.005 during the average time consistent busy hour. Two-Way Interconnection Trunk groups that connect to a Verizon local Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.01 during the average time consistent busy hour. Verizon and PCS shall engineer Two-Way Interconnection Trunks using BOC Notes on the LEC Networks SR-TSV-002275. 2.4.9 The performance standard for final Two-Way Interconnection Trunk groups shall be that no such Interconnection Trunk group will exceed its design blocking objective (B.005 or B.01, as applicable) for three

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!