Product Engineering Clause Samples

The Product Engineering clause defines the responsibilities and processes related to the design, development, and refinement of a product. It typically outlines the standards, timelines, and collaboration requirements between parties involved in engineering tasks, such as prototyping, testing, and implementing product improvements. By clearly assigning duties and expectations, this clause ensures that product development proceeds efficiently and meets agreed-upon specifications, thereby reducing misunderstandings and facilitating successful project outcomes.
Product Engineering. DRA shall provide product engineering and ------------------- production control support for LDO Products and HDO Branded Products at DRA's expense.
Product Engineering. 1. Characterize the performance of the embedded FRAM (registered trademark) macro, exploiting the ** . Identify sources of operational marginality and propose countermeasures for incorporation into future devices ** .
Product Engineering. This element includes all effort of technical activities associated with the production and manufacturing of the system. This includes analysis of design and production operations, application of manufacturing methods and tooling in support of producing the system.
Product Engineering. The goal of this task is to optimize the Reflex Vanadium Redox Flow Battery for 10-hour discharge operations and to design a weatherization package for outdoor-siting. • Design outdoor the Reflex Vanadium Redox Flow Battery module package • Test and validate the Reflex Vanadium Redox Flow Battery module for outdoor use • Develop variable speed pump optimization for 10-hour discharge • Test and validate variable speed pumping • Prepare a Product Engineering Report including, but not limited to: o Decision logic on including specific features from a design perspective o Test results from the weather resistant upgrades on the Reflex Vanadium Redox Flow Battery o Pump optimization test results. • Revise the factory acceptance testing as required to reflect any specification changes • After the Reflex Vanadium Redox Flow Battery modules have been manufactured and tested in the factory, write a Factory Acceptance Test Report including: o Results of the factory acceptance test for each of the planned number of Reflex Vanadium Redox Flow Battery modules as approved in writing by the CAM. o Lessons learned from manufacturing • Submit a CPR Report #1 and participate in a CPR Meeting per subtask 1.3 • Product Engineering Report • Factory Acceptance Test Report • CPR Report #1 The goal of this task is to install the Reflex Vanadium Redox Flow Battery based Energy Storage System at the pre-selected CAM approved demonstration site. • Complete all civil works such as site alteration, clearing, grading, concrete pads (if necessary), underground conduit, etc. • Complete the mechanical installation of the ESS per the design and local codes • Complete the electrical connections as defined in the electrical design and per local codes • Provide Photos of the Installed Energy Storage System • Complete Final Site Acceptance Test and Commissioning Report (description above) o Lessons learned from the testing and commissioning process o Details the findings according to the guidelines detailed in the Site Acceptance Test and Commissioning Plan in Task 3 • Submit a CPR Report #2 and participate in a CPR Meeting per subtask 1.3 • Photos of Installed Energy Storage System • Site Acceptance Test and Commissioning Report • CPR Report #2 The goal of this task is to perform testing of the Reflex Vanadium Redox Flow Battery based Energy Storage System at the demonstration site for at least 1 year to assess system performance to meet site operational needs. • With consultation from the TAC...
Product Engineering. The term “Product Engineering” means any research, development and engineering conducted by ExcelStor, whether or not at the request of Satcon, to substantially improve or modify the Production Design of any Product.
Product Engineering. The term “Product Engineering” means any research, development and engineering conducted by Perfect Galaxy, whether or not at the request of Satcon, to substantially improve or modify the Production Design of any Product.
Product Engineering. (a) Satcon may request the Product Engineering services of ExcelStor by submitting to ExcelStor a Statement of Work for the development of a new Product or the modification of a Production Design. Within ten (10) Business Days of ExcelStor’s receipt of such Statement of Work, ExcelStor shall provide Satcon with a statement of NRE with detailed information on each component of the NRE for such Product Engineering services. Satcon shall notify ExcelStor whether it agrees to the amount of the NRE and the right, title and interest which it shall own in and to the results of such Product Engineering set forth in the Statement of Work. (b) Satcon shall have the right, title and interest in and to the tangible deliverable results of any Product Engineering upon payment for such Product Engineering; provided, that Satcon’s rights to any Intellectual Property Rights arising from such Product Engineering shall be in accordance with the terms and conditions set forth in Section 9.1 hereof, and Satcon shall not receive any Intellectual Property Rights in the ExcelStor Technology Rights including by way of illustration and not of limitation, ExcelStor’s manufacturing processes, background materials and intellectual property not related to or developed for Satcon. (c) Should Satcon request the Product Engineering services of ExcelStor, ExcelStor shall purchase from Satcon at Satcon’s cost the initial two (2) sets of components for PowerGate Plus Solar PV Inverters ranging from 30 kW to 135 kW power levels (“Final Qualification Unit(s)”). Upon completion of Product Engineering services relating to the Final Qualification Units, ExcelStor shall sell to Satcon the Final Qualification Units at the price at which ExcelStor purchased the Final Qualification Units from Satcon, plus a *** markup from the purchase price. Invoices relating to all Final Qualification Units shall be due and payable sixty (60) days after receipt of the invoices. Final Qualification Unit prices are FCA *** Represents text omitted pursuant to a request for confidential treatment. The omitted material has been filed separately with the Securities and Exchange Commission. (INCOTERMS 2000) ▇▇▇▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇, ▇▇▇▇▇▇, or FCA (INCOTERMS 2000) Hong Kong SAR, as the case may be.
Product Engineering. GM shall have responsibility for product -------------------- engineering related to the New Vehicle, including but not limited to testing, certification and compliance with applicable governmental regulations and shall be considered the Original Equipment Manufacturer of the New Vehicle.
Product Engineering. Contractor shall provide engineering design, assembly drawing, parts drawing, working sample, revised layouts and construction drawing pertaining to the Product.
Product Engineering. (a) Satcon may request the Product Engineering services of Perfect Galaxy by submitting to Perfect Galaxy a Statement of Work for the development of a new Product or the modification of a Production Design. Within fifteen (15) Business Days of Perfect Galaxy’s receipt of such Statement of Work, Perfect Galaxy shall provide Satcon with a statement of NRE with detailed information on each component of the NRE for such Product Engineering services. Satcon shall notify Perfect Galaxy whether it agrees to the amount of the NRE and the right, title and interest which it shall own in and to the results of such Product Engineering set forth in the Statement of Work within ten (10) Business Days of Satcon’s receipt of Perfect Galaxy’s NRE statement. (b) Satcon shall have the right, title and interest in and to the tangible deliverable results of any Product Engineering upon payment for such Product Engineering; provided, that Satcon’s rights to any Intellectual Property Rights arising from such Product Engineering shall be in accordance with the terms and conditions set forth in Section 9.1 hereof, and Satcon shall not receive any Intellectual Property Rights in the Perfect Galaxy Technology Rights including by way of illustration and not of limitation, Perfect Galaxy’s manufacturing processes, background materials and intellectual property not related to or developed for Satcon.