Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Escrow Format Specification Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.
Classification Review Grand Valley State University and APSS shall jointly determine the review assessment survey instrument to be used at Grand Valley State University. The parties shall maintain a Joint Review Committee, composed of three members appointed by the Human Resources Office and three members appointed by the Alliance. Bargaining unit members questioning the assigned classification of their position may do so by using the following procedure: A. Meet with the Employment Manager in the Human Resources Office to discuss the review process, changes in their job responsibilities, duties and any other process questions they may have. B. PSS member will fill out the assessment survey and email to the Employment Manager along with any other documentation that supports the request. The survey instrument will be jointly administered/reviewed by the Assessment Team (consisting of the Employment Manager and an Alliance member of the Joint Review Committee). A meeting with the PSS is scheduled for a verbal review of the documentation and to answer any questions the Assessment Team may have. The supervisor or appointing officer is encouraged to attend. If the Assessment Team believes a job site visit is warranted as a result of the survey information, they will schedule a time for a joint visit. C. The completed survey instrument shall be coded. The survey results, as determined by the Assessment Team, shall be shared with the survey participant. D. After receiving the survey results, the survey participant, if they so choose shall have the opportunity to meet with the Joint Review Committee for additional input and appeal. Any additional information shall be reviewed by the Committee, and where the Committee feels it is necessary, the survey will be recoded, in a manner mutually agreeable. E. The Joint Review Committee shall then deliberate as to the merit of the upgrade requested by the participant. If the Committee is not able to reach a consensus, the University will decide on the classification. The Alliance may appeal that decision through the arbitration procedure of the collective bargaining agreement. Professional Support Staff members may engage in the review process no more than once per year. Supervisors questioning the assigned classification of a staff member’s position shall provide supporting rationale, complete an assessment survey instrument and discuss with Manager of Employment. The Manager of Employment shall notify an Alliance Representative that a Supervisor is reviewing a staff member’s classification. The review and outcome shall be completed within 45 working days unless the Alliance Representative and Manager of Employment mutually agreed to an extension. The Alliance will be provided with the scored instrument and any supporting rationale.
Packaging Materials and Containers for Retail Sale 1. When packaging materials and containers in which a good is packaged for retail sales are classified in the Harmonized System with the good, they shall not be taken into account in determining whether all non-originating materials used in the production of the good undergo the applicable change in tariff classification set out in Annex 4.03. 2. When the good is subject to a requirement of regional value content, the value of these packaging materials and containers shall be taken into account as originating or non-originating materials, as the case may be, in calculating the regional value content of the good.
SAMPLE (If applicable and the project has specifications, insert the specifications into this section.)
Peer Review Dental Group, after consultation with the Joint ----------- Operations Committee, shall implement, regularly review, modify as necessary or appropriate and obtain the commitment of Providers to actively participate in peer review procedures for Providers. Dental Group shall assist Manager in the production of periodic reports describing the results of such procedures. Dental Group shall provide Manager with prompt notice of any information that raises a reasonable risk to the health and safety of Group Patients or Beneficiaries. In any event, after consultation with the Joint Operations Committee, Dental Group shall take such action as may be reasonably warranted under the facts and circumstances.
Claims Review Methodology a. C laims Review Population. A description of the Population subject to the Quarterly Claims Review.
Desirable Selection Criteria Post registration qualification in the area of specialty or evidence of significant progression towards one.
Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.