Response Time and Equipment Availability Sample Clauses

Response Time and Equipment Availability. Fry shall respond as follows within the following minimum response times: (1) Time to Discover; Inability to Access the Internet; Notification of Client. As soon as practicable, but within [****](during Key Time Periods and [****] during other times) of discovering the existence of an Internet Access Failure, Fry will determine whether the source of the an Internet Access Failure is limited to the Client Equipment and the Fry equipment connecting the Client Equipment to Xxx'x XXX ("Client Specific Failure"). If an Internet Access Failure is not a Client Specific Failure, Fry will determine the source of the Internet Access Failure as soon as practicable, but within [****] (during Key Time Periods, and [****] during other times) after determining that it is not a Client Specific Failure. In any event, Fry will notify Client of the source of an Internet Access Failure within [****] after identifying the source. (2) Remedy of Inability to Access the Internet. If an Internet Access Failure remedy is within the sole control of Fry, Fry will remedy an Internet Access Failure as soon as practicable, but within [****] (during Key Time Periods, and [****] during other times) of determining the source of an Internet Access Failure . If an Internet Access Failure is caused from outside of the Xxx XXX or WAN, Fry will notify Client and will use commercially reasonable efforts to promptly notify the party(ies) responsible for the source and cooperate with it(them) to resolve the problem as soon as possible.
AutoNDA by SimpleDocs

Related to Response Time and Equipment Availability

  • Contractor’s Equipment The Contractor shall be responsible for all Contractor’s Equipment. The Contractor’s Equipment shall be deemed to be exclusively intended for the execution of the Works.

  • Plant and Equipment The plants, structures and equipment of the Company are structurally sound with no known defects and are in good operating condition and repair and are adequate for the uses to which they are being put; and none of such plants, structures or equipment are in need of maintenance or repairs except for ordinary, routine maintenance and repairs which are not material in nature or cost. Except as set forth in Schedule 3.16, the Company has not received notification that it is in violation of any applicable building, zoning, anti-pollution, health or other law, ordinance or regulation in respect of its plants or structures or their operations and no such violation exists.

  • ESTIMATED / SPECIFIC QUANTITY CONTRACTS Estimated quantity contracts, also referred to as indefinite delivery / indefinite quantity contracts, are expressly agreed and understood to be made for only the quantities, if any, actually ordered during the Contract term. No guarantee of any quantity is implied or given. With respect to any specific quantity stated in the contract, the Commissioner reserves the right after award to order up to 20% more or less (rounded to the next highest whole number) than the specific quantities called for in the Contract. Notwithstanding the foregoing, the Commissioner may purchase greater or lesser percentages of Contract quantities should the Commissioner and Contractor so agree. Such agreement may include an equitable price adjustment.

  • Outage Repair Standard In the event of an outage or trouble in any Service being provided by a Party hereunder, the Providing Party will follow Verizon’s standard procedures for isolating and clearing the outage or trouble.

  • Cost of Repairs 54.1 Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date and the end of the Defects Correction periods shall be remedied by the Contractor at the Contractor's cost if the loss or damage arises from the Contractor's acts or omissions.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • REPAIRED OR REPLACED PARTS / COMPONENTS Where the Contractor is required to repair, replace or substitute Product or parts or components of the Product under the Contract, the repaired, replaced or substituted Products shall be subject to all terms and conditions for new parts and components set forth in the Contract including Warranties, as set forth in the Additional Warranties Clause herein. Replaced or repaired Product or parts and components of such Product shall be new and shall, if available, be replaced by the original manufacturer’s component or part. Remanufactured parts or components meeting new Product standards may be permitted by the Commissioner or Authorized User. Before installation, all proposed substitutes for the original manufacturer’s installed parts or components must be approved by the Authorized User. The part or component shall be equal to or of better quality than the original part or component being replaced.

  • Response Times Qubit bases its response times and the actions it takes to resolve problems on an assessment of the impact of the reported technical issue. The more serious the impact, the higher the assigned priority. For all support issues relating to Customer, Qubit will respond in accordance with Table 1: P1 1 hour 4 hours P2 1 hour 8 hours P3 4 hours 72 hours P4 1 business day Next or a later major release **The Priority Levels are defined in Section II(2) below.

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner. 2.1.2 The NYISO and Connecting Transmission Owner shall each provide the Interconnection Customer written acknowledgment that it has received the Interconnection Customer’s written test report. Such written acknowledgment shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by the NYISO or Connecting Transmission Owner of the safety, durability, suitability, or reliability of the Small Generating Facility or any associated control, protective, and safety devices owned or controlled by the Interconnection Customer or the quality of power produced by the Small Generating Facility.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!