SEQUENCE OF WORK Sample Clauses

The SEQUENCE OF WORK clause establishes the order in which various tasks or phases of a project must be performed. It typically outlines a schedule or specifies dependencies between activities, ensuring that certain steps are completed before others begin; for example, foundation work must be finished before structural framing starts. This clause helps coordinate workflow, prevent delays caused by out-of-sequence activities, and ensures that the project progresses efficiently and safely.
POPULAR SAMPLE Copied 3 times
SEQUENCE OF WORK. If required by the special provisions, the Contractor shall start construction operations on that part of the project designated by the Public Works Director.
SEQUENCE OF WORK. All processes will be described fully in scientific notebooks and Implementation Procedures. Special skills (such as instrument operation) will be identified as appropriate and incorporated into IPs and instrumentation operation checklists. An outline of the work sequence is as follows.
SEQUENCE OF WORK. 13.9.1 A schedule of the Contractor's work shall be submitted to the City for approval as required under Article V of the Agreement. It shall contain a listing of the order in which the Contract items will be constructed and the approximate dates for starting and finishing each Contract item. 13.9.2 The Contractor shall furnish the City his proposed sequence and schedule for the completion of all work for their review and approval prior to the time of the pre-construction conference. The City shall have the right to specify the order of construction as deemed necessary.
SEQUENCE OF WORK. Carry out work of this section sequentially. Complete each activity before proceeding to the next.
SEQUENCE OF WORK. Contract specifications shall be completed and inspected on a unit-by-unit basis. No work shall be done on a succeeding block until acceptance of work on the preceding unit, unless agreed to in writing by the Officer-in-Charge ** Work shall not start in blocks located within wildlife restriction buffer areas until after August 1st. or as approved by Wildlife Department. Tribal –specified sequence of work is as follows: Priority Block Acres Restriction Estimated Start Date # Calendar Days Allowed na PC/BRKSS5/75 24.3 None 24 na PC/SS5-1/71 101.5 None 100 na PC/SS5-2/71 87.9 None 86 Totals: 213.7 210 The Contractor shall notify the Tribe prior to starting work on any unit. By this notification, spacing requirements, stream courses, slash treatment, and other items may be discussed prior to the start of work on each unit. The Tribe may specify a priority of work by unit.
SEQUENCE OF WORK. Excavation, cleaning, laying, jointing and backfilling shall be kept up as closely as is possible so as to progress in a uniform, workmanlike manner. In no case shall pipe be left in the trench overnight, without completing jointing. The completed pipe line shall not be left exposed in the trench unnecessarily and the Contractor will be required to backfill and compact the trench as soon as possible after laying and jointing is completed. The Contractor shall keep exposed ends of pipe properly plugged during laying to prevent dirt and other materials entering the line. Each day at the close of work, and at all times when laying is not in progress the exposed end of the pipe line in the trench shall be closed by the use of an approved header or barrier of wood or metals. If at any time it becomes necessary to cover the ends of an uncompleted pipe line with backfill, the end of such pipe line shall be closed, using a header with mechanical joint plug.
SEQUENCE OF WORK. The Contractor shall make every effort to complete the work in a manner and fashion that minimizes closures and inconveniences to the public. Once barricades are placed, the CONTRACTOR shall show progress of work during normal working days and hours. The contract documents are compiled to support the efficient operations of the Contractor and are not intended to supplant the Contractor's responsibility of superintendence. Special consideration regarding schedules and/or work sequences necessary or anticipated during the course of the project will be identified in the Special Provisions. THE STANDARD SPECIFICATIONS GOVERNING THIS PROJECT SHALL BE THE "CITY OF CHEYENNE/BOARD OF PUBLIC UTILITIES CONSTRUCTION SPECIFICATIONS AND STANDARD DRAWINGS, 2007" WITH APPROVED AMENDMENTS ISSUED BY THE CITY ENGINEER AT THE TIME OF THIS CONTRACT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO KEEP CURRENT ON THESE AMENDMENTS. COPIES OF THESE AMENDMENTS ARE AVAILABLE IN THE OFFICE OF THE CITY ENGINEER.
SEQUENCE OF WORK. 1a). Perform interior Hazardous Abatement and interior removal of attached and unattached fixtures on the First and Second Floors. 1b). Excavate exterior walls to expose waterproofing for abatement contractor to remove. 1c). After all interior materials have been removed and the roof abatement and material have been removed, then demolition of the concrete structure building can begin. The structure will be taken down to the top of the existing concrete slab on grade. 1d). Existing exterior overhead walkways, concrete stairs, 4 foot concrete planter walls with footings are to be removed. The buildings concrete slab on grade, structural footings and site paving are to remain. Conditions and Exclusions per proposal dated January 10, 2020 and referred to as Exhibit "A". (“Project” or “Contract” or “Work”) It is understood and agreed that the Work shall be performed and completed as required in the Contract Documents including, without limitation, the Drawings and Specifications and submission of all documents required to secure funding or by the Division of the State Architect for close-out of the Project, under the direction and supervision of, and subject to the approval of, the District or its authorized representative. Scope of Work as described in Exhibit A, attached hereto and incorporated herein by this reference.
SEQUENCE OF WORK. D18.1 Further to C6.1, the sequence of work on Rue Des Meurons shall be as follows: D18.
SEQUENCE OF WORK. 1 Refer to sequence of work specified in Section 04050, Masonry Procedures.