Standard of Allocation, Repair and Restoration Sample Clauses

Standard of Allocation, Repair and Restoration. Whenever, pursuant to this Declaration, it shall be necessary to determine the proportion of any Assessment hereunder which is to be borne by each Owner, the following shall apply: (a) The proportion to be borne by the Owner of any Parcel shall be determined in the manner provided in Exhibit “D”. (b) In the event that any new facilities, not presently called for or shown in the Building Plans, shall hereafter be constructed pursuant to this Declaration, and such new facility meets the definition of a Shared Facility, Assessments pertaining to such facility shall be allocated as determined by agreement of the Owners, or, if the Owners shall fail to agree, by arbitration in accordance with the provisions of Article XIV. ARTICLE XXIV.‌
AutoNDA by SimpleDocs

Related to Standard of Allocation, Repair and Restoration

  • Tenant Improvement Allowance Items Except as otherwise set forth in this Tenant Work Letter, the Tenant Improvement Allowance shall be disbursed by Landlord only for the following items and costs (collectively, the “Tenant Improvement Allowance Items”): 2.2.1.1 Payment of the fees of the “Architect” and the “Engineers,” as those terms are defined in Section 3.1 of this Tenant Work Letter, the costs of Tenant’s project manager (if any) and payment of the fees incurred by, and the cost of documents and materials supplied by, Landlord and Landlord’s consultants in connection with the preparation and review of the “Construction Drawings,” as that term is defined in Section 3.1 of this Tenant Work Letter; 2.2.1.2 The payment of plan check, permit and license fees relating to construction of the Tenant Improvements; 2.2.1.3 The cost of construction of the Tenant Improvements, including, without limitation, contractors’ fees and general conditions, testing and inspection costs, costs of utilities, trash removal, parking and hoists, and the costs of after-hours freight elevator usage. 2.2.1.4 The cost of any changes in the Base, Shell and Core work when such changes are required by the Construction Drawings (including if such changes are due to the fact that such work is prepared on an unoccupied basis), such cost to include all direct architectural and/or engineering fees and expenses incurred in connection therewith; 2.2.1.5 The cost of any changes to the Construction Drawings or Tenant Improvements required by applicable laws and building codes (collectively, “Code”); 2.2.1.6 Sales and use taxes; 2.2.1.7 The “Coordination Fee,” as that term is defined in Section 4.2.2.2 of this Tenant Work Letter; and 2.2.1.8 All other costs to be expended by Landlord in connection with the construction of the Tenant Improvements.

  • Maintenance, Alteration and Repair (a) Resident is responsible for and agrees to take good care of the premises, fixtures and all common areas. Resident may not remove any of Owner’s property and will not perform any repairs, upgrades, painting, wallpapering, electric changes or other alterations of the premises without prior written consent from Owner. Resident will be responsible for damage from waste stoppages caused by foreign or improper objects or improper use in lines serving bathrooms, damage to fixtures, appliances, doors, windows, screens, damage from water faucets left on or from doors left open, and repairs or replacements to alarm devices necessitated by misuse or damage by Resident and/or guests. Extraordinary appliances or furnishings such as satellite dishes, hot tubs, pool tables, water beds or high utility-consuming devices may not be installed or placed on the premises or anywhere at the Property without Owner’s prior written consent, in its sole discretion. SAMPLE (b) In the case of a malfunction of any utilities or damage by fire, water or similar cause, or any water leak, suspected mold or microbial growth, electrical problem, broken glass, broken lock or any other condition that Resident reasonably believes poses a hazard to health and safety, Resident must promptly notify Owner in writing. Owner will act with reasonable time and diligence in making repairs and reconnections; Resident may not withhold or reduce payment of rent or other charges during such time. Maintenance and repair requested by Resident will generally be performed between 8am and 8pm, unless the work is considered an emergency, in which case work may take place at any time. Owner may temporarily disconnect equipment or utilities to avoid property damage and/or to perform repairs requiring such interruption, in Owner’s sole discretion. Owner will not be liable for any inconvenience, discomfort, disruption or interference with Resident use of the premises because of ongoing repairs, alterations or improvements to the Property or any apartment. (c) Following move-in, Resident is responsible for providing and changing all light bulbs and batteries (for smoke detectors and remote controls) in the assigned apartment. A written maintenance report requesting assistance in changing these items may be submitted for maintenance staff assistance, with extra charges payable by Resident as applicable per Owner’s published rates. From time to time, maintenance staff may enter the assigned apartment with or without notice to inspect and change furnace filters and to provide pest control.

  • Restoration The following provisions shall apply in connection with the Restoration of any Property or Properties affected by a Casualty: (a) If the Net Proceeds reasonably expected to be received in connection with any single Casualty event is less than the Casualty Threshold Amount, then, (i) if no Event of Default shall have occurred and be continuing and, within sixty (60) days of the date of the occurrence of such Casualty, Borrower delivers to Lender a written undertaking to expeditiously commence and to satisfactorily complete with due diligence the Restoration of the affected Properties in accordance with the terms of this Agreement, then (A) if Net Proceeds are paid by the insurance company directly to Borrower subsequent to delivering such undertaking, such Net Proceeds may be retained by Borrower (for the avoidance of doubt, Net Proceeds received by Borrower prior to delivering such undertaking shall be immediately paid to Lender as required by Section 5.2), (B) if Net Proceeds are paid by the insurance company to Lender, such Net Proceeds will be disbursed by Lender to Borrower and (C) Borrower shall conduct the Restoration of the affected Properties in accordance with the terms of Section 5.4(c) and (ii) if an Event of Default shall have occurred and be continuing or Borrower fails to deliver such an undertaking to Lender, then (A) Lender may retain any Net Proceeds received by it, (B) Borrower shall immediately deliver to Lender any Net Proceeds paid to Borrower as required by Section 5.2, (C) such Net Proceeds shall be applied to the prepayment of the Debt in accordance with Section 2.4.3(c), (D) Borrower shall prepay the Loan in an amount equal to the positive difference between such Net Proceeds and the Allocated Loan Amount for the affected Properties, together with all interest and other amounts required to be paid in connection therewith under Section 2.4.5, and (E) following Borrower’s written request and receipt by Lender of the Net Proceeds and payment by Borrower of the amounts set forth in clause (D) above, Lender shall release the affected Properties from the applicable Mortgage Documents and related Liens, provided, that (x) Borrower has delivered to Lender draft releases (and, in the event any of the Mortgages and the Assignments of Leases and Rents applicable to any of the affected Properties encumber other Property(ies) in addition to the affected Properties, such release shall be a partial release that relates only to the affected Property(ies) and does not affect the Liens and security interests encumbering or on the other Property(ies)) in form and substance appropriate for the jurisdiction in which such affected Properties are located and shall contain standard provisions protecting the rights of Lender and (y) Borrower shall pay all costs, taxes and expenses associated with such release (including, without limitation, cost to file and record the release and Lender’s reasonable attorneys’ fees). (b) If the Net Proceeds reasonably expected to be received in connection with any single Casualty event is greater than the Casualty Threshold Amount, then, (i) if no Event of Default shall have occurred and be continuing and, within sixty (60) days of the date of the occurrence of such Casualty, Borrower delivers to Lender a written undertaking to expeditiously commence and to satisfactorily complete with due diligence the Restoration of the affected Properties in accordance with the terms of this Agreement, then (A) Borrower shall immediately deliver to Lender any Net Proceeds paid to Borrower as required by Section 5.2 and (B) Borrower shall conduct the Restoration of the affected Properties in accordance with the terms of and subject to the conditions of Section 5.4(d) and (ii) if an Event of Default shall have occurred and be continuing or Borrower fails to deliver such an undertaking to Lender, then (A) Lender may retain any Net Proceeds received by it, (B) Borrower shall immediately deliver to Lender any Net Proceeds paid to Borrower as required by Section 5.2, (C) such Net Proceeds shall be applied to the prepayment of the Debt in accordance with Section 2.4.3(c), (D) Borrower shall prepay the Loan in an amount equal to the positive difference between such Net Proceeds and the Allocated Loan Amount for the affected Properties, together with all interest and other amounts required to be paid in connection therewith under Section 2.4.5, and (E) following Borrower’s written request and receipt by Lender of the Net Proceeds and payment by Borrower of the amounts set forth in clause (D) above, Lender shall release the affected Properties from the applicable Mortgage Documents and related Liens, provided, that (x) Borrower has delivered to Lender draft releases (and, in the event any of the Mortgages and the Assignments of Leases and Rents applicable to any of the affected Properties encumber other Property(ies) in addition to the affected Properties, such release shall be a partial release that relates only to the affected Property(ies) and does not affect the Liens and security interests encumbering or on the other Property(ies)) in form and substance appropriate for the jurisdiction in which such affected Properties are located and shall contain standard provisions protecting the rights of Lender and (y) Borrower shall pay all costs, taxes and expenses associated with such release (including, without limitation, cost to file and record the release and Lender’s reasonable attorneys’ fees). (c) If Borrower elects to undertake the Restoration of a Property or Properties pursuant to Section 5.4(a), (i) Borrower shall commence the Restoration as soon as reasonably practicable (but in no event later than ninety (90) days after such Casualty occurs) and shall diligently pursue the same to satisfactory completion; (ii) Borrower shall cause the affected Property and the use thereof after the Restoration to be in compliance with and permitted under all applicable Legal Requirements and such Property, after Restoration, shall be of the same character as prior to such damage or destruction; (iii) the Restoration shall be done and completed by Borrower in an expeditious and diligent fashion and in compliance with all applicable Legal Requirements and the Renovation Standards and (iv) Borrower shall deliver, or cause to be delivered, to Lender a signed detailed budget approved in writing by Borrower’s architect or engineer stating the entire cost of completing the Restoration, which budget shall be reasonably acceptable to Lender. (d) If Borrower elects to undertake the Restoration of a Property or Properties pursuant to Section 5.4(b), the following provisions shall apply: (i) the Net Proceeds shall be made available to Borrower for Restoration upon the determination of Lender that the following conditions are met: (i) Borrower shall commence the Restoration as soon as reasonably practicable (but in no event later than ninety (90) days after such Casualty occurs) and shall diligently pursue the same to satisfactory completion; (ii) Lender shall be satisfied that any operating deficits, including all scheduled payments of principal and interest under the Note, which will be incurred with respect to the Properties as a result of the occurrence of the Casualty, whichever the case may be, will be covered out of (1) the Net Proceeds, (2) the insurance coverage referred to in Section 5.1.1 (a) (ii), if applicable, or (3) by other funds of Borrower; (iii) Lender shall be satisfied that the Restoration will be completed on or before the earliest to occur of (1) the date six (6) months prior to the Stated Maturity Date, as extended pursuant to Section 2.7, (2) the earliest date required for such completion under the terms of any Lease, (3) such time as may be required under applicable Legal Requirements or (4) six (6) months prior to the expiration of the insurance coverage referred to in Section 5.1.1 (a) (ii); (iv) Borrower shall cause the affected Property and the use thereof after the Restoration to be in compliance with and permitted under all applicable Legal Requirements and such Property, after Restoration, shall be of the same character as prior to such damage or destruction; (v) the Restoration shall be done and completed by Borrower in an expeditious and diligent fashion and in compliance with all applicable Legal Requirements and the Renovation Standards; (vi) Borrower shall deliver, or cause to be delivered, to Lender a signed detailed budget approved in writing by Borrower’s architect or engineer stating the entire cost of completing the Restoration, which budget shall be reasonably acceptable to Lender and (vii) the Net Proceeds together with any cash or cash equivalent deposited by Borrower with Lender are sufficient in Lender’s discretion to cover the cost of the Restoration. (ii) The Net Proceeds shall be held by Lender in the Casualty and Condemnation Account and, until disbursed in accordance with the provisions of this Section 5.4(d), shall constitute additional security for the Debt and other obligations under the Loan Documents. The Net Proceeds shall be disbursed by Lender to, or as directed by, Borrower from time to time during the course of the Restoration, upon receipt of evidence satisfactory to Lender that (A) all materials installed and work and labor performed (except to the extent that they are to be paid for out of the requested disbursement) in connection with the Restoration have been paid for in full, and (B) there exist no notices of pendency, stop orders, mechanic’s or materialman’s liens or notices of intention to file same, or any other liens or encumbrances of any nature whatsoever on the Properties which have been fully bonded to the satisfaction of Lender and discharged of record or in the alternative fully insured to the satisfaction of Lender by the title company issuing the Title Insurance Policy. (iii) All plans and specifications required in connection with the Restoration shall be subject to the prior approval of Lender and an independent consulting engineer selected by Lender (the “Casualty Consultant”). Lender shall have the use of the plans and specifications and all permits, licenses and approvals required or obtained in connection with the Restoration. The identity of the contractors, subcontractors and materialmen engaged in the Restoration, as well as the contracts under which they have been engaged, shall be subject to the approval of Lender and the Casualty Consultant. All costs and expenses incurred by Lender in connection with recovering, holding and advancing the Net Proceeds for the Restoration including, without limitation, reasonable attorneys’ fees and disbursements and the Casualty Consultant’s fees and disbursements, shall be paid by Borrower. (iv) In no event shall Lender be obligated to make disbursements of the Net Proceeds in excess of an amount equal to the costs actually incurred from time to time for work in place as part of the Restoration, as certified by the Casualty Consultant, less the Casualty Retainage. The term “Casualty Retainage” shall mean, as to each contractor, subcontractor or materialman engaged in the Restoration, an amount equal to ten percent (10%) of the costs actually incurred for work in place as part of the Restoration, as certified by the Casualty Consultant, until the Restoration has been completed. The Casualty Retainage shall in no event, and notwithstanding anything to the contrary set forth above in this Section 5.4(d), be less than the amount actually held back by Borrower from contractors, subcontractors and materialmen engaged in the Restoration. The Casualty Retainage shall not be released until the Casualty Consultant certifies to Lender that the Restoration has been completed in accordance with the provisions of this Section 5.4(b) and that all approvals necessary for the re-occupancy and use of the Property have been obtained from all appropriate Governmental Authorities, and Lender receives evidence satisfactory to Lender that the costs of the Restoration have been paid in full or will be paid in full out of the Casualty Retainage; provided, however, that Lender will release the portion of the Casualty Retainage being held with respect to any contractor, subcontractor or materialman engaged in the Restoration as of the date upon which (x) the Casualty Consultant certifies to Lender that such contractor, subcontractor or materialman has satisfactorily completed all work and has supplied all materials in accordance with the provisions of such contractor’s, subcontractor’s or materialman’s contract, (y) the contractor, subcontractor or materialman delivers the lien waivers and evidence of payment in full of all sums due to the contractor, subcontractor or materialman as may be reasonably requested by Lender or by the title company issuing the Title Insurance Policy, and (z) Lender receives an endorsement to the Title Insurance Policy insuring the continued priority of the Lien of the Mortgage and evidence of payment of any premium payable for such endorsement. If required by Lender, the release of any such portion of the Casualty Retainage shall be approved by the surety company, if any, which has issued a payment or performance bond with respect to the contractor, subcontractor or materialman.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Emergency Repairs a) The landlord must post and maintain in a conspicuous place on the residential property, or give to the tenant in writing, the name and telephone number of the designated contact person for emergency repairs. b) If emergency repairs are required, the tenant must make at least two attempts to telephone the designated contact person, and then give the landlord reasonable time to complete the repairs. c) If the emergency repairs are still required, the tenant may undertake the repairs, and claim reimbursement from the landlord, provided a statement of account and receipts are given to the landlord. If the landlord does not reimburse the tenant as required, the tenant may deduct the cost from rent. The landlord may take over completion of the emergency repairs at any time. d) Emergency repairs must be urgent and necessary for the health and safety of persons or preservation or use of the residential property and are limited to repairing i) major leaks in pipes or the roof,

  • Establishment of Escrow Account Prior to the Issuer initiating the Offering, and prior to the receipt of the first Subscriber funds, Escrow Agent shall establish an account for the Issuer (the “Escrow Account”). All parties agree to maintain the Escrow Account and Escrow Amount (as defined below) in a manner that is compliant with applicable banking and securities regulations. Escrow Agent shall be the sole administrator of the Escrow Account.

  • Disbursement of Tenant Improvement Allowance During the construction of the Tenant Improvements, Landlord shall make monthly disbursements of the Tenant Improvement Allowance for Tenant Improvement Allowance Items for the benefit of Tenant and shall authorize the release of monies for the benefit of Tenant as follows.

  • Disbursement of the Tenant Improvement Allowance Except as otherwise set forth in this Work Letter, the Tenant Improvement Allowance shall be disbursed by Landlord (each of which disbursements shall be made pursuant to Landlord’s disbursement process, which disbursement process shall require the Architect to make field verifications and written certifications as required by Landlord in connection with Landlord’s disbursements to Contractor (as defined below)) only for the following items and costs (collectively the “Tenant Improvement Allowance Items”): (a) Payment of (i) the fees of the Architect and the Engineers (as defined below), (ii) charges for Landlord’s construction consultant and Building engineer, and (iii) the fees incurred by, and the cost of documents and materials supplied by, Landlord and Landlord’s consultants in connection with the preparation and review of the Construction Drawings (as defined below); (b) The payment of plan check, permit and license fees relating to construction of the Tenant Improvements; (c) The cost of construction of the Tenant Improvements, including, without limitation, any cost of after-hours freight elevator usage; (d) The cost of any changes in the Base, Shell, and Core when such changes are required by the Construction Drawings, such cost to include all direct architectural and/or engineering fees and expenses incurred in connection therewith; (e) The cost of any changes to the Construction Drawings or Tenant Improvements required by applicable laws and building codes (collectively, “Code”); (f) Sales and use taxes; and (g) All other costs to be expended by Landlord in connection with the construction of the Tenant Improvements. In no event shall the Tenant Improvement Allowance Items include any costs of procuring or installing in the Premises any trade fixtures, equipment, furniture, furniture partitions or systems, furnishings, telephone, telecommunications, data and security wiring, cabling and equipment, or other personal property (“Personal Property”) to be used in the Premises by Tenant, and the cost of such Personal Property shall be paid by Tenant.

  • Alterations and Repairs Lessee shall not make or permit to be made any other alterations, additions, improvements, or changes (collectively, “Alterations”), in the premises, without Lessor’s prior written approval, which approval Lessor may withhold in Lessor’s sole discretion. Subject to the services to be rendered by Lessor as set forth in the Schedule, Lessee shall, at Lessee’s expense, keep the premises generally consistent with the standard maintained by other tenants of premises in the Building during the tenancy. If Lessee does not make repairs promptly and adequately, Lessor may, but need not, make repairs, and Lessee shall pay promptly the reasonable cost thereof. At any time or times, Lessor, either voluntarily or pursuant to governmental requirement, may, at Lessor’s expense, make repairs, alterations, or improvements in or to the Building or any part thereof, including the premises, and, during such operations Lessor may close entrances, doors, corridors, elevators, or other facilities, all without any liability to Lessee or deduction of rent by reason of interference, inconvenience, or annoyance; provided that Lessee shall have access to the premises sufficient for conduct of Lessee’s business. Lessor shall not be liable to Lessee for any expense, injury, loss, or damage resulting from work done in or upon, or the use of, any adjacent or nearby building, land, street, or alley, provided that Lessor makes a reasonable effort to minimize the disruption to Lessee’s business. In the event Lessee requests that repairs, alterations, decorating, or other work in the premises be made during periods other than ordinary business hours, Lessee shall pay Lessor for overtime and other additional expenses incurred because of such request.

  • Repair and Replacement Company shall be responsible to Lessor for reasonable replacement costs, or reasonable repair costs of all Equipment which is lost, stolen, or damaged while in the care, custody and control of Company as a result of Company's sole negligence in accordance with paragraph 2 above, reasonable wear and tear excepted, using the Actual Cash Value of the Equipment at the time of such loss. Prior to repairing the Equipment, Lessor shall submit to Company at least three estimates, including at least one estimate from a repair facility designated by Company. In the event the Equipment is lost or stolen, Company shall file a police report.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!