Statement of Probable Construction Cost Sample Clauses

Statement of Probable Construction Cost. I certify that I have examined the Predesign Study (or Program) as furnished to me by the Using Agency for this Project.
AutoNDA by SimpleDocs
Statement of Probable Construction Cost. I certify that I have examined the Project Development File (or Program) as furnished to me by the Using Agency for this Project.
Statement of Probable Construction Cost. The Design Professional shall submit to the Owner for review and approval a Design Development phase estimate of probable construction cost itemized by major categories based on the expected bid date. The Format for this estimate is to follow the content of the Project’s Outline Specification for Divisions 2 through 17.
Statement of Probable Construction Cost. I certify that I have examined the Predesign Study (or Program) as furnished to me by the Using Agency for this Project. I certify to the best of my knowledge, information, and belief that the Probable Construction Cost furnished herein covers all work to be drawn, specified, and constructed under the Predesign Study (or Program.) I certify to the best of my knowledge, information, and belief that, as to the Statement of Probable Construction Cost furnished herein, all construction work necessary for the completion of the Project for occupancy is included. I certify to the best of my knowledge, information, and belief that there is no work included in this Statement of Probable Construction Cost furnished herein that is beyond the scope of this Project as defined by the Predesign Study (or Program) referred to in Paragraph 1 of this certificate. I certify to the best of my knowledge, information, and belief that: The total sum area in square feet of this Project, computed in accordance with the criteria in Exhibit F of the Design Professional Contract, per the attached computations, is ; The total cubage of this Project, per attached computations, is ; The estimated cost per square foot based on the anticipated low Bid (or anticipated initial GMP Change Order) for a turnkey job is, $ ; The estimated cost per cubic foot based on the anticipated low Bid (or anticipated initial GMP Change Order) for a turnkey job, is $ ; The separate estimated cost of grading site, per attached detailed breakdown or engineering figure, in compliance with the Site Memorandum, is $ ; and The time required for completion of construction is estimated to be calendar days from the date of commencement of work. Subsurface Investigations. The Design Professional certifies he has a report on file from a competent geotechnical engineer or competent independent testing laboratory, the said report being signed by a registered geotechnical engineer, in which the Design Professional has been furnished with both the Stage One and the Stage Two Statements as prescribed in the Site Memorandum (see Exhibit G), according to which the Design Professional advises the Owner that the following quantity of rock will probably be encountered: . The Design Professional estimates that the cost of removing the above quantity of rock will be approximately $ . The Design Professional further advises that this amount has been included in the Statement of Probable Construction Cost and that the Design Profes...
Statement of Probable Construction Cost. With the pre-final documents, the Professional shall provide an updated Statement of Probable Construction Cost in a form acceptable to the Department. At this submission, the Statement of Probable Construction Cost must include a breakdown of the estimated construction cost computed at present prices, projected to the midpoint of construction, and a justification of the factors used for such projection. This Statement of Probable Construction Cost must address any modifications made by the Professional in the course of revising the preliminary documents. The Professional shall provide a complete budget summary showing the breakdown, including detailed line items and takeoffs. Statements of Probable Construction Cost must be coordinated and consistent with project descriptions, plans, drawings and Specifications at the time the statement is prepared. If the Statement of Probable Construction Cost furnished with the pre-final design submission is not within the Base Construction Allocation, the Department will have the following options for proceeding with the design: A. The Department may require the Professional to adjust the entire design, at no expense to the Department, to bring the preliminary cost estimate within the Base Construction Allocation. Design modifications require the Department's approval. B. The Department may require the Professional to include base bids to bring the Pre- Final Statement of Probable Construction Cost within the Base Construction Allocation. The Professional’s compensation will remain based on the Base Construction Allocation. C. The Department, at its sole discretion, may seek a revised Project Scope. If in the Department’s opinion the revised Project Scope necessitates a redesign of the Project, the Department shall compensate the Professional for the redesign in accordance with Exhibit A of the Professional Agreement. D. The Department, at its sole discretion, may seek a revised Base Construction Allocation. Until such time as the Department approves a revised Base Construction Allocation, the Professional’s compensation will remain based on the current Base Construction Allocation. If the Department approves the revised Base Construction Allocation, the Department will notify the Professional to proceed with the design and the Professional must prepare a Work Order Supplement to revise the Base Construction Allocation for purposes of the Professional’s compensation. If the Department does not approve the revised Base...
Statement of Probable Construction Cost. The Professional shall prepare and submit an initial Statement of Probable Construction Cost in a form acceptable to the Department. The Professional shall provide a complete budget summary based on areas, volume, and other unit costs, escalating to midpoint of construction. Statements of Probable Construction Cost must be coordinated and consistent with Project descriptions, plans, drawings, and Specifications at the time the statement is prepared.
Statement of Probable Construction Cost. The Professional shall submit its Statement of Probable Construction Cost on the form approved by the Bureau and shall include the level of detail commensurate with the current level of design. The Department reserves the right to have the construction manager, if any, on the Project review and comment on the Professional’s Statement of Probable Construction Cost. A. The Professional shall submit a Statement of Probable Construction Cost with each design submission as provided for in this Professional Agreement. Such Statements of Probable Construction Cost must always be based upon the Base Construction Allocation. The Professional shall not rely on any potential increase in the Base Construction Allocation, unless the increase has been approved by the Department. B. If the Statement of Probable Construction Cost indicates a potential problem in securing a base bid within the Base Construction Allocation, the Professional shall notify the Department and shall coordinate with the Department to redefine the design concepts of space utilization, building efficiencies, materials of construction, and so forth, so that the estimated cost of construction does not exceed the Base Construction Allocation. C. The Statement of Probable Construction Cost must reflect construction standards and address indexes utilized, outreach to the contracting community, and any assumptions made in computing the Statement of Probable Construction Cost, including escalation to the anticipated bid opening date. D. The Professional shall submit a Statement of Probable Construction Cost with the final submission itemized to match the Department’s schedule of prices and pay items for the Project.
AutoNDA by SimpleDocs
Statement of Probable Construction Cost services consisting of updating Statement of Probable Construction Cost of the Project when the Construction documents are approximately 100% complete, taking into account: .01 Changes in materials, systems or details of construction which have occurred during preparation of the Construction Documents. .02 Known changes in the cost of materials, labor and services since preparation of the previous Statement of Probable Construction Cost. .03 Adjustments for known or anticipated changes in the bidding market relative to the Project.
Statement of Probable Construction Cost services during the Design Development Phase consisting of updating and refining the Schematic Design Phase Statement of Probable Construction Cost of the Project.
Statement of Probable Construction Cost services during the Schematic Design Phase consisting of development of a probable construction cost range for the Project based on the most recent schematic design studies, current and historic area, volume, or other unit costs, expected Project delivery process, and appropriate contingencies.