TESTING AND COMMISSIONING. 24 Allow for a Lump Sum for testing and commissioning of the entire electrical installation, including the provision of Compliance Certificate. Item Carried to Collection R Section No. 4 Electrical Installation (Provisional) Bill No. 1 Electrical Installation COLLECTION Total Brought Forward from Page No. Carried to Final Summary 76 77 R Amount FINAL SUMMARY Section No Page No 1 Preliminaries 26 2 Alterations (Provisional) 30 3 External Works (Provisional) 73
TESTING AND COMMISSIONING. 24 Allow for a Lump Sum for testing and commissioning of the entire electrical installation, including the provision of Compliance Certificate. Item Carried to Collection R Section No. 4 Electrical Installation (Provisional) Bill No. 1 Electrical Installation COLLECTION Total Brought Forward from Page No. Carried to Final Summary 76 77 R Amount FINAL SUMMARY Section No Page No 1 Preliminaries 26 2 Alterations (Provisional) 30 3 External Works (Provisional) 73 4 Electrical Installation (Provisional) 78 SUB-TOTAL CONTINGENCIES Allow five per cent (5%) of the above sub-total for contingencies to be used as directed and deducted in whole or in part if not required. SUB-TOTAL: Add Value Added Tax at the rate of 15%
TESTING AND COMMISSIONING. 15.1.1. The Contractor must comply with any hold and test requirements in the Scope of Works and associated specifications.
TESTING AND COMMISSIONING. 31.1 The Design-Builder will prepare and deliver to the Owner, not less than 120 days before the Target Substantial Completion Date, for review under the Review Procedure, a detailed testing and commissioning plan (the “Commissioning Plan”) setting out the commissioning activities the Design-Builder intends to carry out to commission the Facility, including:
TESTING AND COMMISSIONING. This schedule is a technical document that necessarily varies from project to project. It must take account not only of the characteristics of the renewable energy technology being utilised, but also the capabilities and limitations of the project’s design and equipment. The specific testinmg steps, and the test criteria must be negotiated by the Developer and Utility with the specific design, equipment, and operational characteristics of the Project and the Utility’s Grid taken into account. Developer shall, at its own expense, carry out the testing and commissioning of the Project and the connecting transmission infrastructure in accordance with the provisions of this Schedule C, the specifications set out in Schedule E (Technical Specifications), and Prudent Utility Practice. Utility shall be given 5 days prior written notice of any testing or commissioning procedure and Utility shall be entitled to have representatives present for purposes of observing any such procedures. If Utility representatives are unable to attend for any reason, the testing may proceed without them. C1. TESTS PRIOR TO INITIAL COMMERCIAL OPERATION (details to be agreed) C2. TESTING & GUARANTEES (details to be agreed) C3. TESTING OF INTERCONNECTION FACILITIES (details to be agreed) SCHEDULE D
TESTING AND COMMISSIONING. 33.1 The Design-Builder will prepare and deliver to the Authority’s Representative and the Authority’s Consultant a detailed plan (the “Commissioning Plan”) setting out the testing, commissioning, training and other activities the Design-Builder intends to carry out to satisfy this Section 33 and to achieve Substantial Completion, including:
TESTING AND COMMISSIONING. 12.4.1 Testing of all materials, equipment and instrumentation shall be done as specified in the Technical Specifications. Installation of all electro-mechanical equipment shall be carried out strictly as per recommendations of the manufacturers. Pre-commissioning and trial run shall be undertaken as specified in Technical Specifications covered under section Schedule 24 of this document.
TESTING AND COMMISSIONING. 5.1 After installation of the Relevant System, the System Installer will test/commission the Relevant System onsite to confirm that it is compliant with manufacturer’s specifications and to ensure the Relevant System is fully operational.
TESTING AND COMMISSIONING. 5.1.The Company shall test and commission the System after installation in accordance with AS 4509 “Test and Commissioning”, to ensure that it is operating as specified in the Contract.
TESTING AND COMMISSIONING. Following completion of construction, Contractor shall provide the following services related to startup and performance testing of the PV systems: • Acceptance Testing • Proving Period A detailed Testing Plan covering each of the phases above shall be submitted and approved by the County prior to substantial completion of construction. A detailed description of each phase is provided below.