The Breakout Maneuver Sample Clauses

The Breakout Maneuver. Working with industry, the FAA conducted extensive analysis of simulation data and determined that the implementation of PRM and SOIA approach operations to closely-spaced parallel runways requires additional crew training. The primary focus of this training is to raise each pilot’s situational awareness in ILS PRM, LDA PRM, and RNAV (GPS) PRM operations. The breakout maneuver must be flown manually. a. Traffic Alert. One important element of the additional training is the pilot understands the difference between a normal missed approach initiated by a pilot and a breakout initiated by a PRM final monitor controller. It must be clear to flightcrews that when the final monitor controller uses the words “Traffic Alert,” the controller will then give critical instructions that the pilot must act on promptly to preserve adequate separation from an airplane straying into the adjoining approach path. b. ATC Breakout Maneuver Command to Turn and Either a Climb or Descent. The flightcrew must immediately follow the final monitor controller’s vertical (climb/descend/maintain altitude) and horizontal (turn) commands. If the flightcrew is operating the Traffic Alert and Collision Avoidance System (TCAS) in the Traffic Advisory (TA)/Resolution Advisory (RA) mode and receives a TCAS RA at any time while following the final monitor controller’s command, the flightcrew will simultaneously continue to turn to the controller’s assigned heading and follow the vertical guidance provided by the TCAS RA. c. Time-to-Turn Standard. Regardless of airplane type, tests and data analysis revealed that pilots normally passed through an angle of bank of at least 3 degrees while rolling into a breakout turn within 10 seconds of receiving a breakout command. (Bank angles of between 20 and 30 degrees were normally achieved during the breakout.) The foreign air carrier must show that its CAA has determined that pilots can readily meet this time-to-initiate-turn standard prior to the POI authorizing ILS/PRM, LDA/PRM, or RNAV (GPS) PRM approaches in C052. 1. Flightcrews are required to manually fly the breakout maneuver unless otherwise approved. 2. The foreign air carrier should demonstrate its ability to meet this standard by having representative pilots perform the breakout maneuver while the POI or the POI’s designated representative observes. 3. The demonstration should conform to procedures contained in the foreign air carrier’s approved operating manual for its flightcrews. 4. The fo...
AutoNDA by SimpleDocs

Related to The Breakout Maneuver

  • Downtime There may be downtime during the Migration. The duration of the downtime will depend on the amount of data that Agency is migrating. Axon will work with Agency to minimize any downtime. Any VIEVU mobile application will need to be disabled upon Migration.

  • Tie Breaker The parties agree to utilize the following procedure if two or more members of the bargaining unit hold the same position within the same department and have the identical seniority dates: 1. If two or more bargaining unit members have the same amount of time in a particular classification, the first tiebreaker is the date of continuous University service. Continuous service is that service unbroken by a resignation or termination from the University. 2. In the event that a tie is not broken by the foregoing procedure, the second tiebreaker shall be the uninterrupted service of an employee with a state agency, a county office, or a state-supported college or university where no break in service occurs. 3. In the event a tie is not broken by either of the foregoing procedures, we will use the last four (4) digits of the Social Security Number, in ascending order with the lowest number prevailing (i.e. 0001, 0002, 0003, 0004 – 0001 Prevails).

  • The Supplier must 12.1.1 comply with the Buyer’s written instructions and this Call-Off Contract when Processing Buyer Personal Data 12.1.2 only Process the Buyer Personal Data as necessary for the provision of the G-Cloud Services or as required by Law or any Regulatory Body 12.1.3 take reasonable steps to ensure that any Supplier Staff who have access to Buyer Personal Data act in compliance with Supplier's security processes

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Network Upgrades The Transmission Owner shall design, procure, construct, install, and own the Network Upgrades described in Attachment 6 of this Agreement. If the Transmission Owner and the Interconnection Customer agree, the Interconnection Customer may construct Network Upgrades that are located on land owned by the Interconnection Customer. Unless the Transmission Owner elects to pay for Network Upgrades, the actual cost of the Network Upgrades, including overheads, shall be borne initially by the Interconnection Customer.

  • Uptime bookinglab shall ensure that the Booking Service will be available, excluding Downtime caused by Scheduled Maintenance, Emergency Maintenance or Force Majeure event, 99.5% of the time in any one calendar month (first day to last day) (the “Service Level”). The Service Level will not apply (and therefore no Service Credits will be applicable) to the extent that any Service Level Failure is caused by: (a) a Penetration Test conducted by Customer without the prior written approval of bookinglab; or (b) Customer’s failure to comply with specific instructions provided by bookinglab; or (c) a failure of the Customer to comply with any Customer responsibility or obligation detailed in a Statement of Work, Order Form or the Master Subscription Agreement; or (d) Customer’s failure to adhere to JRNI’s or bookinglab’s best practice guidelines for the use of the API.

  • Compatibility 1. Any unresolved issue arising from a mutual agreement procedure case otherwise within the scope of the arbitration process provided for in this Article and Articles 25A to 25G shall not be submitted to arbitration if the issue falls within the scope of a case with respect to which an arbitration panel or similar body has previously been set up in accordance with a bilateral or multilateral convention that provides for mandatory binding arbitration of unresolved issues arising from a mutual agreement procedure case. 2. Nothing in this Article and Articles 25A to 25G shall affect the fulfilment of wider obligations with respect to the arbitration of unresolved issues arising in the context of a mutual agreement procedure resulting from other conventions to which the Contracting States are or will become parties.”.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Maintenance Outages If Seller reasonably determines that it is necessary to schedule a Maintenance Outage, Seller shall notify Buyer of the proposed Maintenance Outage at least five (5) days before the outage begins (or such shorter period to which Buyer may reasonably consent in light of then existing conditions). Upon such notice, the Parties shall plan the Maintenance Outage to mutually accommodate the reasonable requirements of Seller and the service obligations of Buyer; provided, however, that, unless Buyer otherwise consents, such consent not to be unreasonably withheld, no Maintenance Outage may be scheduled between the hour ending 0700 through the hour ending 2200, Monday through Saturday, during the time period commencing on May 15 and concluding on September 15. Notice of a proposed Maintenance Outage shall include the expected start date and time of the outage, the amount of Capacity of the Facility that will not be available, and the expected completion date and time of the outage. Seller shall give Buyer notice of the Maintenance Outage as soon as Seller determines that the Maintenance Outage is necessary. Buyer shall promptly respond to such notice and may request reasonable modifications in the schedule for the outage. Seller shall use all reasonable efforts to comply with any request to modify the schedule for a Maintenance Outage. Seller shall notify Buyer of any subsequent changes in Capacity available to Buyer or any changes in the Maintenance Outage completion date and time. As soon as practicable, any notifications given orally shall be confirmed in writing. Seller shall take all reasonable measures and exercise its best efforts in accordance with Prudent Electrical Practices to minimize the frequency and duration of Maintenance Outages.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!