Topographical Surveys and Soil Sample Clauses

Topographical Surveys and Soil. Investigations The Contractor may be required to perform topographical surveys and/or soil investigations by the Employer. He shall be ready with the qualified agencies he intends to use for these purposes and ensure that the work starts within 14 days of receipt of a Notice to Proceed from the Employer. The topographical survey work shall be carried out with Total Stations technology and applicable surveying and mapping software shall be used for creating the required drawings. Any topographical survey work required by the Employer shall be paid in accordance with the Contractor’s Price Schedule (Xxxx of Quantities). Any soils investigation work required by the Employer shall be paid for by a Price schedule(BOQ). The item shall be read and executed in accordance with the chapterSurvey Documents’ of Subsection – General Requirements
AutoNDA by SimpleDocs

Related to Topographical Surveys and Soil

  • Topographic Survey 3.1 Notify affected property owners of pending survey.

  • Geological and Archeological Specimens If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Surveys Each Borrower shall submit the Ship owned by it regularly to all periodical or other surveys which may be required for classification purposes and, if so required by the Security Trustee provide the Security Trustee, with copies of all survey reports.

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • ARCHAEOLOGY Lessee shall not destroy, disturb, mar, collect, remove or alter any prehistoric or historic resources of any kind on Weld County lands as provided by law. These resources include, but are not limited to, all artifacts of stone, wood or metal, pictographs, structures, and bones. A discovery of anything of prehistoric or historic nature shall be reported to Lessor or the State of Colorado Archaeologist immediately.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Topography Altering the existing topography of the Property by digging, plowing, disking, or otherwise disturbing the surface is prohibited, unless Grantee determines such requested action will be carried out consistent with the Restoration Plan and will be carried out in a manner that protects the conservation values. Grantor shall obtain Xxxxxxx’s written permission in advance of commencing such action.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Barriers Barriers shall be used to prevent the migration of airborne pollutants from areas under construction and to mitigate any construction noise that may disrupt occupant activities. If effective controls for pollution emissions cannot be practically implemented, activities involving significant airborne pollutants shall be scheduled during off-hours at Contractor’s expense. The Site shall be ventilated with fresh outside air during and immediately after the noxious activity.

Time is Money Join Law Insider Premium to draft better contracts faster.