Time Limits to Present Initial Grievance An employee who wishes to present a grievance at Step 2 of the grievance procedure, in the manner prescribed in Clause 8.4, must do so no later than 30 days after the date: (a) on which they were notified orally or in writing, of the action or circumstances giving rise to the grievance; (b) on which they first became aware of the action or circumstances giving rise to the grievance.
DOMESTIC PREFERENCES FOR PROCUREMENTS To the extent applicable, Supplier certifies that during the term of this Contract will comply with applicable requirements of 2 C.F.R. § 200.322.
ADB’s Review of Procurement Decisions 11. All contracts procured under international competitive bidding procedures and contracts for consulting services shall be subject to prior review by ADB, unless otherwise agreed between the Borrower and ADB and set forth in the Procurement Plan.
CFR PART 200 Domestic Preferences for Procurements As appropriate and to the extent consistent with law, the non-Federal entity should, to the greatest extent practicable under a Federal award, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products). The requirements of this section must be included in all subawards including all contracts and purchase orders for work or products under this award. For purposes of 2 CFR Part 200.322, “Produced in the United States” means, for iron and steel products, that all manufacturing processes, from the initial melting stag through the application of coatings, occurred in the United States. Moreover, for purposes of 2 CFR Part 200.322, “Manufactured products” means items and construction materials composed in whole or in part of non-ferrous metals such as aluminum, plastics and polymer-based products such as polyvinyl chloride pipe, aggregates such as concrete, class, including optical fiber, and lumber. Pursuant to the above, when federal funds are expended by ESC Region 8 and TIPS Members, Vendor certifies that to the greatest extent practicable Vendor will provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products). Does vendor agree? Yes
Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the Certificate/VID Number identified above. Agencies, universities and prime contractors are encouraged to verify the company’s HUB certification prior to issuing a notice of award by accessing the Internet (xxxxx://xxxxx.xxx.xxxxx.xx.xx/tpasscmblsearch/index.jsp) or by contacting
CLEC to CLEC Conversions for Unbundled Loops 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in Lightyear’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear must order and will be billed for both OC and OC-TS if requesting OC-TS.
Lost Shareholder Due Diligence Searches and Servicing The Trust hereby acknowledges that USBFS has an arrangement with an outside vendor to conduct lost shareholder searches required by Rule 17Ad-17 under the Securities Exchange Act of 1934, as amended. Costs associated with such searches will be passed through to the Trust as an out-of-pocket expense in accordance with the fee schedule set forth in Exhibit C hereto. If a shareholder remains lost and the shareholder’s account unresolved after completion of the mandatory Rule 17Ad-17 search, the Trust hereby authorizes vendor to enter, at its discretion, into fee sharing arrangements with the lost shareholder (or such lost shareholder’s representative or executor) to conduct a more in-depth search in order to locate the lost shareholder before the shareholder’s assets escheat to the applicable state. The Trust hereby acknowledges that USBFS is not a party to these arrangements and does not receive any revenue sharing or other fees relating to these arrangements. Furthermore, the Trust hereby acknowledges that vendor may receive up to 35% of the lost shareholder’s assets as compensation for its efforts in locating the lost shareholder.
Please see the current Washtenaw Community College catalog for up-to-date program requirements Conditions & Requirements
200 Domestic Preferences for Procurements As appropriate and to the extent consistent with law, the non-Federal entity should, to the greatest extent practicable under a Federal award, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products). The requirements of this section must be included in all subawards including all contracts and purchase orders for work or products under this award. For purposes of 2 CFR Part 200.322, “Produced in the United States” means, for iron and steel products, that all manufacturing processes, from the initial melting stag through the application of coatings, occurred in the United States. Moreover, for purposes of 2 CFR Part 200.322, “Manufactured products” means items and construction materials composed in whole or in part of non-ferrous metals such as aluminum, plastics and polymer-based products such as polyvinyl chloride pipe, aggregates such as concrete, glass, including optical fiber, and lumber. Pursuant to the above, when federal funds are expended by ESC Region 8 and TIPS Members, Vendor certifies that to the greatest extent practicable Vendor will provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products). Does vendor agree? Yes
When You Are Covered by More Than One Insurer A healthcare coverage plan is considered the primary plan and its benefits will be paid first if: • the plan does not use similar COB rules to determine coverage; or • the plan does not have a COB provision; or • The plan has similar the COB rules and is determined to be primary under the order of benefit determination rules described below. Benefits under another plan include all benefits that would be paid if claims had been initially submitted under that plan. The following factors are used to determine which plan is primary and which plan is • if you are the main subscriber or a dependent; • if you are married, which spouse was born earlier in the year; • the length of time each spouse has been covered under the plan; • if a parental custody or divorce decree applies; or • if Medicare is your other coverage then Medicare guidelines will apply. These factors make up the order of benefit determination rules, described in greater detail below: