Wind Project Information Sample Clauses

Wind Project Information. Wind Project: Nameplate capacity: 218 MW Location: Xxxxxx County, Texas Turbine type and manufacturer: GE 1.85 MW wind turbine generators Number of turbines: 118 Commercial Operation Date (or Expected Commercial Operation Date) of Wind Project: Expected June 30, 2014 Permits & Governmental Approvals: See attached Appendix C-1. Legal description of Wind Project site (i.e., real property description): Annex 7 to the ECCA is incorporated herein by reference. Document Date 1. WTG Federal Aviation Administration 7460-1 Determination of No Hazard to Navigation, Aeronautical Study Nos.: 2012-WTW10370 through 2012-WTW10379; 2012-WTW10383 through 2012-WTW10386;2012-WTW10392 through 2012-WTW10430; 2012-WTW10433 through 2012-WTW10473; 2012-WTW10476 through 2012-WTW10479; 2012-WTW10485 through 2012-WTW10493; 2012-WTW10506 through 2012-WTW10510; 2012-WTW10513 through 2012-WTW10515; 2012-WTW-10519 through 2012-WTW-10521. March 6, 2013 2013-WTW-2578 through 2013-WTW-2582; 2013-WTW-2590 through 2013-WTW-2592. June 13, 2013 2. Notice of Intent for Storm Water Discharges Associated with Construction Activity under TPDES General Permit June 28, 2013 3. Storm Water Pollution Prevention Plan for Construction Activities June 28, 2013 4. Xxxxxx County Road and Right of Way Crossing and Use Permit in connection with project infrastructure accessing, encroaching and crossing County Roads 13, 14, 15, 16, 17, R, S, T, U, V, W, X, Y, AA and BB. August 1, 2013 5. Texas Department of Transportation Approvals in connection with the project transmission line and buried electric cables crossing XX Xxxxxxx 000 xxx XX Xxxxxxx 0000. As further evidenced by Notice of Proposed Installation Application Nos.: XXX00000000000000, XXX00000000000000, XXX00000000000000 and XXX00000000000000 August 2, 2013 Texas Department of Transportation Approvals in connection with the project transmission line and buried electric cables crossing US Highway 60. As further evidenced by Notice of Proposed Installation Application Nos.: XXX00000000000000 and XXX00000000000000 July 31, 2013 Texas Department of Transportation Approval in connection with the buried fiber optic cable crossing under FM Highway 2385. As further evidenced by Notice of Proposed Installation Application No. XXX00000000000000. August 14, 2013 1. FERC Notice of Self-Certification of Exempt Wholesale Generator Status pursuant to Section 1262(6) of the Public Utility Holding Company Act of 2005 and 18 C.F.R. § 366.7(a) 2. Registration, filing and...
AutoNDA by SimpleDocs
Wind Project Information. Wind Project: Nameplate capacity: 149.5 MW Location: Xxxxxx County, Indiana Turbine type and manufacturer: Siemens SWT-2.3-108 wind turbine generators Number of turbines: 65 Commercial Operation Date (or Expected Commercial Operation Date) of Wind Project: Expected November 30, 2015 Permits & Governmental Approvals: See attached Appendix C-1. Legal description of Wind Project site (i.e., real property description): Annex 7 to the ECCA is incorporated herein by reference. Part I - Completed Permits 1. Xxxxxx County Conditional Use Permit for Wind Energy Generators November 08, 2007 and April 14, 2009 2. Extension of the Xxxxxx County Conditional Use Permit May 19, 2014 3. Xxxxxx County Improvement Location Permit April 10, 2015 Subject to Appeal 4. Xxxxxx County Drainage Board and County Surveyor Drainage Plan Approval March 17, 2015 5. Federal Fish and Wildlife Permit for Habitat Conservation Plan for Native Endangered Species Indiana Bat March 14, 2014 6. US Department of the Army Corps of Engineers nationwide Permit 33 CFR 330 temporary construction, access, and dewatering. December 15, 2014 7. Department of Natural Resources compliance with programmatic agreement December 5, 2014 8. FERC order authorizing disposition of jurisdictional facilities under Section 203 of the FPA, Docket No. EC14-42-000 March 20, 2014 9. IURC Approval of continued declination of commission’s jurisdiction and transfer of franchise works of Xxxxxx Ridge IV Wind Farm LLC to Pattern Energy Group. December 26, 2013 10. Order by the Indiana Utility Regulatory Commission (“IURC”) as applies to Pattern Energy Group – Cause No. 44438 May 7, 2014 11. WTG Federal Aviation Administration 7460-1 Determination of No Hazard to Navigation, Aeronautical Study Nos.: 2014-WTE-5314-OE through 2014-WTE-5318-OE; January 16, 2015 2014-WTE-5320-OE through 2014-WTE-5330-OE; 2014-WTE-5333-OE through 2014-WTE-5342-OE; 2014-WTE-5344-OE through 2014-WTE-5349-OE; and 2014-WTE-5351-OE through 2014-WTE-5333-OE 2014-WTE-5335-OE through 2014-WTE-5381-OE 2014-WTE-6483-OE 12. WTG Federal Aviation Administration 7460-1 Determination of No Hazard to Navigation, Aeronautical Study Nos.: 2014-WTE-5319-OE; 2014-WTE-5331-OE; 2014-WTE-5332-OE; and 2014-WTE-5343-OE February 9, 2015 13. WTG Federal Aviation Administration 7460-1 Determination of No Hazard to Navigation, Aeronautical Study No.: 2014-WTE-5350-OE February 19, 2015 14. Xxxxxx County Drainage Board approval of SWPPP plans April 14, 2015 15. Xxxxxx County Tra...
Wind Project Information. Wind Project: Nameplate capacity: 181.7 MW Location: Xxxxxx County, Texas Turbine type and manufacturer: Siemens 2.3 MW SWT-2.3-108 wind turbine generators Number of turbines: 79 Commercial Operation Date (or Expected Commercial Operation Date) of Wind Project: Expected November 14, 2014 Permits & Governmental Approvals: See attached Appendix C-1.
Wind Project Information. Wind Project: Expected nameplate capacity: 79.75 MW Location: Stillwater County, Montana Turbine manufacturer: Siemens Gamesa Renewable Energy, Inc. Number and type of turbines: 31 turbines (five SWT-2.3-108 wind turbine generators and twenty-six SWT-2.625-120 wind turbine generators) Commercial Operation Date of Wind Project: October 26, 2018 Permits & Governmental Approvals: See attached Appendix C-1 and Schedule 3.5. Legal description of Wind Project site (i.e., real property description): See attached Appendix C-2 and the meets-and-bounds description separately provided to Purchasers.
Wind Project Information. Wind Project: Expected nameplate capacity: 178.8 MW Location: Peace River Regional District of the Province of British Columbia Turbine type and manufacturer: General Electric Canada Number of turbines: 61 Commercial Operation Date (or Expected January 31, 2017 3. EAO Environmental Assessment Certificate #E14-01, issued by the Minister of Environment and Minister of Energy and Mines and Minister response for Core review, dated June 24, 2014, as amended by Amendment #1 to Certificate E14-01, dated January 15, 2015. 4. Land Use Proposal Approval from NAV Canada dated June 23, 2015. 5. Transport Canada Aeronautical Assessment Form for Obstruction Marking and Lighting from Transport Canada, dated February 24, 2015. 6. Occupant License to Cut L49747, issued by the British Columbia Ministry of Forests, Lands and National Resource Operations, dated October 8, 2013, as amended by Amendment Number 1, dated October 14, 2014. 7. Authorization for Vegetation Clearing under Section 52 of the Forest Act, British Columbia Ministry of Forests, Land and National Resource Operations and Ministry of Transportation and Infrastructure, dated March 27, 2015. 8. License for the use of explosives under Section 7 of the Explosives Act, Government of Canada, Department of Natural Resources. 9. Section 9 Notifications re Culverts (#145979) and Installation of Underground Collector Line Cables (#156862-167043) under the Water Act, submitted to the British Columbia Ministry of Forests, Lands and National Resource Operations and dated August 27, 2014 and February 17, 2015. 10. Inspection Permit for Archeological Investigation under the Heritage Conservation Act, issued by the British Columbia Ministry of Forests, Lands and National Resource Operations (as required by applicable Governmental Authority). 4. Crossing agreement (File X-208.6) dated April 14, 2015 between the Project Company and Centrica Energy. 5. Reciprocal master road use agreement dated April 14, 2015 between the Project Company and Centrica Energy. 6. Mutual existence agreement dated October 15, 2014 between the Project Company and Xxxx Xxxxxxx. Legal Description as set out in the Multi-Tenure Agreement: That parcel or tract of unsurveyed Crown land in the vicinity of Xxxxxx Creek (within Block A, 93-P-05 and Block D, 93-P-06), Peace River District containing 1,382.4 hectares more or less and shown on the sketch attached to the Multi-Tenure Agreement.
Wind Project Information. Wind Project: Expected nameplate capacity: 270 MW Location: Huron County, Ontario Turbine type and manufacturer: Siemens SWT 2.3-101 Number of turbines: 140 Commercial Operation Date (or Expected Commercial Operation Date) of Wind Project: Permits & Governmental Approvals: Expected May 30, 2015 Schedule 7.01(kk) (Material Permits) to the Credit Agreement is incorporated herein by reference. Legal description of Wind Project site (i.e., real property description): Schedules 7.01(aa)(1) (Easements) and 7.01(aa)(2) (Leases) to the Credict Agreement are incorporated herein by reference.
Wind Project Information. Wind Project: Expected nameplate capacity: 100 MW Location: Town of Lakeshore, Essex County, Province of Ontario Turbine type and manufacturer: SWT-3.2-113 Model, Siemens Canada Limited Number of turbines: 40 Commercial Operation Date of Wind Project: September 1, 2017 2. System Impact Assessment Report dated December 11, 2015 and System Impact Assessment Report Addendum dated June 24, 2016. 3. Renewable Energy Approval Number 2765-A4ER2P issued January 13, 2016. 4. NAV Canada – Land Use Proposal Submission Clearance Letters dated October 17, 2016 (NAV Canada File 16-2116). 5. Ministry of Tourism Culture and Sport – Heritage Act Archaeological Stage 1 Clearance Letter dated November 21, 2014. 6. Ministry of Tourism Culture and Sport – Heritage Act Archaeological Stage 2 Clearance Letter dated March 13, 2015. 7. Essex Region Conservation Authority permits no. 828-16, for certain works at CR-060 to CR-064 and CR-066; no. 827-16, for certain works at CR-070; and no. 826-16, for certain works at CR-080 to XX-000, XX-000, XX-000, XX-000 xxx XX-000 . 8. Town of Lakeshore permits no. 826-16, for certain works at XX-000, XX-000, XX-000 and CR-122; no. 827-16, for certain works at XX-000, XX-000 xx XX-000; and no. 829-16, for certain works at CR-051 and CR-078. 9. Leave to Construct (Section 92 of the Ontario Energy Board Act, 1998) dated September 22, 2016. 10. HONI Construction & Encroachment Agreement dated August 26, 2016 (HONI File No.: Rochester 635.06-5528). 11. HONI Construction & Encroachment Agreement dated August 26, 2016 (HONI File No.: Tilbury North 635.06-5529). 12. Belle River Species at Risk Approval Letter dated November 16, 2015. 13. IESO Notice to Proceed dated September 27, 2016.
AutoNDA by SimpleDocs
Wind Project Information. Wind Project: Nameplate capacity: 200.1 MW Location: Comanche County and Xxxxx County, Texas Turbine type and manufacturer: Siemens 2.3 MW SWT 2.3 108 wind turbine generators Number of turbines: 87 Commercial Operation Date (or Expected Commercial Operation Date) of Wind Project: Expected September 2015 Permits & Governmental Approvals: See attached Appendix C-1. Legal description of Wind Project site (i.e., real property description): Annex 7 to the ECCA is incorporated herein by reference. Document Date 1. Ninety-two (92) “Determination of No Hazard” letters, which correspond to Aeronautical Study Numbers: DNH Issue Dates: 2012-WTW-11450-OE through 2012-WTW-11455-OE, June 3, 2013 ASN: 2012-WTW-11466-OE through 2012-WTW-11472-OE, 2012-WTW-11475-OE through 2012-WTW-11477-OE, 2012-WTW-11483-OE through 2012-WTW-11484-OE, 2012-WTW-11490-OE through 2012-WTW-11491-OE, 2012-WTW-11493-OE, 2012-WTW-11495-OE, 2012-WTW-11497-OE through 2012-WTW-11502-OE, 2012-WTW-11509-OE, 2012-WTW-11514-OE, 2012-WTW-11516-OE through 2012-WTW-11517-OE, 2012-WTW-11519-OE through 2012-WTW-11533-OE, 2012-WTW-11535-OE through 2012-WTW-11537-OE February 20, 2013 2013-WTW-7264-OE , 2013-WTW-7274-OE through 0000-XXX-0000-XX , 0000-XXX-0000-XX, 0000-XXX-0000-XX , 0000-XXX-0000-XX through 2013-WTW-7298-OE , 2013-WTW-7300-OE through 2013-WTW-7302-OE , 2013-WTW-7796-OE through 2013-WTW-7797-OE , 2013-WTW-7799-OE through 0000-XXX-0000-XX , 0000-XXX-0000-XX , 0000-XXX-0000-XX through 2013-WTW-7811-OE , 2013-WTW-7813-OE through 2013-WTW-7818-OE November 14, 2013 2014-WTW-321-OE through 2014-WTW-323-OE February 12, 2014 2014-WTW-648-OE through 2014-WTW-650-OE April 15, 2014 2014-WTW-1100-OE April 24, 2014 2014-WTW-4138-OE May 27, 2014 2014-WTW-3841-OE through 2014-WTW-3842-OE May 30, 2014 2014-WTW-3839-OE, 2014-WTW-3843-OE, 2014-WTW-4173-OE June 18, 2014 2013-WTW-6156-OE for one 262-foot tall meteorological tower August 16, 2013 2. Forty-Four (44) “Extension” letters, which correspond to the following Aeronautical Study Numbers ASN: 2012-WTW-11466-OE through 2012-WTW-11472-OE, 2012-WTW-11475-OE through 2012-WTW-11477-OE, 2012-WTW-11483-OE through 2012-WTW-11484-OE, 2012-WTW-11490-OE through 2012-WTW-11491-OE, 2012-WTW-11493-OE, 2012-WTW-11495-OE, 2012-WTW-11497-OE through 2012-WTW-11502-OE, 2012-WTW-11509-OE, 2012-WTW-11514-OE, 2012-WTW-11516-OE through 2012-WTW-11517-OE, 2012-WTW-11519-OE through 2012-WTW-11533-OE, 2012-WTW-11535-OE through 2012-WTW-11537-OE September 18, 2014 3. Six (6) “Extensi...
Wind Project Information. Wind Project: Expected nameplate capacity: 143.2 MW Location: Province of Quebec, in particular in the Municipalities of Saint-Xxxxxxxxx (MRC de Lotbinière), Saint Séverin (MRC Xxxxxx-Cliche), Saint Xxxxxxxx (MRC Xxxxxx-Cliche) and Sacré-Coeur-De-Xxxxx (MRC des Appalaches) Turbine type and manufacturer: Siemens 3.2 Direct Drive, 113 Meter Rotor Diameter; Siemens Wind Power Limited Number of turbines: 46 Commercial Operation Date (or Expected Commercial Operation Date) of Wind Project: December 1, 2017 (expected).
Wind Project Information. Wind Project: Expected nameplate capacity: 220.5 MW Location: Xxxxx County, New Mexico Turbine manufacturer: Siemens Gamesa Renewable Energy, Inc. (f/k/a Siemens Wind Power, Inc.) Number and type of turbines: 84 SWT-2.625-120 wind turbine generators Permits & Governmental Approvals: See attached Appendix C-1 and Schedule 3.5. Legal description of Wind Project site (i.e., real property description): See attached Appendix C-2. 1556004.16-WASSR01A - MSW 1556004.16-WASSR01A - MSW 1556004.16-WASSR01A - MSW 1556004.16-WASSR01A - MSW 1556004.16-WASSR01A - MSW 1556004.16-WASSR01A - MSW 1556004.16-WASSR01A - MSW 1556004.16-WASSR01A - MSW 1556004.16-WASSR01A - MSW 1556004.16-WASSR01A - MSW 1556004.16-WASSR01A - MSW 1556004.16-WASSR01A - MSW TRACT 1: THE SOUTH HALF (S/2) OF SECTION SEVEN (7) IN TOWNSHIP SEVEN NORTH (T7N) OF RANGE THIRTY-FIVE EAST (R35E), N.M.P.M., XXXXX COUNTY, NEW MEXICO. TRACT 2 (LEASE TRACT 6): THE EAST HALF (E/2) OF SECTION TWELVE (12) IN TOWNSHIP SEVEN NORTH (T7N) OF RANGE THIRTY-FOUR EAST (R34E), N.M.P.M., XXXXX COUNTY, NEW MEXICO. TRACT 3 (LEASE TRACT 7): A TRACT OF LAND IN SECTION THIRTEEN (13), XXXXXXXX XXXXX, XXXXX (X0X), XXXXX XXXXXX-XXXX, XXXX (X00X), N.M.P.M., XXXXX COUNTY, NEW MEXICO, AND BEING DESCRIBED AS FOLLOWS: BEGINNING AT THE XXXXXXXXX XXXXXX XX XXXX XXXXXXX 00, X0X, X00X. THENCE N89°44’47”E ALONG THE NORTH LINE OF SAID SECTION 13 AND ALONGSIDE AN EXISTING FENCE LINE, A DISTANCE OF 5328.59 FEET TO THE NORTHEAST CORNER OF SAID SECTION 13; THENCE S00°00’09”E ALONG THE EAST LINE OF SAID SECTION 13, A DISTANCE OF 4300.52 FEET TO A POINT ON SAID EAST LINE OF SECTION 13; THENCE N89°46’52”W AND ALONGSIDE EXISTING FENCE LINES, A DISTANCE OF 5320.78 FEET TO A POINT ON THE WEST LINE OF SAID SECTION 13; THENCE N00°06’27”W ALONG SAID WEST LINE OF SECTION 13, A DISTANCE OF 4256.63 FEET TO THE POINT OF BEGINNING. TRACT 1: THE SOUTHWEST QUARTER (SW/4) OF SECTION TWENTY-SEVEN (27) IN TOWNSHIP SEVEN NORTH (T7N) OF RANGE THIRTY-FIVE EAST (R35E), N.M.P.M., XXXXX COUNTY, NEW MEXICO. TRACT 2: 1556004.16-WASSR01A - MSW THE SOUTH HALF (S/2) OF SECTION TWENTY-ONE (21) IN TOWNSHIP SEVEN NORTH (T7N) OF RANGE THIRTY-FIVE EAST (R35E), N.M.P.M., XXXXX COUNTY, NEW MEXICO. THE EAST HALF OF THE SOUTHWEST QUARTER (E/2SW/4) OF SECTION THIRTY-THREE (33) TOWNSHIP SEVEN NORTH (T7N), RANGE THIRTY-FIVE EAST (R35E), N.M.P.M., XXXXX COUNTY, NEW MEXICO. TRACT 1 (Lease Tract 4): THE NORTHEAST QUARTER (NE/4) OF SECTION FOUR (4) IN TOWNSHIP SIX NORTH (T6N) OF RANGE THIRTY-F...
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!