FIRST AMENDMENT TO LEASE
Exhibit 1.1
FIRST AMENDMENT TO LEASE
THIS FIRST AMENDMENT TO LEASE (“First Amendment”) dated this 3rd day of May, 2022 (the “First Amendment Effective Date”) is by and between ALACHUA FOUNDATION PARK HOLDING COMPANY II, LLC, a Florida limited liability company (“Landlord”) and APPLIED GENETICS TECHNOLOGIES CORPORATION, a Delaware corporation (“Tenant”) (together, the “Parties”).
W I T N E S S E T H:
A. Landlord and Tenant are parties to that certain Lease for Foundation Park by and between Landlord and Tenant dated May 13, 2021 (the “Lease”). Pursuant to the Lease, Tenant entered into a lease for Building II, Foundation Park, Alachua, Alachua County, Florida (the “Premises”), as more particularly described in the Lease (the “Project”).
B. Landlord and Tenant wish to modify the terms of the Lease to: (i) confirm their agreement regarding final plans and specifications; (ii) revising certain dates, including the Anticipated Commencement Date and Outside Commencement Date; (iii) revise the Landlord Allowance and schedule of Fixed Annual Rent; and (iv) address other matters in the Lease, all as more fully set forth herein.
NOW, THEREFORE, in consideration of the mutual promises herein contained and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged by the Parties, Landlord and Tenant hereby agree as follows:
1. Recitals. All recitals set forth above are true and correct and are incorporated hereby reference.
2. Modifications to Lease Dates.
a. | The Initial Term, as reflected in Section 1(D) of the Lease, is hereby revised from “Two Hundred Forty (240) months from the Commencement Date” to “Two Hundred Forty One (241) months from the Commencement Date”; |
b. | The Anticipated Commencement Date, as reflected in Section 1(G) of the Lease, is revised from “May 2, 2022” to “November 30, 2022” with all other terms in Section 1(G) remaining unchanged; and |
c. | The Outside Commencement Date, as reflected in Section 1(H) of the Lease, is revised from “June 7, 2022” to “December 30, 2022”, with all other terms in Section 1(H) remaining unchanged. |
Tenant acknowledges and agrees that the date revisions set forth in this Section 2 and Section 6 of this First Amendment are not the result of a Landlord Delay (as defined in the Lease), and that no concessions arise in favor of Tenant as a result of such revisions.
1
3. Fixed Annual Rent. The Fixed Annual Rent, as defined in Section 1(J) of the Lease, and described in Section 7 and more fully set forth in Exhibit “C” of the Lease, is hereby revised such that Exhibit “C” of the Lease is deleted in its entirety and replaced with Exhibit “C” attached to this First Amendment.
4. Plans and Specifications.
The Plans and Specifications, as such term is defined in Section 1(O) of the Lease, and as more fully described in Exhibit “E” of the Lease, is hereby revised such that Exhibit “E” of the Lease is deleted in its entirety and replaced with those certain architectural plans and specifications prepared by RS&H dated June 18, 2021, June 21, 2021, and December 23, 2021, and Contractor’s Value Engineering log dated November 19, 2021, all of which are attached to this First Amendment as Exhibit “E”. The Parties acknowledge and agree that the Plans and Specifications attached as Exhibit “E” to this First Amendment are agreed upon by all Parties as being final and not subject to further revision, except as otherwise provided in the Lease.
5. Allowance.
a. | The Allowance as defined in Section 1(W) of the Lease and referenced in Exhibit “B-1”, Section 11(B), and elsewhere in the Lease, is hereby increased from $6,000,000.00 to $8,000,000.00. |
b. | The Parties acknowledge and agree that the current budget for the Fitout Cost is $10,920,525.00 and accordingly, the Tenant’s Cost Contribution will be $2,920,525.00. Within thirty (30) days following the First Amendment Effective Date, Tenant agrees to deposit Tenant’s Cost Contribution with the Escrow Agent; provided, however, that if the Parties have not established an escrow account with the Escrow Agent within such thirty (30) day period following the First Amendment Effective Date, the Parties acknowledge and agree that Tenant shall deposit Tenant’s Cost Contribution with the Escrow Agent within five (5) days following the establishment of an escrow account with the Escrow Agent. |
c. | The Parties acknowledge and agree that the Fitout Cost may be subject to revision based upon Change Orders as provided in the Lease, which provisions shall remain in full force and effect. |
6. Landlord’s Notice Address. The Landlord’s Notice Address in Section 1(Z) of the Lease shall be replaced with the following:
0000 XX 00xx Xxxxx, Xxxxx 000
Xxxxxxxxxxx, XX 00000
Attn: Xxxxx X. Xxxxxxxx
With a copy to:
0000 Xxxxx Xxxxxxx Xxxx., Xxxxx 000
Xxxxx Xxxxx Xxxxx, XX 00000
Attn: General Counsel
2
7. Termination by Tenant. In light of amendments made to the Lease pursuant to Section 2 of this First Amendment, the Parties hereby agree that the reference to “December 31, 2022” in Section 11(G) of the Lease is hereby deleted in its entirety and replaced with “June 30, 2023”.
8. Performance by Landlord and Tenant. By execution of this First Amendment, each Party warrants, represents, acknowledges and agrees that the other Party hereto has performed each and every obligation of such party pursuant to the Lease as same has been amended from time to time and that there are no defaults (or circumstances which with notice and passage of time would constitute defaults) by either party under the Lease, or if there have been defaults, then such defaults are waived in consideration of the execution of this First Amendment.
9. Covenants Binding. It is mutually agreed that all covenants, conditions and agreements set forth in the Lease (as hereby amended) shall remain binding upon the Parties and inure to the benefit of the Parties and their respective successors and assigns.
10. Continuing Force and Effect. Except as modified hereby, all other terms and conditions of the Lease shall remain unchanged and in full force and effect and are hereby ratified and confirmed by the Parties.
11. Defined Terms. Except as otherwise expressly provided herein, all capitalized terms used in this First Amendment shall have the meanings ascribed to them in the Lease.
12. Entire Agreement. This First Amendment together with the Lease constitutes the entire agreement between Landlord and Tenant regarding the subject matter hereof and supersedes all prior negotiations, discussions, term sheets, understandings, and agreements, whether oral or written, between the Parties with respect to the subject matter hereof.
13. Conflicts/Amendment to Control. Any inconsistencies or conflicts between the terms and provisions of the Lease and the terms and provisions of this First Amendment shall be resolved in favor of the terms and provisions of this First Amendment.
14. Writing Required. This First Amendment shall not be modified except in writing and signed by the Parties.
15. Broker. Any fees due to Brokers shall be the responsibility of Landlord.
16. Counterparts. This First Amendment may be executed in several counterparts, each of which shall be deemed an original, and all of such counterparts together shall constitute one and the same instrument. Delivery of a counterpart by electronic means shall be valid and binding for all purposes.
The remainder of this page intentionally left blank.
3
IN WITNESS WHEREOF, the Parties have executed this First Amendment to Lease on the date indicated above.
Landlord: | ||
ALACHUA FOUNDATION PARK HOLDING COMPANY II, LLC, a Florida limited liability company | ||
By: | /s/ Xxxxx X. Xxxxxxxx | |
Print Name: Xxxxx X. Xxxxxxxx | ||
Its: Manager | ||
Tenant: | ||
APPLIED GENETICS TECHNOLOGIES CORPORATION, | ||
a Delaware corporation | ||
By: | /s/ Xxxxx Washer | |
Print Name: Xxxxx Washer | ||
Its: Chief Executive Officer |
4
Exhibit “C”
Schedule of Fixed Annual Rent
5
Exhibit C - Schedule of Fixed Annual Rent
Lease Month | Fixed Annual Rent | Fixed Annual Rent Per Square Foot |
Fixed Annual Rent Monthly Payment |
|||||||||||
1 | $ | 0.00 | $ | 0.00 | $ | 0.00 | ||||||||
2 | $ | 743,750.00 | $ | 35.00 | $ | 61,979.17 | ||||||||
3 | $ | 743,750.00 | $ | 35.00 | $ | 61,979.17 | ||||||||
4 | $ | 743,750.00 | $ | 35.00 | $ | 61,979.17 | ||||||||
5 | $ | 743,750.00 | $ | 35.00 | $ | 61,979.17 | ||||||||
6 | $ | 743,750.00 | $ | 35.00 | $ | 61,979.17 | ||||||||
7 | $ | 743,750.00 | $ | 35.00 | $ | 61,979.17 | ||||||||
8 | $ | 1,336,625.00 | $ | 62.90 | $ | 111,385.42 | ||||||||
9 | $ | 1,336,625.00 | $ | 62.90 | $ | 111,385.42 | ||||||||
10 | $ | 1,336,625.00 | $ | 62.90 | $ | 111,385.42 | ||||||||
11 | $ | 1,336,625.00 | $ | 62.90 | $ | 111,385.42 | ||||||||
12 | $ | 1,336,625.00 | $ | 62.90 | $ | 111,385.42 | ||||||||
13 | $ | 1,336,625.00 | $ | 62.90 | $ | 111,385.42 | ||||||||
14 | $ | 1,336,625.00 | $ | 62.90 | $ | 111,385.42 | ||||||||
15 | $ | 1,336,625.00 | $ | 62.90 | $ | 111,385.42 | ||||||||
16 | $ | 1,336,625.00 | $ | 62.90 | $ | 111,385.42 | ||||||||
17 | $ | 1,336,625.00 | $ | 62.90 | $ | 111,385.42 | ||||||||
18 | $ | 1,336,625.00 | $ | 62.90 | $ | 111,385.42 | ||||||||
19 | $ | 1,336,625.00 | $ | 62.90 | $ | 111,385.42 | ||||||||
20 | $ | 1,356,387.50 | $ | 63.83 | $ | 113,032.29 | ||||||||
21 | $ | 1,356,387.50 | $ | 63.83 | $ | 113,032.29 | ||||||||
22 | $ | 1,356,387.50 | $ | 63.83 | $ | 113,032.29 | ||||||||
23 | $ | 1,356,387.50 | $ | 63.83 | $ | 113,032.29 | ||||||||
24 | $ | 1,356,387.50 | $ | 63.83 | $ | 113,032.29 | ||||||||
25 | $ | 1,356,387.50 | $ | 63.83 | $ | 113,032.29 | ||||||||
26 | $ | 1,356,387.50 | $ | 63.83 | $ | 113,032.29 | ||||||||
27 | $ | 1,356,387.50 | $ | 63.83 | $ | 113,032.29 | ||||||||
28 | $ | 1,356,387.50 | $ | 63.83 | $ | 113,032.29 | ||||||||
29 | $ | 1,356,387.50 | $ | 63.83 | $ | 113,032.29 | ||||||||
30 | $ | 1,356,387.50 | $ | 63.83 | $ | 113,032.29 | ||||||||
31 | $ | 1,356,387.50 | $ | 63.83 | $ | 113,032.29 | ||||||||
32 | $ | 1,376,575.00 | $ | 64.78 | $ | 114,714.58 | ||||||||
33 | $ | 1,376,575.00 | $ | 64.78 | $ | 114,714.58 | ||||||||
34 | $ | 1,376,575.00 | $ | 64.78 | $ | 114,714.58 | ||||||||
35 | $ | 1,376,575.00 | $ | 64.78 | $ | 114,714.58 | ||||||||
36 | $ | 1,376,575.00 | $ | 64.78 | $ | 114,714.58 | ||||||||
37 | $ | 1,376,575.00 | $ | 64.78 | $ | 114,714.58 | ||||||||
38 | $ | 1,376,575.00 | $ | 64.78 | $ | 114,714.58 | ||||||||
39 | $ | 1,376,575.00 | $ | 64.78 | $ | 114,714.58 | ||||||||
40 | $ | 1,376,575.00 | $ | 64.78 | $ | 114,714.58 | ||||||||
41 | $ | 1,376,575.00 | $ | 64.78 | $ | 114,714.58 | ||||||||
42 | $ | 1,376,575.00 | $ | 64.78 | $ | 114,714.58 | ||||||||
43 | $ | 1,376,575.00 | $ | 64.78 | $ | 114,714.58 |
Exhibit C - Schedule of Fixed Annual Rent
Lease Month | Fixed Annual Rent | Fixed Annual Rent Per Square Foot |
Fixed Annual Rent Monthly Payment |
|||||||||||
44 | $ | 1,397,187.50 | $ | 65.75 | $ | 116,432.29 | ||||||||
45 | $ | 1,397,187.50 | $ | 65.75 | $ | 116,432.29 | ||||||||
46 | $ | 1,397,187.50 | $ | 65.75 | $ | 116,432.29 | ||||||||
47 | $ | 1,397,187.50 | $ | 65.75 | $ | 116,432.29 | ||||||||
48 | $ | 1,397,187.50 | $ | 65.75 | $ | 116,432.29 | ||||||||
49 | $ | 1,397,187.50 | $ | 65.75 | $ | 116,432.29 | ||||||||
50 | $ | 1,397,187.50 | $ | 65.75 | $ | 116,432.29 | ||||||||
51 | $ | 1,397,187.50 | $ | 65.75 | $ | 116,432.29 | ||||||||
52 | $ | 1,397,187.50 | $ | 65.75 | $ | 116,432.29 | ||||||||
53 | $ | 1,397,187.50 | $ | 65.75 | $ | 116,432.29 | ||||||||
54 | $ | 1,397,187.50 | $ | 65.75 | $ | 116,432.29 | ||||||||
55 | $ | 1,397,187.50 | $ | 65.75 | $ | 116,432.29 | ||||||||
56 | $ | 1,418,012.50 | $ | 66.73 | $ | 118,167.71 | ||||||||
57 | $ | 1,418,012.50 | $ | 66.73 | $ | 118,167.71 | ||||||||
58 | $ | 1,418,012.50 | $ | 66.73 | $ | 118,167.71 | ||||||||
59 | $ | 1,418,012.50 | $ | 66.73 | $ | 118,167.71 | ||||||||
60 | $ | 1,418,012.50 | $ | 66.73 | $ | 118,167.71 | ||||||||
61 | $ | 1,418,012.50 | $ | 66.73 | $ | 118,167.71 | ||||||||
62 | $ | 1,418,012.50 | $ | 66.73 | $ | 118,167.71 | ||||||||
63 | $ | 1,418,012.50 | $ | 66.73 | $ | 118,167.71 | ||||||||
64 | $ | 1,418,012.50 | $ | 66.73 | $ | 118,167.71 | ||||||||
65 | $ | 1,418,012.50 | $ | 66.73 | $ | 118,167.71 | ||||||||
66 | $ | 1,418,012.50 | $ | 66.73 | $ | 118,167.71 | ||||||||
67 | $ | 1,418,012.50 | $ | 66.73 | $ | 118,167.71 | ||||||||
68 | $ | 1,439,050.00 | $ | 67.72 | $ | 119,920.83 | ||||||||
69 | $ | 1,439,050.00 | $ | 67.72 | $ | 119,920.83 | ||||||||
70 | $ | 1,439,050.00 | $ | 67.72 | $ | 119,920.83 | ||||||||
71 | $ | 1,439,050.00 | $ | 67.72 | $ | 119,920.83 | ||||||||
72 | $ | 1,439,050.00 | $ | 67.72 | $ | 119,920.83 | ||||||||
73 | $ | 1,439,050.00 | $ | 67.72 | $ | 119,920.83 | ||||||||
74 | $ | 1,439,050.00 | $ | 67.72 | $ | 119,920.83 | ||||||||
75 | $ | 1,439,050.00 | $ | 67.72 | $ | 119,920.83 | ||||||||
76 | $ | 1,439,050.00 | $ | 67.72 | $ | 119,920.83 | ||||||||
77 | $ | 1,439,050.00 | $ | 67.72 | $ | 119,920.83 | ||||||||
78 | $ | 1,439,050.00 | $ | 67.72 | $ | 119,920.83 | ||||||||
79 | $ | 1,439,050.00 | $ | 67.72 | $ | 119,920.83 | ||||||||
80 | $ | 1,460,512.50 | $ | 68.73 | $ | 121,709.38 | ||||||||
81 | $ | 1,460,512.50 | $ | 68.73 | $ | 121,709.38 | ||||||||
82 | $ | 1,460,512.50 | $ | 68.73 | $ | 121,709.38 | ||||||||
83 | $ | 1,460,512.50 | $ | 68.73 | $ | 121,709.38 | ||||||||
84 | $ | 1,460,512.50 | $ | 68.73 | $ | 121,709.38 | ||||||||
85 | $ | 1,460,512.50 | $ | 68.73 | $ | 121,709.38 | ||||||||
86 | $ | 1,460,512.50 | $ | 68.73 | $ | 121,709.38 | ||||||||
87 | $ | 1,460,512.50 | $ | 68.73 | $ | 121,709.38 | ||||||||
88 | $ | 1,460,512.50 | $ | 68.73 | $ | 121,709.38 |
Exhibit C - Schedule of Fixed Annual Rent
Lease Month | Fixed Annual Rent | Fixed Annual Rent Per Square Foot |
Fixed Annual Rent Monthly Payment |
|||||||||||
89 | $ | 1,460,512.50 | $ | 68.73 | $ | 121,709.38 | ||||||||
90 | $ | 1,460,512.50 | $ | 68.73 | $ | 121,709.38 | ||||||||
91 | $ | 1,460,512.50 | $ | 68.73 | $ | 121,709.38 | ||||||||
92 | $ | 1,482,187.50 | $ | 69.75 | $ | 123,515.63 | ||||||||
93 | $ | 1,482,187.50 | $ | 69.75 | $ | 123,515.63 | ||||||||
94 | $ | 1,482,187.50 | $ | 69.75 | $ | 123,515.63 | ||||||||
95 | $ | 1,482,187.50 | $ | 69.75 | $ | 123,515.63 | ||||||||
96 | $ | 1,482,187.50 | $ | 69.75 | $ | 123,515.63 | ||||||||
97 | $ | 1,482,187.50 | $ | 69.75 | $ | 123,515.63 | ||||||||
98 | $ | 1,482,187.50 | $ | 69.75 | $ | 123,515.63 | ||||||||
99 | $ | 1,482,187.50 | $ | 69.75 | $ | 123,515.63 | ||||||||
100 | $ | 1,482,187.50 | $ | 69.75 | $ | 123,515.63 | ||||||||
101 | $ | 1,482,187.50 | $ | 69.75 | $ | 123,515.63 | ||||||||
102 | $ | 1,482,187.50 | $ | 69.75 | $ | 123,515.63 | ||||||||
103 | $ | 1,482,187.50 | $ | 69.75 | $ | 123,515.63 | ||||||||
104 | $ | 1,504,287.50 | $ | 70.79 | $ | 125,357.29 | ||||||||
105 | $ | 1,504,287.50 | $ | 70.79 | $ | 125,357.29 | ||||||||
106 | $ | 1,504,287.50 | $ | 70.79 | $ | 125,357.29 | ||||||||
107 | $ | 1,504,287.50 | $ | 70.79 | $ | 125,357.29 | ||||||||
108 | $ | 1,504,287.50 | $ | 70.79 | $ | 125,357.29 | ||||||||
109 | $ | 1,504,287.50 | $ | 70.79 | $ | 125,357.29 | ||||||||
110 | $ | 1,504,287.50 | $ | 70.79 | $ | 125,357.29 | ||||||||
111 | $ | 1,504,287.50 | $ | 70.79 | $ | 125,357.29 | ||||||||
112 | $ | 1,504,287.50 | $ | 70.79 | $ | 125,357.29 | ||||||||
113 | $ | 1,504,287.50 | $ | 70.79 | $ | 125,357.29 | ||||||||
114 | $ | 1,504,287.50 | $ | 70.79 | $ | 125,357.29 | ||||||||
115 | $ | 1,504,287.50 | $ | 70.79 | $ | 125,357.29 | ||||||||
116 | $ | 1,526,600.00 | $ | 71.84 | $ | 127,216.67 | ||||||||
117 | $ | 1,526,600.00 | $ | 71.84 | $ | 127,216.67 | ||||||||
118 | $ | 1,526,600.00 | $ | 71.84 | $ | 127,216.67 | ||||||||
119 | $ | 1,526,600.00 | $ | 71.84 | $ | 127,216.67 | ||||||||
120 | $ | 1,526,600.00 | $ | 71.84 | $ | 127,216.67 | ||||||||
121 | $ | 1,526,600.00 | $ | 71.84 | $ | 127,216.67 | ||||||||
122 | $ | 1,526,600.00 | $ | 71.84 | $ | 127,216.67 | ||||||||
123 | $ | 1,526,600.00 | $ | 71.84 | $ | 127,216.67 | ||||||||
124 | $ | 1,526,600.00 | $ | 71.84 | $ | 127,216.67 | ||||||||
125 | $ | 1,526,600.00 | $ | 71.84 | $ | 127,216.67 | ||||||||
126 | $ | 1,526,600.00 | $ | 71.84 | $ | 127,216.67 | ||||||||
127 | $ | 1,526,600.00 | $ | 71.84 | $ | 127,216.67 | ||||||||
128 | $ | 1,549,337.50 | $ | 72.91 | $ | 129,111.46 | ||||||||
129 | $ | 1,549,337.50 | $ | 72.91 | $ | 129,111.46 | ||||||||
130 | $ | 1,549,337.50 | $ | 72.91 | $ | 129,111.46 | ||||||||
131 | $ | 1,549,337.50 | $ | 72.91 | $ | 129,111.46 | ||||||||
132 | $ | 1,549,337.50 | $ | 72.91 | $ | 129,111.46 | ||||||||
133 | $ | 1,549,337.50 | $ | 72.91 | $ | 129,111.46 |
Exhibit C - Schedule of Fixed Annual Rent
Lease Month | Fixed Annual Rent | Fixed Annual Rent Per Square Foot |
Fixed Annual Rent Monthly Payment |
|||||||||||
134 | $ | 1,549,337.50 | $ | 72.91 | $ | 129,111.46 | ||||||||
135 | $ | 1,549,337.50 | $ | 72.91 | $ | 129,111.46 | ||||||||
136 | $ | 1,549,337.50 | $ | 72.91 | $ | 129,111.46 | ||||||||
137 | $ | 1,549,337.50 | $ | 72.91 | $ | 129,111.46 | ||||||||
138 | $ | 1,549,337.50 | $ | 72.91 | $ | 129,111.46 | ||||||||
139 | $ | 1,549,337.50 | $ | 72.91 | $ | 129,111.46 | ||||||||
140 | $ | 1,572,500.00 | $ | 74.00 | $ | 131,041.67 | ||||||||
141 | $ | 1,572,500.00 | $ | 74.00 | $ | 131,041.67 | ||||||||
142 | $ | 1,572,500.00 | $ | 74.00 | $ | 131,041.67 | ||||||||
143 | $ | 1,572,500.00 | $ | 74.00 | $ | 131,041.67 | ||||||||
144 | $ | 1,572,500.00 | $ | 74.00 | $ | 131,041.67 | ||||||||
145 | $ | 1,572,500.00 | $ | 74.00 | $ | 131,041.67 | ||||||||
146 | $ | 1,572,500.00 | $ | 74.00 | $ | 131,041.67 | ||||||||
147 | $ | 1,572,500.00 | $ | 74.00 | $ | 131,041.67 | ||||||||
148 | $ | 1,572,500.00 | $ | 74.00 | $ | 131,041.67 | ||||||||
149 | $ | 1,572,500.00 | $ | 74.00 | $ | 131,041.67 | ||||||||
150 | $ | 1,572,500.00 | $ | 74.00 | $ | 131,041.67 | ||||||||
151 | $ | 1,572,500.00 | $ | 74.00 | $ | 131,041.67 | ||||||||
152 | $ | 1,595,875.00 | $ | 75.10 | $ | 132,989.58 | ||||||||
153 | $ | 1,595,875.00 | $ | 75.10 | $ | 132,989.58 | ||||||||
154 | $ | 1,595,875.00 | $ | 75.10 | $ | 132,989.58 | ||||||||
155 | $ | 1,595,875.00 | $ | 75.10 | $ | 132,989.58 | ||||||||
156 | $ | 1,595,875.00 | $ | 75.10 | $ | 132,989.58 | ||||||||
157 | $ | 1,595,875.00 | $ | 75.10 | $ | 132,989.58 | ||||||||
158 | $ | 1,595,875.00 | $ | 75.10 | $ | 132,989.58 | ||||||||
159 | $ | 1,595,875.00 | $ | 75.10 | $ | 132,989.58 | ||||||||
160 | $ | 1,595,875.00 | $ | 75.10 | $ | 132,989.58 | ||||||||
161 | $ | 1,595,875.00 | $ | 75.10 | $ | 132,989.58 | ||||||||
162 | $ | 1,595,875.00 | $ | 75.10 | $ | 132,989.58 | ||||||||
163 | $ | 1,595,875.00 | $ | 75.10 | $ | 132,989.58 | ||||||||
164 | $ | 1,619,675.00 | $ | 76.22 | $ | 134,972.92 | ||||||||
165 | $ | 1,619,675.00 | $ | 76.22 | $ | 134,972.92 | ||||||||
166 | $ | 1,619,675.00 | $ | 76.22 | $ | 134,972.92 | ||||||||
167 | $ | 1,619,675.00 | $ | 76.22 | $ | 134,972.92 | ||||||||
168 | $ | 1,619,675.00 | $ | 76.22 | $ | 134,972.92 | ||||||||
169 | $ | 1,619,675.00 | $ | 76.22 | $ | 134,972.92 | ||||||||
170 | $ | 1,619,675.00 | $ | 76.22 | $ | 134,972.92 | ||||||||
171 | $ | 1,619,675.00 | $ | 76.22 | $ | 134,972.92 | ||||||||
172 | $ | 1,619,675.00 | $ | 76.22 | $ | 134,972.92 | ||||||||
173 | $ | 1,619,675.00 | $ | 76.22 | $ | 134,972.92 | ||||||||
174 | $ | 1,619,675.00 | $ | 76.22 | $ | 134,972.92 | ||||||||
175 | $ | 1,619,675.00 | $ | 76.22 | $ | 134,972.92 | ||||||||
176 | $ | 1,643,687.50 | $ | 77.35 | $ | 136,973.96 | ||||||||
177 | $ | 1,643,687.50 | $ | 77.35 | $ | 136,973.96 | ||||||||
178 | $ | 1,643,687.50 | $ | 77.35 | $ | 136,973.96 |
Exhibit C - Schedule of Fixed Annual Rent
Lease Month | Fixed Annual Rent | Fixed Annual Rent Per Square Foot |
Fixed Annual Rent Monthly Payment |
|||||||||||
179 | $ | 1,643,687.50 | $ | 77.35 | $ | 136,973.96 | ||||||||
180 | $ | 1,643,687.50 | $ | 77.35 | $ | 136,973.96 | ||||||||
181 | $ | 1,643,687.50 | $ | 77.35 | $ | 136,973.96 | ||||||||
182 | $ | 1,643,687.50 | $ | 77.35 | $ | 136,973.96 | ||||||||
183 | $ | 1,643,687.50 | $ | 77.35 | $ | 136,973.96 | ||||||||
184 | $ | 1,643,687.50 | $ | 77.35 | $ | 136,973.96 | ||||||||
185 | $ | 1,643,687.50 | $ | 77.35 | $ | 136,973.96 | ||||||||
186 | $ | 1,643,687.50 | $ | 77.35 | $ | 136,973.96 | ||||||||
187 | $ | 1,643,687.50 | $ | 77.35 | $ | 136,973.96 | ||||||||
188 | $ | 1,668,337.50 | $ | 78.51 | $ | 139,028.13 | ||||||||
189 | $ | 1,668,337.50 | $ | 78.51 | $ | 139,028.13 | ||||||||
190 | $ | 1,668,337.50 | $ | 78.51 | $ | 139,028.13 | ||||||||
191 | $ | 1,668,337.50 | $ | 78.51 | $ | 139,028.13 | ||||||||
192 | $ | 1,668,337.50 | $ | 78.51 | $ | 139,028.13 | ||||||||
193 | $ | 1,668,337.50 | $ | 78.51 | $ | 139,028.13 | ||||||||
194 | $ | 1,668,337.50 | $ | 78.51 | $ | 139,028.13 | ||||||||
195 | $ | 1,668,337.50 | $ | 78.51 | $ | 139,028.13 | ||||||||
196 | $ | 1,668,337.50 | $ | 78.51 | $ | 139,028.13 | ||||||||
197 | $ | 1,668,337.50 | $ | 78.51 | $ | 139,028.13 | ||||||||
198 | $ | 1,668,337.50 | $ | 78.51 | $ | 139,028.13 | ||||||||
199 | $ | 1,668,337.50 | $ | 78.51 | $ | 139,028.13 | ||||||||
200 | $ | 1,693,200.00 | $ | 79.68 | $ | 141,100.00 | ||||||||
201 | $ | 1,693,200.00 | $ | 79.68 | $ | 141,100.00 | ||||||||
202 | $ | 1,693,200.00 | $ | 79.68 | $ | 141,100.00 | ||||||||
203 | $ | 1,693,200.00 | $ | 79.68 | $ | 141,100.00 | ||||||||
204 | $ | 1,693,200.00 | $ | 79.68 | $ | 141,100.00 | ||||||||
205 | $ | 1,693,200.00 | $ | 79.68 | $ | 141,100.00 | ||||||||
206 | $ | 1,693,200.00 | $ | 79.68 | $ | 141,100.00 | ||||||||
207 | $ | 1,693,200.00 | $ | 79.68 | $ | 141,100.00 | ||||||||
208 | $ | 1,693,200.00 | $ | 79.68 | $ | 141,100.00 | ||||||||
209 | $ | 1,693,200.00 | $ | 79.68 | $ | 141,100.00 | ||||||||
210 | $ | 1,693,200.00 | $ | 79.68 | $ | 141,100.00 | ||||||||
211 | $ | 1,693,200.00 | $ | 79.68 | $ | 141,100.00 | ||||||||
212 | $ | 1,718,275.00 | $ | 80.86 | $ | 143,189.58 | ||||||||
213 | $ | 1,718,275.00 | $ | 80.86 | $ | 143,189.58 | ||||||||
214 | $ | 1,718,275.00 | $ | 80.86 | $ | 143,189.58 | ||||||||
215 | $ | 1,718,275.00 | $ | 80.86 | $ | 143,189.58 | ||||||||
216 | $ | 1,718,275.00 | $ | 80.86 | $ | 143,189.58 | ||||||||
217 | $ | 1,718,275.00 | $ | 80.86 | $ | 143,189.58 | ||||||||
218 | $ | 1,718,275.00 | $ | 80.86 | $ | 143,189.58 | ||||||||
219 | $ | 1,718,275.00 | $ | 80.86 | $ | 143,189.58 | ||||||||
220 | $ | 1,718,275.00 | $ | 80.86 | $ | 143,189.58 | ||||||||
221 | $ | 1,718,275.00 | $ | 80.86 | $ | 143,189.58 | ||||||||
222 | $ | 1,718,275.00 | $ | 80.86 | $ | 143,189.58 | ||||||||
223 | $ | 1,718,275.00 | $ | 80.86 | $ | 143,189.58 |
Exhibit C - Schedule of Fixed Annual Rent
Lease Month | Fixed Annual Rent | Fixed Annual Rent Per Square Foot |
Fixed Annual Rent Monthly Payment |
|||||||||||
224 | $ | 1,743,987.50 | $ | 82.07 | $ | 145,332.29 | ||||||||
225 | $ | 1,743,987.50 | $ | 82.07 | $ | 145,332.29 | ||||||||
226 | $ | 1,743,987.50 | $ | 82.07 | $ | 145,332.29 | ||||||||
227 | $ | 1,743,987.50 | $ | 82.07 | $ | 145,332.29 | ||||||||
228 | $ | 1,743,987.50 | $ | 82.07 | $ | 145,332.29 | ||||||||
229 | $ | 1,743,987.50 | $ | 82.07 | $ | 145,332.29 | ||||||||
230 | $ | 1,743,987.50 | $ | 82.07 | $ | 145,332.29 | ||||||||
231 | $ | 1,743,987.50 | $ | 82.07 | $ | 145,332.29 | ||||||||
232 | $ | 1,743,987.50 | $ | 82.07 | $ | 145,332.29 | ||||||||
233 | $ | 1,743,987.50 | $ | 82.07 | $ | 145,332.29 | ||||||||
234 | $ | 1,743,987.50 | $ | 82.07 | $ | 145,332.29 | ||||||||
235 | $ | 1,743,987.50 | $ | 82.07 | $ | 145,332.29 | ||||||||
236 | $ | 1,769,912.50 | $ | 83.29 | $ | 147,492.71 | ||||||||
237 | $ | 1,769,912.50 | $ | 83.29 | $ | 147,492.71 | ||||||||
238 | $ | 1,769,912.50 | $ | 83.29 | $ | 147,492.71 | ||||||||
239 | $ | 1,769,912.50 | $ | 83.29 | $ | 147,492.71 | ||||||||
240 | $ | 1,769,912.50 | $ | 83.29 | $ | 147,492.71 | ||||||||
241 | $ | 1,769,912.50 | $ | 83.29 | $ | 147,492.71 |
Option Periods: 1, 2 & 3
Tenant shall have three (3) options to extend the Lease Term (each, a “Renewal”)
Exhibit “E”
Schedule of Plans and Specifications
and Value Engineering Log (for reference and supplemental info ONLY)
6
Concept Construction of North Florida, Inc. dba Theory Construction |
Printed on Wed Apr 6, 2022 at 11:04 am EDT
Job #: 1000.009 Foundation Park Building 2 (AGTC) 00000 XX 000xx Xxx Xxxxxxx, Xxxxxxx 00000 |
Current Specifications
Number |
Description |
Revision | Issued Date | Received Date | Set | |||||||
00 - Procurement and Contracting Requirements | ||||||||||||
000110 |
Table of Contents | 0 | Specifications (06.11.21) | |||||||||
055000 |
Misc Metals | 0 | None | |||||||||
265600 |
Exterior Lighting (Submittal Purposes Only) | 0 | None | |||||||||
330000 |
Sanitary, Storm and Water (Submittal Purposes Only) | 0 | None | |||||||||
01 - General Requirements | ||||||||||||
01100 |
Summary | 0 | Specifications (06.11.21) | |||||||||
01330 |
Submittal Procedures | 0 | Specifications (06.11.21) | |||||||||
01500 |
Temporary Facilities and Controls | 0 | Specifications (06.11.21) | |||||||||
01524 |
Construction Waste Management | 0 | Specifications (06.11.21) | |||||||||
01770 |
Closeout Procedures | 0 | Specifications (06.11.21) | |||||||||
01781 |
Project Record Documents | 0 | Specifications (06.11.21) | |||||||||
01782 |
Operation and Maintenance Data | 0 | Specifications (06.11.21) | |||||||||
02 - Existing Conditions | ||||||||||||
02361 |
Termite Control | 0 | Specifications (06.11.21) | |||||||||
03 - Concrete | ||||||||||||
03300 |
Cast-In-Place Concrete | 0 | Specifications (06.11.21) | |||||||||
03471 |
Tilt-Up Concrete | 0 | Specifications (06.11.21) | |||||||||
05 - Metals | ||||||||||||
05120 |
Structural Steel Framing | 0 | Specifications (06.11.21) | |||||||||
05210 |
Steel Joist Framing | 0 | Specifications (06.11.21) | |||||||||
05310 |
Steel Decking | 0 | Specifications (06.11.21) | |||||||||
05400 |
Cold-Formed Metal Framing | 0 | Specifications (06.11.21) | |||||||||
05500 |
Metal Fabrications | 0 | Specifications (06.11.21) | |||||||||
05581 |
Column Covers | 0 | Specifications (06.11.21) | |||||||||
06 - Wood, Plastics, and Composites | ||||||||||||
06100 |
Rough Carpentry | 0 | Specifications (06.11.21) | |||||||||
06160 |
Sheathing | 0 | Specifications (06.11.21) | |||||||||
07 - Thermal and Moisture Protection | ||||||||||||
07210 |
Thermal Insulation | 0 | Specifications (06.11.21) | |||||||||
07211 |
Foamed-In-Place Insulation | 0 | Specifications (06.11.21) | |||||||||
07255 |
Bond Breaking Weather Barrier | 0 | Specifications (06.11.21) | |||||||||
07272 |
Fluid-Applied Weather Barrier System | 0 | Specifications (06.11.21) |
Page 1 of 2
Concept Construction of North Florida, Inc. dba Theory Construction |
Printed on Wed Apr 6, 2022 at 11:04 am EDT
Job #: 1000.009 Foundation Park Building 2 (AGTC) 00000 XX 000xx Xxx Xxxxxxx, Xxxxxxx 00000 |
Number |
Description |
Revision | Issued Date | Received Date | Set | |||||||
07542 |
Thermoplastic-Polyolefin (TPO) Roofing | 0 | Specifications (06.11.21) | |||||||||
07620 |
Sheet Metal Flashing and Trim | 0 | Specifications (06.11.21) | |||||||||
07920 |
Joint Sealants | 0 | Specifications (06.11.21) | |||||||||
08 - Openings | ||||||||||||
08110 |
Steel Doors and Frames | 0 | Specifications (06.11.21) | |||||||||
08331 |
Overhead Coiling Doors | 0 | Specifications (06.11.21) | |||||||||
08412 |
Aluminum-Framed Entrances and Glazed Openings | 0 | Specifications (06.11.21) | |||||||||
08710 |
Door Hardware | 0 | Specifications (06.11.21) | |||||||||
08800 |
Glazing | 0 | Specifications (06.11.21) | |||||||||
09 - Finishes | ||||||||||||
09220 |
Portland Cement Plaster (STUCCO) | 0 | Specifications (06.11.21) | |||||||||
09271 |
Glass-Reinforced Gypsum Fabrications | 0 | Specifications (06.11.21) | |||||||||
09911 |
Exterior Painting | 0 | Specifications (06.11.21) |
Page 2 of 2
Concept Construction of North Florida, Inc. dba Theory Construction |
Printed on Wed Apr 6, 2022 at 11:03 am EDT
Job #: 1000.009 Foundation Park Building 2 (AGTC) 00000 XX 000xx Xxx Xxxxxxx, Xxxxxxx 00000 |
Shell Drawings - Current Drawings
Drawing No. |
Drawing Title |
Revision | Drawing Date | Received Date | Set | |||||||
Architectural | ||||||||||||
A001 |
COVER SHEET | 5 | 01/20/2022 | 01/20/2022 | 20220120 ASI-004 (01/20/22) | |||||||
A002 |
NOTES AND ABBREVIATIONS | 1 | 06/18/2021 | 06/22/2021 | Building Permit Set S&S (06/18/21) | |||||||
LS100 |
LIFE SAFETY PLAN | 2 | 11/17/2021 | 11/17/2021 | 20211117 ASI-003 (11/17/21) | |||||||
A100 |
ARCHITECTURAL SITE PLAN | 1 | 06/18/2021 | 06/22/2021 | Building Permit Set S&S (06/18/21) | |||||||
A110 |
REFLECTED CEILING PLAN | 3 | 11/17/2021 | 11/17/2021 | 20211117 ASI-003 (11/17/21) | |||||||
A120 |
ROOF PLAN | 4 | 01/20/2022 | 01/20/2022 | 20220120 ASI-004 (01/20/22) | |||||||
A301 |
BUILDING SECTIONS | 1 | 06/18/2021 | 06/22/2021 | Building Permit Set S&S (06/18/21) | |||||||
A310 |
WALL SECTIONS | 1 | 06/18/2021 | 06/22/2021 | Building Permit Set S&S (06/18/21) | |||||||
A311 |
WALL SECTIONS | 1 | 06/18/2021 | 06/22/2021 | Building Permit Set S&S (06/18/21) | |||||||
A312 |
WALL SECTIONS & STOREFRONT ELEVATIONS | 2 | 11/17/2021 | 11/17/2021 | 20211117 ASI-003 (11/17/21) | |||||||
A500 |
ENLARGED PLAN DETAILS | 1 | 06/18/2021 | 06/22/2021 | Building Permit Set S&S (06/18/21) | |||||||
A501 |
ENLARGED SECTION DETAILS | 1 | 06/18/2021 | 06/22/2021 | Building Permit Set S&S (06/18/21) | |||||||
A502 |
ROOF DETAILS | 1 | 06/18/2021 | 06/22/2021 | Building Permit Set S&S (06/18/21) | |||||||
A600 |
DOOR & FRAME SCHEDULE | 1 | 06/18/2021 | 06/22/2021 | Building Permit Set S&S (06/18/21) | |||||||
A101 |
OVERALL FLOOR PLAN | 5 | 11/17/2021 | 11/17/2021 | 20211117 ASI-003 (11/17/21) | |||||||
A200 |
POD A.1 OVERALL EXTERIOR ELEVATIONS | 6 | 01/20/2022 | 01/20/2022 | 20220120 ASI-004 (01/20/22) | |||||||
Structural | ||||||||||||
S001 |
GENERAL NOTES AND DIAGRAMS | 1 | 06/18/2021 | 08/13/2021 | Building Permit Set S&S (06/18/21) | |||||||
S002 |
TYPICAL DETAILS | 1 | 06/18/2021 | 08/13/2021 | Building Permit Set S&S (06/18/21) | |||||||
S003 |
PERSPECTIVE VIEWS | 1 | 06/18/2021 | 08/13/2021 | Building Permit Set S&S (06/18/21) | |||||||
S101 |
FOUNDATION PLAN | 2 | 11/02/2021 | 11/03/2021 | RFI 002 Removal of Slab on Grade (11/02/21) | |||||||
S102 |
ROOF FRAMING PLAN | 3 | 01/20/2022 | 01/20/2022 | 20220120 ASI-004 (01/20/22) | |||||||
S103 |
HIGH ROOF FRAMING PLAN | 2 | 01/20/2022 | 01/20/2022 | 20220120 ASI-004 (01/20/22) | |||||||
S201 |
SECTIONS & DETAILS | 2 | 11/02/2021 | 11/03/2021 | RFI 002 Removal of Slab on Grade (11/02/21) | |||||||
S202 |
SECTIONS & DETAILS | 1 | 06/18/2021 | 08/13/2021 | Building Permit Set S&S (06/18/21) | |||||||
S203 |
FRAME ELEVATIONS & DETAILS | 3 | 01/20/2022 | 01/20/2022 | 20220120 ASI-004 (01/20/22) | |||||||
S301 |
TILT-UP PANEL KEY PLAN & TYPICAL DETAILS | 2 | 08/19/2021 | 20210823 ASI-001 (08/19/21) | ||||||||
S302 |
TILT-UP PANEL ELEVATIONS & DETAILS | 1 | 06/18/2021 | 08/13/2021 | Building Permit Set S&S (06/18/21) | |||||||
Civil | ||||||||||||
C0.00 |
COVER SHEET AND INDEX | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C0.01 |
EXISTING CONDITIONS MAP | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C0.10 |
GENERAL NOTES | 3 | 09/28/2021 | Site Approved (09/28/21) |
Page 1 of 3
Concept Construction of North Florida, Inc. dba Theory Construction |
Printed on Wed Apr 6, 2022 at 11:03 am EDT
Job #: 1000.009 Foundation Park Building 2 (AGTC) 00000 XX 000xx Xxx Xxxxxxx, Xxxxxxx 00000 |
Drawing No. |
Drawing Title |
Revision | Drawing Date | Received Date | Set | |||||||
C0.11 |
LEGEND | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C0.20 |
STORMWATER POLLUTION PREVENTION NOTES | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C0.21 |
STORMWATER POLLUTION PREVENTION PLAN ‘POD A.1’ | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C0.21.1 |
STORMWATER POLLUTION PREVENTION PLAN ‘POD A.2’ | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C0.22 |
STORMWATER POLLUTION PREVENTION PLAN ‘POD B’ | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C0.23 |
STORMWATER POLLUTION PREVENTION PLAN ‘POD C’ | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C0.30 |
DEMOLITION AND TREE PROTECTION PLAN | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C1.00 |
MASTER SITE PLAN | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C1.10 |
DETAILED HORIZONTAL CONTROL AND SITE PLAN | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C1.11 |
DETAILED HORIZONTAL CONTROL AND SITE PLAN | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C1.12 |
DETAILED HORIZONTAL CONTROL AND SITE PLAN | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C1.13 |
DETAILED HORIZONTAL CONTROL AND SITE PLAN | 4 | 03/01/2022 | 03/02/2022 | 20220301 FO #2 Data Conduits (03/ 01/22) | |||||||
C2.00 |
MASTER GRADING PLAN | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C2.10 |
DETAILED GRADING AND DRAINAGE PLAN ‘POD A.1’ | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C2.10.1 |
DETAILED GRADING AND DRAINAGE PLAN ‘POD A.2’ | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C2.11 |
DETAILED GRADING AND DRAINAGE PLAN ‘POD B’ | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C2.12 |
DETAILED GRADING AND DRAINAGE PLAN ‘POD C’ | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C2.13 |
DETAILED GRADING AND DRAINAGE PLAN | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C2.30 |
CONSTRUCTION DETAILS | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C2.31 |
CONSTRUCTION DETAILS | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C2.32 |
CONSTRUCTION DETAILS | 1 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C2.33 |
CONSTRUCTION DETAILS | 1 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C3.00 |
MASTER UTILITY PLAN | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
C3.10 |
DETAILED UTILITY PLAN | 4 | 03/01/2022 | 03/02/2022 | 20220301 FO #2 Data Conduits (03/ 01/22) | |||||||
C3.11 |
DETAILED UTILITY PLAN | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
E-1 |
SITE PHOTOMETRIC PLAN | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
E-2 |
SITE PHOTOMETRIC PLAN | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
E-3 |
SITE PHOTOMETRIC PLAN | 2 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
E101 |
SITE ELECTRICAL PLAN | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
A101A (CIVIL) |
OVERALL FLOOR PLAN | 1 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
A102 (CIVIL) |
FLOOR PLAN — ’POD B’ | 1 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
A103 (CIVIL) |
FLOOR PLAN — ’POD C’ | 1 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
A200A |
POD A.1 OVERALL EXTERIOR ELEVATIONS | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
A201 |
EXTERIOR ELEVATIONS – ’POD C’ | 1 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
A202 |
EXTERIOR ELEVATIONS – ’POD B&C’ SCREENWALL | 1 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
Landscape |
Page 2 of 3
Concept Construction of North Florida, Inc. dba Theory Construction |
Printed on Wed Apr 6, 2022 at 11:03 am EDT
Job #: 1000.009 Foundation Park Building 2 (AGTC) 00000 XX 000xx Xxx Xxxxxxx, Xxxxxxx 00000 |
Drawing No. |
Drawing Title |
Revision | Drawing Date | Received Date | Set | |||||||
L-100 |
LANDSCAPE & IRRIGATION PLAN REFERENCE MAP | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-101 |
LANDSCAPE NOTES, DETAILS, & CALCULATIONS - PHASE 1 (FOR REFERENCE ONLY) | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
X-000 |
XXXXXXXXX XXXX - XXXXX 0 (FOR REFERENCE ONLY) | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-103 |
LANDSCAPE PLAN - (FOR REFERENCE ONLY | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-200 |
LANDSCAPE NOTES, DETAILS, & CALCULATIONS - POD A1 | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-201 |
LANDSCAPE PLAN - POD A1 | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-202 |
LANDSCAPE PLAN - POD A1 | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-203 |
IRRIGATION DETAILS & SPECIFICATIONS - POD A1 | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-204 |
IRRIGATION PLAN - POD A1 | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-205 |
LANDSCAPE NOTES, DETAILS, & CALCULATIONS - POD A2 | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-206 |
LANDSCAPE PLAN - POD A2 | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-207 |
LANDSCAPE PLAN - POD A2 | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-208 |
IRRIGATION DETAILS & SPECIFICATIONS - POD A2 | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-209 |
IRRIGATION PLAN - POD A2 | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-300 |
LANDSCAPE NOTES, DETAILS, & CALCULATIONS - POD B | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-301 |
LANDSCAPE PLAN - POD B | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-302 |
LANDSCAPE PLAN - POD B | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-303 |
IRRIGATION DETAILS & SPECIFICATIONS - POD B | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-304 |
IRRIGATION PLAN - POD B | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-400 |
LANDSCAPE NOTES, DETAILS, & CALCULATIONS - POD C | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-401 |
LANDSCAPE PLAN - POD C | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-402 |
IRRIGATION DETAILS & SPECIFICATIONS - POD C | 3 | 09/28/2021 | Site Approved (09/28/21) | ||||||||
L-403 |
IRRIGATION PLAN - POD C | 3 | 09/28/2021 | Site Approved (09/28/21) |
Page 3 of 3
AGTC Alachua - Fitout Alachua, Florida Concept Companies
The Xxxxxxx-Xxxxxx Contracting Company WT Project # 019391
Drawing Log |
Sheet Number |
Sheet Name |
100% Construction Documents (12/23/2021) |
Addendum #1 (01/21/2022) |
Addendum #2 (02/24/2022) |
||||||||||
General |
| |||||||||||||
G001 |
Cover Sheet and Sheet Index |
X | ||||||||||||
G002 |
Project Information, Abbreviations, and Symbols |
X | X | |||||||||||
G003 |
General Details, Typ Mounting Heights, and ADA Clearances |
X | ||||||||||||
G004 |
Typical Partition Types |
X | X | |||||||||||
G005 |
Typical Framing Details |
X | ||||||||||||
G006 |
Life Safety Plan and Building Code Analysis |
X | X | |||||||||||
Architectural |
| |||||||||||||
A100 |
Site Plan |
X | ||||||||||||
A101 |
Overall Floor Plan |
X | X | |||||||||||
A102 |
Dimension Floor Plan |
X | X | |||||||||||
A131 |
Overall Reflected Ceiling Plan |
X | X | |||||||||||
A141 |
Roof Plan |
X | X | |||||||||||
A401 |
Enlarged Restroom Plan and Interior Elevations |
X | X | |||||||||||
A402 |
Enlarged Plans and Interior Elevations |
X | X | |||||||||||
A501 |
Column Details |
X | X | |||||||||||
A502 |
Details |
X | X | |||||||||||
A601 |
Door & Window Schedule and Details |
X | X | |||||||||||
A901 |
Room Finish Schedule, Legend, Details and Notes |
X | X | |||||||||||
A902 |
Overall Finish Plan |
X | X | |||||||||||
LF001 |
Typ Laboratory Casework & Laboratory Accessories |
X | X | |||||||||||
LF002 |
Laboratory Fixtures |
X | X | |||||||||||
LF101 |
Overall Equipment Coordination Plan |
X | X | |||||||||||
LF101A |
Laboratory Classification Plans |
X | ||||||||||||
LF102 |
Enlarged Laboratory Suite - Microbiology, Tissue, QC, & Virus Labs |
X | X | |||||||||||
LF103 |
Enlarged Production Suite - Cell Expansion |
X | X | |||||||||||
LF104 |
Enlarged Production Suite - Bioreactor, Purification, & Autoclave |
X | X | |||||||||||
LF105 |
Enlarged Laboratory Plan - Material Storage |
X | X | |||||||||||
LF401 |
Enlarged Laboratory Suite Elevations |
X | X | |||||||||||
LF402 |
Enlarged Laboratory Suite Elevations |
X | X | |||||||||||
LF403 |
Enlarged Process Suite Elevations |
X | X | |||||||||||
LF404 |
Enlarged Process Suite Elevations |
X | X | |||||||||||
Fire Protection |
| |||||||||||||
F001 |
Fire Protection Symbols & Abbreviations |
X | ||||||||||||
F201 |
Overall Fire Protection Plan |
X | ||||||||||||
F801 |
Fire Protection Details |
X | ||||||||||||
Plumbing |
| |||||||||||||
P001 |
Legend, Abbreviations, Codes, Standards And Enalrged Equipment Yard Plan |
X | ||||||||||||
P200 |
Overall Plumbing Xxxxxxxxxx Xxxx |
X | X | |||||||||||
X000X |
Xxxxxxxx Xxxxxxxxxx Xxxx - Xxxx A |
X | ||||||||||||
P200B |
Plumbing Underfloor Plan - Area B |
X | X | |||||||||||
P201 |
Overall Plumbing Plan |
X | X | |||||||||||
P201A |
Plumbing Plan - Area A |
X | ||||||||||||
P201B |
Plumbing Plan - Area B |
X | X | |||||||||||
P202 |
Roof Plumbing Plan |
X | ||||||||||||
P301 |
Overall Plumbing Plan - Lab Gas |
X | X | |||||||||||
P301A |
Plumbing Lab Gas Plan - Area A |
X | X | |||||||||||
P301B |
Plumbing Lab Gas Plan - Area B |
X | ||||||||||||
P401 |
Overall Plumbing Plan - USP Water |
X | X | |||||||||||
P401B |
Plumbing USP Water Plan - Area B |
X | X | |||||||||||
P501 |
Plumbing Enlarged Plans |
X | ||||||||||||
P601 |
Process Symbols and Abbreviations |
X | ||||||||||||
P602 |
Process Symbols and Abbreviations |
X | ||||||||||||
P603 |
HPW Generation and Distribution |
X | X | |||||||||||
P701 |
Piping Riser Diagram - DWV |
X | X | |||||||||||
P702 |
Piping Riser Diagram - Domestic Water |
X | X | |||||||||||
P703 |
Piping Riser Diagram - Lab Gas |
X | ||||||||||||
P704 |
Piping Riser Diagram - USP Water |
X | X | |||||||||||
P801 |
Plumbing Details |
X | X | |||||||||||
P802 |
Plumbing Details |
X | X | |||||||||||
P803 |
Plumbing Details |
X | X | |||||||||||
P901 |
Plumbing Schedules |
X | X | |||||||||||
Mechanical |
| |||||||||||||
M001 |
Mechanical Symbols & Abbreviations |
X | ||||||||||||
M101 |
Mechanical Site Plan — Not Used |
X | ||||||||||||
M201 |
Overall Mechanical Duct Plan |
X | ||||||||||||
M201A |
Mechanical Duct Plan - Area A |
X | X | |||||||||||
M201B |
Mechanical Duct Plan - Area B |
X | X | |||||||||||
M202 |
Roof Mechanical Plan |
X | X | |||||||||||
M301 |
Mechanical Piping Plan |
X | X | |||||||||||
M501 |
Mechanical Enlarged Plans |
X | X |
Page 1 of 5
AGTC Alachua - Fitout Alachua, Florida Concept Companies
The Xxxxxxx-Xxxxxx Contracting Company WT Project # 019391
Drawing Log |
Sheet Number |
Sheet Name |
100% Construction Documents (12/23/2021) |
Addendum #1 (01/21/2022) |
Addendum #2 (02/24/2022) |
||||||||||
M601 | Air Flow Diagram |
X | X | |||||||||||
M602 | Chilled Water Flow Diagram |
X | X | |||||||||||
M603 | Heating Hot Water Flow Diagram |
X | X | |||||||||||
M701 | Mechanical Controls - Lab Exhaust Fan |
X | X | |||||||||||
M702 | Mechanical Controls - XXX 0-0 |
X | X | |||||||||||
M702A | Mechanical Controls - XXX 0-0 |
X | ||||||||||||
M703 | Mechanical Controls - XXX 0-0 |
X | X | |||||||||||
M704 | Mechanical Controls - Pressurization Map |
X | X | |||||||||||
M705 | Mechanical Controls - Typical Clean Room Controls |
X | X | |||||||||||
M706 | Mechanical Controls - Chilled Water |
X | X | |||||||||||
M707 | Mechanical Controls - Heating Hot Water |
X | ||||||||||||
M708 | Mechanical Controls - Fan Coil Units |
X | X | |||||||||||
M709 | Mechanical Controls - Air Terminal Devices |
X | ||||||||||||
M710 | Mechanical Controls - Cell Expansion Bioreactor |
X | X | |||||||||||
M711 | Mechanical Controls - Lab Without Hood |
X | ||||||||||||
M712 | Mechanical Controls - Miscellaneous |
X | ||||||||||||
M713 | Mechanical Controls - Miscellaneous |
X | X | |||||||||||
M714 | Mechanical Controls - Miscellaneous |
X | ||||||||||||
M715 | Mechanical Controls - Miscellaneous |
X | ||||||||||||
M716 | Mechanical Controls - Miscellaneous |
X | ||||||||||||
M717 | BAS Network Architecture Diagram |
X | ||||||||||||
M801 | Mechanical Details |
X | ||||||||||||
M802 | Mechanical Details |
X | ||||||||||||
M803 | Mechanical Details |
X | ||||||||||||
M804 | Mechanical Details |
X | X | |||||||||||
M805 | Mechanical Details |
X | ||||||||||||
M901 | Mechanical Schedules |
X | X | |||||||||||
M902 | Mechanical Schedules |
X | X | |||||||||||
M903 | Mechanical Schedules |
X | X | |||||||||||
Electrical |
||||||||||||||
E001 | Electrical Symbols & Abbreviations |
X | ||||||||||||
E101 | Site Electrical Plan |
X | X | |||||||||||
E102 | Site Lighting Plan |
X | ||||||||||||
E201 | Lighting Plan |
X | X | |||||||||||
E202 | Roof Lighting Plan |
X | ||||||||||||
E301A | Power Plan - Area A |
X | X | |||||||||||
X000X | Xxxxx Xxxx - Xxxx X |
X | X | |||||||||||
E302 | Roof Power & Lightning Protection Plan |
X | ||||||||||||
E401A | Systems Plan - Area A |
X | X | |||||||||||
E401B | Systems Plan - Area B |
X | X | |||||||||||
E701 | Electrical Power Riser Diagram |
X | ||||||||||||
E702 | Grounding Electrode System Riser |
X | ||||||||||||
E703 | Fire Alarm Riser Diagrams, Details & Matrix |
X | ||||||||||||
E801 | Electrical Details |
X | ||||||||||||
E802 | Electrical Details |
X | ||||||||||||
E901 | Electrical Schedules |
X | X | |||||||||||
E902 | Electrical Panel Schedules |
X | X | |||||||||||
E903 | Electrical Panel Schedules |
X | X | |||||||||||
Telecom |
||||||||||||||
T001 | Technology Symbols & Abbreviations |
X | ||||||||||||
T201A | Technology Plan - Area A |
X | X | |||||||||||
X000X | Xxxxxxxxxx Xxxx - Xxxx X |
X | X | |||||||||||
T501 | Enlarged Plans |
X | ||||||||||||
T701 | Technology Riser Diagram |
X | ||||||||||||
T801 | Technology Details |
X | ||||||||||||
T802 | Technology Details |
X |
Page 2 of 5
AGTC Alachua - Fitout Alachua, Florida Concept Companies
The Xxxxxxx-Xxxxxx Contracting Company WT Project # 019391
Specification Log |
Specification Number |
Specification Name |
100% Construction Documents (12/23/2021) |
Addendum #1 (01/21/2022) |
Addendum #2 (02/24/2022) |
||||||||||
DIVISION 0 - Procurement and Contracting Requirements |
||||||||||||||
000000 | Cover | X | ||||||||||||
000101 | Sign & Seal Page | X | ||||||||||||
000110 | Table of Contents | X | X | |||||||||||
DIVISION 1 - General Requirements |
||||||||||||||
010000 | General Requirements | X | ||||||||||||
011000 | Summary | X | ||||||||||||
012500 | Substitution Procedures | X | ||||||||||||
012900 | Payment Procedures | X | ||||||||||||
013233 | Photographic Documentation | X | ||||||||||||
013300 | Submittal Procedures | X | ||||||||||||
017419 | Construction Waste Management and Disposal | X | ||||||||||||
017700 | Closeout Procedures | X | ||||||||||||
017823 | Operation and Maintenance Data | X | ||||||||||||
017839 | Project Record Documents | X | ||||||||||||
DIVISION 3 - Concrete |
||||||||||||||
032000 | Concrete Reinforcement | X | ||||||||||||
033000 | Cast-in-Place Concrete | X | ||||||||||||
DIVISION 5 - Metals |
||||||||||||||
054000 | Cold-Formed Metal Framing | X | ||||||||||||
DIVISION 6 - Xxxxx, Plastics, and Composites |
||||||||||||||
061000 | Rough Carpentry | X | ||||||||||||
061053 | Miscellaneous Rough Carpentry | X | ||||||||||||
064116 | Plastic-Laminate Clad Architectural Cabinets | X | ||||||||||||
067413 | Fibreglass Reinforced Gratings | X | ||||||||||||
DIVISION 7 - Thermal and Moisture Protection |
||||||||||||||
078413 | Penetration Firestopping | X | ||||||||||||
079100 | Preformed Joint Seals | X | ||||||||||||
079200 | Joint Firestopping | X | ||||||||||||
079219 | Acoustical Joint Sealants | X | ||||||||||||
DIVISION 08 - Openings |
||||||||||||||
081113 | Hollow Metal Doors and Frames | X | ||||||||||||
081414 | Flush Wood Doors | X | ||||||||||||
083113 | Access Doors and Frames | X | ||||||||||||
087100 | Door Hardware | X | X | |||||||||||
088000 | Glazing | X | ||||||||||||
DIVISION 09 - Finishes |
||||||||||||||
092216 | Non-Structural Metal Framing | X | ||||||||||||
092900 | Gypsum Board | X | ||||||||||||
093013 | Ceramic Tiling | X | ||||||||||||
095113 | Acoustical Panel Ceilings | X | ||||||||||||
096513 | Resilient Base and Accessories | X | ||||||||||||
096516 | Resilient Sheet Flooring | X | ||||||||||||
099123 | Interior Painting | X | ||||||||||||
DIVISION 10 – Specialties |
||||||||||||||
101423.16 | Room-Identification Panel Signage | X | ||||||||||||
102113.16 | Plastic-Laminate-Clad Toilet Compartments | X | ||||||||||||
102600 | Wall and Door Protection | X | X | |||||||||||
102800 | Toilet, Bath, and Laundry Accessories | X | ||||||||||||
104413 | Fire Protection Cabinets | X | ||||||||||||
104416 | Fire Extinguishers | X | ||||||||||||
000000 | Xxxxxxx-Xxxxxxxx-Xxxx Lockers | X | ||||||||||||
105613 | Metal Storage Shelving | X | ||||||||||||
105626 | Mobile Storage Shelving | X | ||||||||||||
DIVISION 12 - Furnishings |
||||||||||||||
122413 | Roller Window Shades | X | ||||||||||||
123553.16 | Plastic-Laminate-Clad Laboratory Casework | X | ||||||||||||
123623.13 | Plastic-Laminate-Clad Countertops | X | ||||||||||||
123661.16 | Solid Surfacing Countertops | X |
Page 3 of 5
Specification Log
Specification Number |
Specification Name |
100% Construction Documents (12/23/2021) |
Addendum #1 (01/21/2022) |
Addendum #2 (02/24/2022) |
||||||||||
DIVISION 13 - Special Construction |
||||||||||||||
130600 | Laboratory Environmental Rooms | X | ||||||||||||
DIVISION 21 - Fire Protection |
||||||||||||||
211314 | Automatic Fire Sprinkler System | X | ||||||||||||
DIVISION 22 - Plumbing |
||||||||||||||
220000 | General Plumbing Requirements | X | ||||||||||||
220529 | Piping and Equipment Supporting Devices | X | ||||||||||||
220553 | Piping Systems Identification | X | ||||||||||||
220594 | Domestic Water Systems Balance | X | ||||||||||||
220700 | Piping Systems Insulation | X | ||||||||||||
221118 | Water Distribution System | X | ||||||||||||
221314 | Sanitary Waste and Clear Water Drainage Systems | X | ||||||||||||
221600 | Natural Gas Piping | X | ||||||||||||
222114 | Plumbing Specialties | X | ||||||||||||
223100 | Water Conditioning Equipment | X | ||||||||||||
223314 | Water Heating Equipment | X | X | |||||||||||
224000 | Plumbing Fixtures | X | ||||||||||||
226114 | Laboratory Compressed Air System | X | X | |||||||||||
226314 | Nitrogen, Carbon Dioxide, and Special Gas System | X | ||||||||||||
226653 | Corrosion Resistant Waste and Vent System | X | ||||||||||||
226714.13 | Plastic Piping for High Purity Service | X | X | |||||||||||
226720.13 | High Purity Water Service | X | X | |||||||||||
DIVISION 23 - Heating, Ventilating, and Air Conditioning |
||||||||||||||
230000 | General HVAC Requirements | X | ||||||||||||
230513 | HVAC Motors | X | ||||||||||||
230514 | Variable Frequency Drive (VFD) System | X | ||||||||||||
230529 | HVAC Supporting Devices | X | ||||||||||||
230550 | HVAC Vibration Isolation | X | ||||||||||||
230553 | HVAC Systems Identification | X | ||||||||||||
230594 | Water Systems Test Adjust Balance | X | ||||||||||||
230595 | Air Systems Test Adjust Balance | X | ||||||||||||
230598 | Acceptance Testing of Rotating Equipment | X | ||||||||||||
230700 | HVAC Insulation | X | ||||||||||||
230800 | Mechanical Commissioning Requirements | X | ||||||||||||
232116 | Piping | X | ||||||||||||
232118 | Valves | X | ||||||||||||
232120 | Piping Specialties | X | ||||||||||||
232123 | Pumps | X | ||||||||||||
232514 | Chemical Treatment Systems | X | ||||||||||||
233114 | HVAC Ducts and Casings | X | ||||||||||||
233400 | HVAC Fans | X | X | |||||||||||
233600 | Air Terminal Units | X | ||||||||||||
233713 | Diffusers, Registers, and Grilles | X | X | |||||||||||
234114 | Filters | X | ||||||||||||
235100 | Smokestack, Breeching, and Vent Piping | X | ||||||||||||
235214 | Primary Heating Equipment | X | ||||||||||||
237214 | Heat Recovery Equipment | X | ||||||||||||
237328 | Factory Fabricated Custom Air Handling Units | X | X | |||||||||||
237400 | Packaged Rooftop Air Handling Units | X | ||||||||||||
238126 | Split System Air Conditioners | X | X | |||||||||||
238214 | Heating and Cooling Terminal Devices | X | ||||||||||||
DIVISION 25 - Integrated Automation |
||||||||||||||
250513 | Conductors and Cables | X | ||||||||||||
250901 | Integrated Automation | X | X | |||||||||||
250902 | Direct Digital Controllers & Networks | X | X | |||||||||||
250903 | Client-Server Information Database Integration | X | X | |||||||||||
250904 | Control Instrumentation | X | ||||||||||||
250904 | Control Valves, Dampers, & Actuators | X | ||||||||||||
251000 | Network Equipment | X | ||||||||||||
251113 | Integration Network Gateways | X | ||||||||||||
251116 | Network Routers, Bridges, Switches, and Hubs | X | ||||||||||||
000000 | Network Operator Workstation | X | ||||||||||||
000000 | Network Workstation Printer | X | ||||||||||||
251219 | Integration Protocols | X | X | |||||||||||
251300 | Control and Monitoring Network (BAS) | X | X | |||||||||||
251313 | Control and Monitoring Supervisory Control | X | ||||||||||||
251400 | Local Control Units | X |
Page 4 of 5
Specification Log
Specification Number |
Specification Name |
100% Construction Documents (12/23/2021) |
Addendum #1 (01/21/2022) |
Addendum #2 (02/24/2022) |
||||||||||
251423 | Field Equipment Panels | X | ||||||||||||
251500 | Software | X | ||||||||||||
000000 | Actuators and Operators | X | ||||||||||||
000000 | Switches and Relays | X | ||||||||||||
253516 | Sensors and Transmitters | X | ||||||||||||
253517 | Air and Gas Measurement | X | X | |||||||||||
253818 | Liquid Pressure and Flow Measurement | X | ||||||||||||
253519 | Control Valves | X | ||||||||||||
253523 | Control Dampers | X | ||||||||||||
255100 | Centralized Equipment and Alarm System Monitoring | X | ||||||||||||
255400 | Monitoring and Control of Plumbing Equipment | X | ||||||||||||
255600 | Monitoring and Control of Electrical Equipment | X | ||||||||||||
DIVISION 26 - Electrical |
||||||||||||||
260000 | General Electrical Requirements | X | ||||||||||||
260516 | Owner-Furnished Equipment | X | ||||||||||||
260519 | Low-Voltage Electrical Power Conductors and Cables | X | ||||||||||||
260526 | Grounding and Bonding for Electrical Systems | X | ||||||||||||
260529 | Hangers and Supports for Electrical Systems | X | ||||||||||||
260533 | Raceways and Boxes for Electrical Systems | X | ||||||||||||
260533.13 | Surface Raceway System | X | ||||||||||||
260553 | Electrical Systems Identification | X | ||||||||||||
260573 | Power System Studies | X | ||||||||||||
260923 | Lighting Control Devices | X | ||||||||||||
262200 | Low-Voltage Transformers | X | ||||||||||||
262415.13 | Lighting and Appliance Panelboards | X | ||||||||||||
262416.16 | Distribution Panelboards | X | ||||||||||||
262713 | Electrical Metering | X | X | |||||||||||
262726 | Wiring Devices | X | ||||||||||||
262813 | Fuses | X | ||||||||||||
262816 | Enclosed Switches and Circuit Breakers | X | ||||||||||||
262913 | Enclosed Controllers | X | ||||||||||||
263213 | Engine Generators | X | X | |||||||||||
263623 | Automatic Transfer Switches | X | X | |||||||||||
264113 | Lightning Protection for Structures | X | ||||||||||||
264300 | Surge Protection Devices | X | ||||||||||||
265000 | Lighting | X | ||||||||||||
DIVISION 27 - Communications |
||||||||||||||
270000 | General Communications Requirements | X | ||||||||||||
270526 | Grounding and Bonding for Communications Systems | X | ||||||||||||
270528.29 | Hangers and Supports for Communications Systems | X | ||||||||||||
270528.33 | Raceways and Boxes for Communications Systems | X | ||||||||||||
270528.36 | Cable Trays for Communications Systems | X | ||||||||||||
270553 | Communications System Identification | X | ||||||||||||
271000 | Structured Cabling | X | ||||||||||||
271100 | Communications Equipment Room Fittings | X | ||||||||||||
271300 | Communications Backbone Cabling | X | ||||||||||||
271500 | Communications Horizontal Cabling | X | ||||||||||||
275319 | Emergency Responder Radio Reinforcement System | X | ||||||||||||
DIVISION 28 - Electronic Safety and Security |
||||||||||||||
280000 | General Electronic Safety and Security Requirements | X | ||||||||||||
280545 | Electronic Safety and Security Systems Integration | X | ||||||||||||
281000 | Electronic Access Control | X | ||||||||||||
282000 | Video Surveillance | X | ||||||||||||
283116 | Multiplexed Fire Detection and Alarm Systems | X | ||||||||||||
DIVISION 40 - Process Integration |
||||||||||||||
400210 | Document Requirements Specification | X | ||||||||||||
400211 | Project Documentation Practice | X |
Page 5 of 5
as of 11/19/2021
AGTC - 50% Estimate Reductions
Division 8 | ||||||
FRP Door Quantity Adjustments - Replace with Hollow Metal |
$ | (85,000.00 | ) | 23 FRP doors shown, replace with Hollow Metal, Hardware requirements still to be confirmed (Xxxxx Xxxx - RS&H email 11/18) | ||
Division 9 | ||||||
VCT vs. LVT / change lobby ceiling type / delete ADA bathroom walls, change floor and ceiling type / epoxy vs. tile in locker room / | ||||||
Architectural Updates |
$ | (20,000.00 | ) | delete ADA restrooms (Xxxxx Xxxx - RS&H email 11/18) | ||
Xxxxxx Grid Changes |
$ | (90,000.00 | ) | 2,078 sf vs. 4,024 sf, replace SPC-1 with GWB ceiling / epoxy paint, allowance for access panels (Xxxxx Xxxx - RS&H email 11/18) | ||
Remove Wall Tile in Bathrooms |
$ | (50,000.00 | ) | Reduce tile to 54” height in lieu of 8’ height, only provide at wet walls (Xxxxx Xxxx - RS&H email 11/18) | ||
Division 10 | ||||||
Crash Rail Changes |
$ | (120,000.00 | ) | Replace SS Sani-Rail per specification with Xxxxxxx XX rail (AGTC 50% Estimate Annotations) | ||
Division 13 |
||||||
Cold Room Basis of Design Change |
$ | (65,000.00 | ) | Utilize Norlake in lieu of Nycom (Basis of Design) (AGTC email 11/15) | ||
Division 22 | ||||||
USP Skid Reductions |
$ | (350,000.00 | ) | Utilize Stilmas 5gpm system in lieu of Evoqua 10gpm system (Basis of Design) (AGTC email 11/15) | ||
Remove Waste Neutralization |
$ | (125,000.00 | ) | PW-1 / PW-2 (AGTC 50% Estimate Annotations 11/17) | ||
Process Piping Reductions |
$ | (25,397.00 | ) | Per updated layouts (Andy Xxxxx - AEI email 11/9) | ||
Vacuum + 139 lf |
||||||
Oxygen - 30 lf |
||||||
IA - 446 lf |
||||||
PA +115 lf |
||||||
N2 - 46 lf |
||||||
CO2 - 21 lf |
||||||
Delete House Vacuum Piping |
$ | (50,000.00 | ) | Remove Vacuum Piping (based on 11/9 layout) / Vacuum Equipment (AGTC 50% Estimate Annotations) | ||
Division 23 | ||||||
AHU / FCU / CU Equipment Changes - Maintain CHW Concept |
$ | (284,354.00 | ) | Reduced Basis of Design Requirements (Xxxx Xxxx - AEI email 11/9) | ||
Add’l Fan Filter Units |
$ | 88,500.00 | Added 10 units @ $8,850 (Xxxx Xxxx - AEI email 11/9) | |||
Delete Heat Recovery Piping |
$ | (46,228.00 | ) | 182 lf x $254 / lf (Xxxx Xxxx - AEI email 11/9) | ||
Chiller Equipment Size Reduction |
$ | (27,000.00 | ) | Reduce from 300T chiller to 260T chiller (Xxxx Xxxx - AEI email 11/9) | ||
Dx in lieu of Chilled Water |
$ | (550,000.00 | ) | Delete chiller / chilled water piping / chilled water pumps / chilled water storage tanks / replace AHU’s with Dx type / replace exhaust fans with standard type / remove secondary coils on Fan Coil Units / add Condensing Units (Xxxx Xxxx - AEI email 11/19) | ||
Division 26 | ||||||
Upsize Generator to 400kW (Natural Gas) |
$ | 160,000.00 | Provide 400kW generator in lieu of 150kW shown in 50% Documents | |||
Upsize Elec Distribution (400A vs. 800A) - scope to be confirmed |
$ | 105,000.00 | Increase feeder sizes, Automatic Transfer Switch, and Distribution Switchboards / Breakers to support 800A distribution service in lieu of 400A shown on 50% Documents (Xxxx Xxxxx - AEI email 11/10) | |||
Division 27 | ||||||
Delete Access Control Allowance |
$ | (10,000.00 | ) | |||
Remove X-X Xxxx |
$ | (100,000.00 | ) | |||
Misc Adjustments - Markups |
$ | (16,303.00 | ) | |||
Subtotal |
$ | (1,660,782.00 | ) | |||
Markups |
$ | (463,358.18 | ) | |||
Total Approx Deduct |
$ | (2,124,140.18 | ) |