Contract Between Owner and Design / Builder For Design and Construction ServicesContract Between Owner and Design / Builder for Design and Construction Services • May 4th, 2022
Contract Type FiledMay 4th, 2022WHEREAS, the Owner and DB entered into a Non-exclusive Two-Year Continuing Contract Between Owner and Design / Builder for Assigned Design / Construction Projects dated 1/18/2022 (Item #39) with an additional one (1)-year extension which authorizes the Owner to assign subprojects to the DB; and
Contract Between Owner and Design / Builder For Design and Construction ServicesContract Between Owner and Design / Builder for Design and Construction Services • October 4th, 2021
Contract Type FiledOctober 4th, 2021WHEREAS, the Owner and DB entered into a Non-exclusive Two-Year Continuing Contract Between Owner and Design / Builder for Assigned Design / Construction Projects dated 1/22/2019 (Item #41) with an additional one (1)-year extension dated 1/7/2021 (Item #12) which authorizes the Owner to assign subprojects to the DB; and
Contract Between Owner and Design / Builder For Design and Construction ServicesContract Between Owner and Design / Builder for Design and Construction Services • March 13th, 2019
Contract Type FiledMarch 13th, 2019WHEREAS, the Owner and DB entered into a Non-exclusive Two Year Continuing Contract Between Owner and Design / Builder for Assigned Design / Construction Projects dated 1/22/2019 (Item #41) which authorizes the Owner to assign subprojects to the DB; and
Contract Between Owner and Design / Builder For Design and Construction ServicesContract Between Owner and Design / Builder for Design and Construction Services • February 7th, 2018
Contract Type FiledFebruary 7th, 2018to remodel the existing Administrative and Guidance offices at the Oak Park School campus to provide a single point of entry and secure the campus. The scope of work includes enclosing the current open entry creating a secure corridor into the campus; removing and replacing automatic sliding glass doors with secure electronic accessible swinging doors; rerouting the campus security and telecommunications panels due to the structural changes of the project; all finish upgrades indirectly resulting from the project; providing canopy coverage for covered passage to the clinic.