Common Contracts

1 similar null contracts

Memorandum of Understanding Between
September 26th, 2013
  • Filed
    September 26th, 2013

Between November 2005 and September 2006, a project to study the US 1 Corridor between Interstate Highway 540 in Wake County and Park Avenue/US 1A in Franklin County was funded by the North Carolina Capital Area Metropolitan Planning Organization (NC Capital Area MPO), the City of Raleigh, Town of Wake Forest, the North Carolina Department of Transportation (NCDOT), and Triangle Transit (TTA). This is referred to as the US 1 Corridor Study Phase I. Subsequently, between December 2011 and September 2012, a project to study the US 1 Corridor from Park Avenue/US 1A to the Vance County line in Franklin County was conducted. This is referred to as the US 1 Corridor Study Phase II. [The term “Corridor” in this Memorandum refers the area lying roughly within one thousand feet in either direction of the centerline of the US 1 right of way between the highway’s intersections with Interstate 540 in Wake County, and to the Vance County line in Franklin County.]

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.