National Pollutant Discharge Elimination System (NPDES) means the national program for issuing, modifying, revoking and reissuing, terminating, monitoring, and enforcing permits and imposing and enforcing pretreatment requirements, under Sections 307, 318, 402, and 405 of CWA. The term includes an approved program.
Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.
National Pollutant Discharge Elimination System means the national program for issuing, modifying, revoking and reissuing, terminating, monitoring and enforcing permits, and imposing and enforcing pretreatment requirements under Sections 307, 402, 318, and 405 of the Clean Water Act.
Erosion and sediment control plan means a comprehensive plan developed to address pollution caused by erosion and sedimentation of soil particles or rock fragments during construction.
Service Control Point (SCP) is the node in the common channel signaling network that accepts Queries for certain Database services. The SCP is a real time database system that receives Queries from service platforms, performs subscriber or application-specific service logic, and then sends a Response back to the Query-originating platform. Such service platforms can be Service Switching Points (SSPs) or other network nodes capable of properly formatting and launching Queries.
National Pollutant Discharge Elimination System Permit or “NPDES” means a permit issued by the MPCA as required by federal law for the purpose of regulating the discharge of pollutants from point sources into waters of the United States from concentrated animal feeding operations (CAFOs) as defined by federal law
Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.
Stormwater runoff means water flow on the surface of the ground or in storm sewers, resulting from precipitation.
Stormwater Pollution Prevention Plan or "SWPPP" means a document that is prepared in accordance with good engineering practices and that identifies potential sources of pollutants that may reasonably be expected to affect the quality of stormwater discharges from the construction site, and otherwise meets the requirements of this Ordinance. In addition the document shall identify and require the implementation of control measures, and shall include, but not be limited to the inclusion of, or the incorporation by reference of, an approved erosion and sediment control plan, an approved stormwater management plan, and a pollution prevention plan.
Resource recovery facility means a solid waste facility
Navigable waters ’ means the waters of the United States, including the territorial sea;
Air pollution control equipment means a mechanism, device, or contrivance used to control or prevent air pollution, that is not, aside from air pollution control laws and administrative regulations, vital to production of the normal product of the source or to its normal operation.
Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.
Change in Control Protection Period means the period beginning on the date of the consummation of the Change in Control and ending on the first anniversary of such Change in Control.
Flood-related erosion area management means the operation of an overall program of corrective and preventive measures for reducing flood-related erosion damage, including but not limited to emergency preparedness plans, flood-related erosion control works and floodplain management regulations.
Acceptable earned value management system means an earned value management system that generally complies with system criteria in paragraph (b) of this clause.
Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.
Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.
Exit Management Date means each of the following:
Stationary internal combustion engine means a spark or compression ignited, reciprocating internal combustion engine which is not a portable emission unit.
Non-Administrator Ambulatory Surgical Facility means an Ambulatory Surgical Facility which does not meet the definition of an Administrator Ambulatory Surgical Facility.
High voltage bus means the electrical circuit, including the coupling system for charging the REESS that operates on a high voltage.
Earned value management system means an earned value management system that complies with the earned value management system guidelines in the ANSI/EIA-748.
Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.
Yard trimmings means grass clippings, leaves, wood chips from tree parts, and brush.
Management Accounts Date means 30 September 2017;