ASTM means the American Society for Testing and Materials.
Phase I Environmental Site Assessment means a Phase I environmental property assessment of the Assets that satisfies the basic assessment requirements set forth under the current ASTM International Standard Practice for Environmental Site Assessments (Designation E1527-13) or any other visual site assessment or review of records, reports or documents.
MI 61-101 means Multilateral Instrument 61-101 – Protection of Minority Security Holders in Special Transactions.
Environmental Site Assessment means a Phase I environmental report meeting the requirements of the American Society for Testing and Materials, and, if in accordance with customary industry standards a reasonable lender would require it, a Phase II environmental report, each prepared by a licensed third party professional experienced in environmental matters.
Site Assessment means an environmental assessment report for the Mortgaged Property prepared at Borrower’s expense by a qualified environmental consultant engaged by Borrower, or by Lender on behalf of Borrower, and approved by Lender, and in a manner reasonably satisfactory to Lender, based upon an investigation relating to and making appropriate inquiries to evaluate the risks associated with Mold and any existence of Hazardous Materials on or about the Mortgaged Property, and the past or present discharge, disposal, release or escape of any such substances, all consistent with the most current version of the ASTM 1527 standard (or any successor standard published by ASTM) and good customary and commercial practice.
Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.
chemical tanker means a ship constructed or adapted and used for the carriage in bulk of any liquid product listed in chapter 17 of the International Bulk Chemical Code;
Materials of Environmental Concern any gasoline or petroleum (including crude oil or any fraction thereof) or petroleum products or any hazardous or toxic substances, materials or wastes, defined or regulated as such in or under any Environmental Law, including asbestos, polychlorinated biphenyls and urea-formaldehyde insulation.
NI 54-101 means National Instrument 54-101 – Communication with Beneficial Owners of Securities of a Reporting Issuer;
Phase I Environmental Assessment A “Phase I assessment” as described in, and meeting the criteria of, the ASTM, plus a radon and asbestos inspection.
NI 81-106 means National Instrument 81-106 Investment Fund Continuous Disclosure;
NI 58-101 means National Instrument 58-101 Disclosure of Corporate Governance Practices;
NI 81-107 means National Instrument 81-107 Independent Review Committee for Investment Funds;
Initial Environmental Examination or “IEE” means the initial environmental examination for the Project, including any update thereto, prepared and submitted by the Borrower and cleared by ADB;
GMP means the amount proposed by Contractor and accepted by Owner as the maximum cost to Owner for construction of the Project in accordance with this Agreement. The GMP includes Contractor’s Construction Phase Fee, the General Conditions Cost, the Cost of the Work, and Contractor’s Contingency amount.
MI 11-102 means Multilateral Instrument 11-102 – Passport System;
Phase I Environmental Report means a report by an Independent Person who regularly conducts environmental site assessments in accordance with then current standards imposed by institutional commercial mortgage lenders and who has a reasonable amount of experience conducting such assessments.
Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:
NI 45-106 means National Instrument 45-106 – Prospectus Exemptions;
NI 81-102 means National Instrument 81-102 – Investment Funds.
Yard waste means leaves, grass clippings, yard and garden debris and brush, including clean woody vegetative material no greater than 6 inches in diameter. This term does not include stumps, roots or shrubs with intact root balls.
Wastewater treatment plant means a facility designed and constructed to receive, treat, or store waterborne or liquid wastes.
Process Wastewater means any water which, during manufacturing or processing, comes into direct contact with or results from the production or use of any raw material, intermediate product, finished product, by-product, or waste product.
PTCE 95-60 As defined in Section 5.02(b). PUD: A planned unit development.
Wastewater treatment tank means a tank that is designed to receive and treat an influent wastewater through physical, chemical, or biological methods.
NI 52-109 means National Instrument 52-109 – Certification of Disclosure in Issuers’ Annual and Interim Filings;