Eastern Access Phase III Surcharge definition

Eastern Access Phase III Surcharge means the tariff surcharge component for the third phase of the Eastern Access Project, as described in the Eastern Access Phase III Term Sheet and agreed to by XXXX.

Related to Eastern Access Phase III Surcharge

  • Local Access and Transport Area (LATA) Shall have the meaning set forth in 47 U.S.C.

  • Phase III means human clinical trials, the principal purpose of which is to establish substantial evidence of both safety and efficacy in patients with the disease or condition being studied, as more fully defined in 21 C.F.R. §312.21(c) or similar clinical study in a country other than the United States. Phase III shall also include any other human clinical trial intended to serve as a pivotal trial to support the submission of an application for regulatory approval.

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Access Point means a provider, public or private institution, advocacy organization, legal representative, or educational institution with staff trained to complete applications and guide individuals with a disability to needed services.

  • Lateral Access Roads has the meaning given in subclause (3)(a)(iv));

  • Local Access Transport Area (LATA) is As Defined in the Act.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Lateral Access Road Licence means a miscellaneous licence granted pursuant to subclause (6)(a)(ii) or subclause (6)(b) as the case may be and according to the requirements of the context describes the area of land from time to time the subject of that licence;

  • Development Phase means the period before a vehicle type is type approved.

  • Local Access and Transport Area or "LATA” has the meaning given to the term in the Act.

  • Entrance or access point means any opening through which an individual or extremity of an individual could gain access to radiation areas or to licensed or registered radioactive materials. This includes entry or exit portals of sufficient size to permit human entry, irrespective of their intended use.

  • Access Tandem Switch is a Switch used to connect End Office Switches to interexchange Carrier Switches. Qwest's Access Tandem Switches are also used to connect and switch traffic between and among Central Office Switches within the same LATA and may be used for the exchange of local traffic.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Open type traction battery means a type of battery requiring liquid and generating hydrogen gas released to the atmosphere.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Modular building retailer means any person who purchases or acquires a modular building from a

  • Switched Access Detail Usage Data means a category 1101xx record as defined in the EMI Telecordia Practice BR 000-000-000.

  • IntraLATA LEC Toll means IntraLATA Toll traffic carried solely by a Local Exchange Carrier and not by an IXC. "IntraLATA Toll Traffic" describes IntraLATA Traffic outside the Local Calling Area.

  • Furniture maintenance product means a wax, polish, conditioner or any other product designed for the purpose of polishing, protecting or enhancing finished wood surfaces other than floors but does not include dusting aids, wood cleaners, products designed solely for the purpose of cleaning and products designed to leave a permanent finish such as stains, sanding sealers and lacquers.

  • Busy Line Verification (BLV means a service whereby an End User requests an operator to confirm the busy status of a line.

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.

  • Access line means and be limited to retail billed and collected residential lines; business lines; ISDN lines; PBX trunks and simulated exchange access lines provided by a central office based switching arrangement where all stations served by such simulated exchange access lines are used by a single customer of the provider of such arrangement. Access line may not be construed to include interoffice transport or other transmission media that do not terminate at an end user customer's premises, or to permit duplicate or multiple assessment of access line rates on the provision of a single service or on the multiple communications paths derived from a billed and collected access line. Access line shall not include the following: Wireless telecommunications services, the sale or lease of unbundled loop facilities, special access services, lines providing only data services without voice services processed by a telecommunications local exchange service provider or private line service arrangements.

  • Start-Up Costs means all fees, costs, and expenses incurred in connection with establishing the State Mitigation Trust and the Indian Tribe Mitigation Trust and setting them up for operation. Start-up costs shall not include the cost of premiums for insurance policies.

  • Custom Local Area Signaling Service Features (CLASS) means certain call-management service features that are currently available from SBC-13STATE’s local networks. These could include: Automatic Call Back; Automatic Recall; Call Trace; Caller Identification and related blocking features; Calling Number Delivery; Customer Originated Trace; Distinctive Ringing/Call Waiting; Selective Call Forward; and Selective Call Rejection.

  • Project Start Date means the first Milestone Start Date specified in Schedule B;

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.