Erosion control measure definition

Erosion control measure means a practice or a combination of practices to control erosion and resulting sedimentation.
Erosion control measure means a structure or actions specifically designed to reduce or control lake Erie-related erosion of the shore. Examples include, but are not limited to, groins, jetties, dikes, seawalls, revetments, bulkheads, breakwaters and artificially nourished sand and/or gravel beaches.
Erosion control measure means a measure that prevents soil particles exposure and detachment.

Examples of Erosion control measure in a sentence

  • Hence, the right compensation can improve employee’s organisational commitment.

  • Erosion control measure deficiencies, as they occur, shall be immediately corrected.

  • Elements of this analysis shall at a minimum include estimates of long-term degradation or aggradation and local scour.• Erosion control measure analysis and design for elements such as riprap, geosynthetic erosion control mattresses, gabions, articulated concrete block mattresses, concrete, cement stabilized alluvium, etc.• All erosion control design measures shall be shown on the Final Onsite Drainage Map.

  • Construction Sequence Scheduling • Ensure appropriate timing of:• Temporary construction access• Location of erosion control measures to protect source control practices and downstream receiving waters• Removal and storage of excavated materials• Installation of underground utilities• Rough grading• Seeding and mulching of disturbed areas• Road construction• Final grading• Site stabilization• Installation of semi-permanent and permanent erosion control features• Erosion control measure removal5.

  • Erosion control measure on individual house lots shall be 12 inch Earth Saver Straw Wattle or have an 73% minimum sediment yield reduction value along the back of the curb or open ditch, along side property lines to the building setback line, and along both sides of the driveway to the right-of-way line.

  • BMP’s Erosion control measure means a site with necessary details, showing the property where land disturbing activity will take place and showing the locations and types of devices, procedures and practices to be used to control erosion and sedimentation.

  • Holidays and Special Closing (Make-up of Time): Amends the policy to remove the specific number of recognized holidays approved by the board.

  • Construction Sequence Scheduling• Temporary construction access• Location of erosion control measures to protect source control practices and downstream receiving waters• Removal and storage of excavated materials• Installation of underground utilities• Rough grading• Seeding and/or sodding disturbed areas• Road construction• Final grading• Site stabilization • Installation of semi-permanent and permanent erosion control features• Erosion control measure removal5.

  • Division" means the Director of the Division of Solid Waste Management or the Director's authorized representative.(56)(13) "Erosion control measure, structure, or device" means physical devices constructed, and management practices utilized, to control sedimentation and soil erosion such as silt fences, sediment basins, check dams, channels, swales, energy dissipation pads, seeding, mulching and other similar items.


More Definitions of Erosion control measure

Erosion control measure means procedures established by or approved the Commission that are intended for controlling Erosion, the movement of water or the deposition of sediment.
Erosion control measure means defined procedures intended for controlling the detachment of soil, the movement of water and/or the deposition of sediment.
Erosion control measure means a method of reducing soil erosion including seeding, using mulch or slash for ground cover, reducing slope of roads and skid trails, installing water bars, crowning roads, outsloping roads, dipping roads with lateral relief ditches, culverts and avoidance of excessive slopes.

Related to Erosion control measure

  • Control measure means any best management practice or stormwater facility, or other method used to minimize the discharge of pollutants to state waters.

  • Noise Control Measures means measures to reduce the noise emissions from the Facility and/or Equipment

  • COVID-19 Measures means any quarantine, “shelter in place,” “stay at home,” workforce reduction, social distancing, shut down, closure, sequester or any other Law, directive, guidelines or recommendations by any Governmental Authority (including the Centers for Disease Control and the World Health Organization) in each case in connection with, related to or in response to COVID-19, including the Coronavirus Aid, Relief, and Economic Security Act (CARES) or any changes thereto.

  • Structural pest control means a use requiring a license under Chapter 14 (commencing with Section 8500), Division 3, of the Business and Professions Code.

  • Preventive measures means any reasonable measures taken by any person after an incident has occurred to prevent or minimize pollution damage.

  • Controlled substance analog means a substance the chemical structure of which is substantially

  • Site Control means that Seller (a) owns the Site, (b) is the lessee of the Site under a Lease, (c) is the holder of a right-of-way grant or similar instrument with respect to the Site, or (d) is managing partner or other Person authorized to act in all matters relating to the control and Operation of the Site and Generating Facility.

  • Pandemic Measures means any quarantine, “shelter in place,” stay at home,” workforce reduction, social distancing, shut down, closure, sequester, immunization requirement, safety or similar Law, directive, guidelines or recommendations promulgated by any Governmental Authority, including the Centers for Disease Control and Prevention and the World Health Organization, in each case, in connection with or in response to a pandemic, including COVID-19.

  • Vehicle measuring attitude means the position of the vehicle as defined by the co-ordinates of fiducial marks in the three-dimensional reference system.

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Flip-In Trigger Date shall have the meaning set forth in Section 11(a)(iii) hereof.

  • Supportive measures means individualized services that are offered to the complainant or the respondent designed to restore or preserve equal access to the District’s education program or activity without unreasonably burdening the other party. The supportive measures must be non-disciplinary and non-punitive in nature; offered before or after the filing of a formal complaint or where no formal complaint has been filed; and offered to either party as appropriate, as reasonably available, and without fee or charge. Examples of supportive measures include, but are not limited to: measures designed to protect the safety of all parties or the District’s educational environment, or deter sexual harassment; counseling; extensions of deadlines or other course-related adjustments; modifications of work or class schedules; campus escort services; mutual restrictions on contact between the parties; changes in work or class locations; leaves of absence; and increased security and monitoring of certain areas of the campus.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Corrective Measure means a measure as defined in Article 3, point 16, of Regulation (EU) 2019/1020;

  • Emission control system means the electronic engine management controller and any emission related component in the exhaust or evaporative system which supplies an input to or receives an output from this controller.

  • Barrier Event means that R (final) is lower than the Barrier.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Uncontrollable Circumstance means any act, event or condition that is:

  • Effective Technological Measures means those measures that, in the absence of proper authority, may not be circumvented under laws fulfilling obligations under Article 11 of the WIPO Copyright Treaty adopted on December 20, 1996, and/or similar international agreements.

  • Access control means a system for allowing only approved individuals to have unescorted access to the security zone and for ensuring that all other individuals are subject to escorted access.

  • Vapor control system means a system that prevents release to the atmosphere of gasoline vapors in excess of 80 milligrams per liter of gasoline loaded (4.7 grains per liter).

  • Erosion and sediment control plan or "plan" means a document containing material for the conservation of soil and water resources of a unit or group of units of land. It may include appropriate maps, an appropriate soil and water plan inventory and management information with needed interpretations, and a record of decisions contributing to conservation treatment. The plan shall contain all major conservation decisions to ensure that the entire unit or units of land will be so treated to achieve the conservation objectives.

  • Equity Conditions Measuring Period means each day during the period beginning twenty (20) Trading Days prior to the applicable date of determination and ending on and including the applicable date of determination.

  • Acute pain means the normal, predicted physiological response to a noxious chemical, thermal or mechanical stimulus and typically is associated with invasive procedures, trauma and disease. Generally, acute pain is self-limited, lasting no more than a few weeks following the initial stimulus.

  • Residual disinfectant concentration (“C” in CT cal- culations) means the concentration of disinfectant measured in mg/l in a representative sample of water.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.