Examples of Fast Track Process in a sentence
All synchronous and induction machines must be no larger than 2 MW to be eligible for the Fast Track Process, regardless of location.
Certified inverter-based Small Generating Facilities located within 2.5 electrical circuit miles of a substation and on a mainline (as defined in the table below) are eligible for the Fast Track Process under the higher thresholds according to the table below.
All Small Generating Facilities connecting to lines greater than 69 kilovolt (kV) are ineligible for the Fast Track Process regardless of size.
Small Generating Facilities below these limits are eligible for review under the Fast Track Process.
The Fast Track Process is available to an Interconnection Customer proposing to interconnect its Small Generating Facility with a Connecting Transmission Owner’s Distribution System if the Small Generating Facility’s capacity does not exceed the size limits identified in the table below.