Final Drawings definition

Final Drawings shall have the meaning assigned to such term in Section 5.7(b).
Final Drawings means the detailed graphic and pictorial portions of the design documents, approved by Owner, showing the design, location and dimensions of the Work, and any amendments thereto, and including the Drawings issued by Owner and any amendments thereto.
Final Drawings means the final stamped engineering drawings for the System, and the installation thereof at the Property, to be prepared by System Owner after the Effective Date, presented to Host and included in Exhibit C.

Examples of Final Drawings in a sentence

  • Seller hereby covenants and agrees to use Commercially Reasonable Efforts to achieve Project Final Completion in accordance with the Scope of Work, the Final Drawings & Specifications, the Material Project Contracts, Laws, Prudent Industry Practices, and all other applicable terms and provisions of this Agreement (collectively, the “Requirements”).

  • Seller shall conduct the Performance Test for the Project in accordance with Exhibit J-1 to confirm that the Project complies with the Final Drawings & Specifications.

  • No changes or revisions to the Approved Final Drawings shall be made by either Landlord or Tenant unless approved in writing by both parties.

  • Landlord and Tenant shall work with one another reasonably and in good faith to resolve any differences concerning the Preliminary Space Plan and the Final Space Plan (or the Preliminary Drawings or Final Drawings hereafter referenced in Section 5.7(b) immediately below), failing which any disagreements shall be resolved in accordance with Article XII hereof.

  • The Tenant Improvements shall include any and all interior improvements to be made to the Premises as specified in the Final Drawings (defined below), as specified and agreed to by Tenant and Landlord.


More Definitions of Final Drawings

Final Drawings shall have the meaning assigned to such term in Section 5.9(b). [Note: This definition is to be included in all Continuing Term Separate Leases.]
Final Drawings means all approved drawings embodying, where required, all design modifications as approved by the Employer’s Representative.
Final Drawings means the final stamped engineering drawings for the System, and the installation thereof at the Premises, to be prepared by Supplier at its sole cost and expense after the Effective Date.
Final Drawings. The Manufacturer shall submit two hard copies of the final drawings after the Manufacturer’s design has been accepted. Final drawings shall be submitted in hard copy and electronic pdf and AutoCAD formats. 3.37.1. The minimum required drawings and details are listed in Section 5 Manufacturers Submittals. The Bid Proposal Data Form is to be filled out by the Manufacture and submitted with the Manufacture’s Bid Package:‌‌‌‌‌ P-A Base bid price per Circuit Breaker; as per specifications above, delivered in 2023, to PUD warehouse Okanogan, WA P-B Owner progress payments computed as a percentage of base bid (per circuit breaker): 15% upon order 20% at 4 months ARO 20% at 8 months ARO 20% upon successful completion of testing 25% upon final acceptance by Owner Total percent deduction (one (1) circuit breaker) offered by Manufacture for progress payments: P-C Cancellation Fee (each circuit breakers ) 2 months ARO: 4 months ARO: P-D Warranty Period (one circuit breaker) Standard Warranty period from date of energization: 3 year extended if available:‌ 5 year extended if available: 10 year extended if available:‌ P-E Field Service Representative: Representative is offered at the following rate including all expenses (each circuit breaker): P-F Formal Factory Interview: Should Manufacturer be selected for an Owner’s representative site visit and capability discussion at Manufacturer’s facility (2 people), cost: P-G Design Conference at Owner’s Facility: Cost for Manufacturer to provide design conference at Owner’s facility prior to any award by Owner to any Manufacture: P-H Powder Coating of Breaker Exterior surfaces in lieu of painting, if available. P-I Identification of Point of Manufacture, City and Country X-X Itemized cost of optional equipment (per section 3.18)
Final Drawings shall have the meaning ascribed to the term in Clause 3.2;
Final Drawings means the final designs, plans and specifications which detail the Lessor’s Work, which Final Drawings are attached to the Agreement;
Final Drawings means the building plans specifically approved by the Local Authority for the property hereby sold, substantially in accordance with one of the standard layouts set out in Schedule 3 to Annexure A which shall signed by both for identification purposes, together with the Specifications described in Schedule 1 attached to Annexure A. Should no reference to the Specifications be made in the building plans, the provisions of the Specifications shall prevail;