LNG Unloading Process definition

LNG Unloading Process means, collectively, the berthing of an LNG Carrier, the unloading of LNG, and the departure of the LNG Carrier and clearance of the port.
LNG Unloading Process means, collectively, the berthing of an LNG Carrier, the

Related to LNG Unloading Process

  • Slug loading means any pollutant, including oxygen demanding pollutants, released in a discharge at a flow rate and/or pollutant concentration as to cause interference in the POTW.

  • Loading Zone means a parking stall which is set aside for use by commercial vehicles if there is a sign referable to that stall marked ‘Loading Zone’;

  • Loading or unloading means the handling of property:

  • Processing Plant means plant systems, located on or off the Leased Premises, that include a gas processing plant, natural gasoline plant, gasoline plant, or other plant where raw unprocessed natural gas is processed to remove or extract Raw Mix from the natural gas stream to produce a Pipeline- Quality Natural Gas or Residue Gas and other products, and the Raw Mix is then either (i) separated by fractionation down to its base components prior to storage and/or transport that meets or conforms to all applicable Gas Processors Association (GPA) Standards and/or Specifications for the commercial sale of each liquefiable hydrocarbon product, or (ii) transported to another plant for separation down to its base components by fractionation prior to storage and/or transport for the commercial sale of each liquefiable hydrocarbon product. Any deductions, costs, or processing fees associated with the removal or recovery of Natural Gas Liquids is strictly limited to only that part of any Processing Plant or facility where Raw Mix is recovered, and if applicable at that plant, also fractionated to their component parts.

  • Service delivery area means the defined geographic area for delivery of program services.

  • Loading means the quantity of a specific substance present per unit of surface area, such as the amount of lead in micrograms contained in the dust collected from a certain surface area divided by the surface area in square feet or square meters.

  • Process Wastewater means any water which, during manufacturing or processing, comes into direct contact with or results from the production or use of any raw material, intermediate product, finished product, by-product, or waste product.

  • Cultivation site means a location where cannabis is planted, grown, harvested, dried, cured, graded, or trimmed, or a location where any combination of those activities occurs.

  • Designated reception site means the designated place for the reception, staging, integration, and onward movement of contractors deploying during a contingency. The designated reception site includes assigned joint reception centers and other Service or private reception sites.

  • Beam monitoring system means a system designed and installed in the radiation head to detect and measure the radiation present in the useful beam.

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI.

  • Membrane filtration means a pressure or vacuum driven separation process in which particulate matter larger than one micrometer is rejected by an engineered barrier, primarily through a size exclusion mechanism, and which has a measurable removal efficiency of a target organism that can be verified through the application of a direct integrity test. This definition includes the common membrane technologies of microfiltration, ultrafiltration, nanofiltration, and reverse osmosis.

  • Bulk mixing plant means machinery, appliances or other similar devices that are assembled in such a manner so as to be able to mix materials in bulk for the purposes of using the mixed product for construction work;

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Landscape waste means any vegetable or plant waste except garbage. The term includes trees, tree trimmings, branches, stumps, brush, weeds, leaves, grass, shrubbery, and yard trimmings.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Attachment Facilities means the facilities necessary to physically connect a Customer Facility to the Transmission System or interconnected distribution facilities.

  • Air Conditioning System Is cooling supplied to all finished rooms? Yes No Unknown Does Not Apply Comments: Is the system in operating condition? Yes No Unknown Does Not Apply Comments:

  • smart metering system means an electronic system that is capable of measuring electricity fed into the grid or electricity consumed from the grid, providing more information than a conventional meter, and that is capable of transmitting and receiving data for information, monitoring and control purposes, using a form of electronic communication;

  • Monitoring System means a system established by BNY to fulfill the Responsibilities specified in clauses (d) and (e) of Section 1 of Article III of this Agreement.

  • Interconnection Construction Service Agreement means the agreement entered into by an Interconnection Customer, Interconnected Transmission Owner and the Transmission Provider pursuant to Tariff, Part VI, Subpart B and in the form set forth in Tariff, Attachment P, relating to construction of Attachment Facilities, Network Upgrades, and/or Local Upgrades and coordination of the construction and interconnection of an associated Customer Facility. A separate Interconnection Construction Service Agreement will be executed with each Transmission Owner that is responsible for construction of any Attachment Facilities, Network Upgrades, or Local Upgrades associated with interconnection of a Customer Facility.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Sewer System means pipelines or conduits, pumping stations, force mains, vehicles, vessels, conveyances, injection wells, and all other constructions, devices, and appliances appurtenant thereto used for conducting sewage or industrial waste or other wastes to a point of ultimate disposal or disposal to any water of the state. To the extent that they are not subject to section 402 of the federal Water Pollution Control Act, ditches, pipes, and drains that serve only to collect, channel, direct, and convey nonpoint runoff from precipitation are not considered as sewer systems for the purposes of this part of this division.

  • Metering System means all meters and metering devices (including current transformers and potential transformers) owned by the Company and used to measure Dependable Capacity and the delivery by the Company and receipt by BPDB of Net Energy Output;

  • Cannabis processing facility means a person that: